Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Eprocure
Opening Date11 Oct 2024
Closing Date21 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

As Per Sbd

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All kinds of Soil =

1

89

89.75

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing and laying dry stone soling hand packed tightly.

1

1320

1320

... More
Providing and laying Cement Concrete 1:4:8 mix with 40mm nominal size stone agg excluding cost of centring and shuttering.

1

5202

5202.9

... More
Providing and laying in position reinforced Cement Concrete 1:1.5:3 mix excluding cost of centring, shuttering and reinforcement. All work upto plinth level. Footing of Columns.

1

7788

7788.4

... More
Providing and laying in position reinforced Cement Concrete 1:1.5:3 mix excluding cost of centring, shuttering and reinforcement for walls, Columns etc. Columns

1

9395

9395.7

... More
Providing and laying in position reinforced Cement Concrete 1:1.5:3 mix excluding cost of centring, shuttering and reinforcement forSuspended floors, Beams etc.

1

9821

9821.85

... More
Centring and shuttering including removal of Form Work in:-

-

-

-

... More
Foundations, footings. Col. Footing

1

286

286.35

... More
Beams Foundation Beam

1

577

577.55

... More
Columns

1

742

742.55

... More
Providing reinforcement for Reinforced cement concrete including cutting, bending, binding etc all complete. (TMT bars)

1

123

123.2

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required Reveted and bolted

1

142

142.9

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. ISMB-450 & ISMB-250

1

120

120.8

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

1

181

181.6

... More
Clearing jungle incl. up rooting of rank vegiataion, gross, brush, wood, trees and saplings of grith upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outrside the periphery of the area cleared

1

12

12.49

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work

-

-

-

... More
LS = 1000 Sqm

1

197

197.8

... More
Providing and fixing GI pipes (B medium) complete with GI fittings excl. trenching and reffiling etc (External work/for rsing main and delivery main of OHT

-

-

-

... More
150mm dia

1

2256

2256

... More
100mm dia

1

1434

1434

... More
Providing and fixing D.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). Confirming to IS:14846 read with latest amendments.

-

-

-

... More
100 mm dia. Class 1

1

14594

14594

... More
150mm dia

1

22439

22439

... More
Providing & fixing of MS fittings viz bends of suitable degree, tees, collars etc to be fabricated from 6mm Nominal Size MS plate as per the requirement of site including cost of welding. The work should be leakproof and should be painted with anti corrosive red oxide primer. Complete Job.

1

147

147.82

... More
Providing and fixing of MS flanged joints (12mm thick) to double flanged GI/DI pipes including cutting of pipes, welding charges, cutting of flanges, rubber gasket, bolts, nuts including testing of joint and sorts of carriages. Complete Job.

-

-

-

... More
150 mm dia. Pipe

1

2150

2150

... More
100mm dia

1

1520

1520

... More
Carriage of Materials from Source upto site of work by Mechanical Transport includingh loading, Unloading and stacking complete. avg 20 Km's

-

-

-

... More
Cement and Steel reinforcement 20km

1

364

364.33

... More
Structural steel from Srg 75 km

1

903

903.88

... More
Sand 20mm aggregate 20km

1

409

409.44

... More
20mm aggregate 20km

1

409

409.44

... More
40mm aggregate 20km

1

445

445.64

... More
Earth for disposal upto 1km

1

160

160.93

... More
Extra for earth for filling avg 1 km

1

160

160.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.