Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date18 May 2024
Closing Date12 Jun 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling manually /Mechanically including stacking of serviceable material and disposal of unserviceable material within 50 Meter lead Water Bound macadam road

1

156

156.3

... More
Dismantling tile work in floors and roof laid in cement mortar including stacking material with in 50 Meteres lead For Thickness of tiles 10 mm to 25 mm

1

56

56.95

... More
Dismantling tile work in floors and roof laid in cement mortar including stacking material with in 50 Meteres lead For thickness of tiles above 25 mm and upto 40 mm.

1

89

89.75

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material in with 50 mtrs lead in 1: 3: 6 or richer mix.

1

1725

1725.2

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material in with 50 mtrs lead in 1:4:8 or richer mix

1

1064

1064.55

... More
Laying and fitting of GI pipes complete excluding cost of pipes and earth work 15 mm dia

1

22

22.25

... More
20 mm dia.

1

22

22.25

... More
25 mm dia

1

33

33.7

... More
32 mm dia.

1

33

33.7

... More
40 mm dia.

1

44

44.85

... More
50 mm dia.

1

44

44.85

... More
65 mm dia.

1

80

80.3

... More
80 mm dia ( L )

1

80

80.3

... More
80 mm dia ( M )

1

80

80.3

... More
100 mm dia ( L)

1

118

118.45

... More
100 mm dia ( M)

1

118

118.45

... More
150 mm dia ( L)

1

118

118.45

... More
150 mm dia ( M)

1

118

118.45

... More
Providing and fixing of GI pipes complete with G.I fittings excluding tenching and refilling etc. ( external work) 15 mm dia

1

179

179.2

... More
20 mm dia.

1

227

227.9

... More
25 mm dia

1

311

311.85

... More
32 mm dia.

1

384

384

... More
40 mm dia.

1

434

434.65

... More
50 mm dia.

1

532

532.8

... More
65 mm dia.

1

745

745.1

... More
80 mm dia ( L )

1

878

878.25

... More
80 mm dia ( M )

1

1151

1151.2

... More
100 mm dia ( L)

1

1255

1255.15

... More
100 mm dia ( M)

1

1434

1434

... More
150 mm dia (M)

1

2256

2256.9

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 100 mm dia Ductile Iron Class K - 7 Pipes

1

1379

1379.55

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 150 mm dia Ductile Iron Class K - 7 Pipes

1

1934

1934.7

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 200 mm dia Ductile Iron Class K - 7 Pipes

1

2200

2200

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 250 mm dia Ductile Iron Class K - 7 Pipes

1

2514

2514.45

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 300 mm dia Ductile Iron Class K - 7 Pipes

1

3141

3141.1

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 350 mm dia Ductile Iron Class K - 7 Pipes

1

3723

3723.8

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 400 mm dia Ductile Iron Class K - 7 Pipes

1

4459

4459.45

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 450 mm dia Ductile Iron Class K - 7 Pipes

1

5400

5400.6

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 500 mm dia Ductile Iron Class K - 7 Pipes

1

6107

6107.95

... More
Providing and laying S&S Centrifugally Cast (Spun)/ Ductile Iron Pipes conforming to IS : 8329 600 mm dia Ductile Iron Class K - 7 Pipes

1

7866

7866.8

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 25 mm dia to 50 mm dia.

1

300

300

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 65 mm dia to 100 mm dia.

1

500

500

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 125 mm dia to 150 mm dia.

1

800

800

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 200 mm dia.

1

1000

1000

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 250 mm dia.

1

1100

1100

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 300 mm dia.

1

1250

1250

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 350 mm to 450 mm dia.

1

1450

1450

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM 500 mm to 600 mm dia

1

1600

1600

... More
Dismantling GI pipes (External work) including excavation and refilling after taking out the pipes, manually/ by mechanical means including stacking of pipes with in 50 Mtrs lead 15mm to 40 mm dia nominal bore

1

109

109.65

... More
Dismantling GI pipes (External work) including excavation and refilling after taking out the pipes, manually/ by mechanical means including stacking of pipes with in 50 Mtrs lead Above 40 mm nominal bore.

1

121

121.65

... More
Dismantling CI pipes including excavation and refilling trenches after taking out the pipes manually by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site with 50 Mtrs lead as per direction of Engineer incharge Upto 150 mm dia.

1

303

303.05

... More
Dismantling CI pipes including excavation and refilling trenches after taking out the pipes manually by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site with 50 Mtrs lead as per direction of Engineer incharge Above 150 mm to 300 mm dia.

1

402

402.1

... More
Dismantling CI pipes including excavation and refilling trenches after taking out the pipes manually by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site with 50 Mtrs lead as per direction of Engineer incharge Above 300 mm dia.

1

525

525.6

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 100 mm dia.

1

398

398

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 125 mm dia.

1

588

588.55

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 150 mm dia.

1

595

595.95

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 200 mm dia.

1

791

791.95

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 250 mm dia

1

990

990

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 300 mm dia.

1

1192

1192.4

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 350 mm dia.

1

1217

1217.15

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 400 mm dia.

1

1599

1599.1

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 450 mm dia.

1

1793

1793.45

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 500 mm dia.

1

1896

1896.75

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but including the cost of pig lead 600 mm dia.

1

2568

2568.55

... More
Filling available excavated earth (excluding rock ) in trenches, plinth sides of foundation etc. Layers not exceeding 20 cm in depth, consolidating each deposited layers lead upto 50 M and lift upto 1.5 M

1

180

180.55

... More
Disposal of surplus excavated earth complete Job upto 1 Km by Mech Transport ( Carriage)

1

160

160.93

... More
Chequrred precast cement concrete tiles 22 mm thick in footpath and courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and clearing etc. complete on 20 mm thick bed of cement mortar 1: 4 (1 cement: 4 coarse sand) excluding cost of tiles ordinary cement without any pigment

1

903

903.85

... More
Supply of Fitter ( 2nd class)

1

734

734

... More
Supply of Labour (Mazdoor)

1

553

553

... More
Supply of Masson a) Ist Class

1

806

806

... More
Supply of Masson a) 2nd class

1

734

734

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 100 mm dia.

1

94

94.8

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 150 mm dia.

1

150

150.35

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 200 mm dia.

1

221

221.9

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 250 mm dia.

1

270

270.65

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 300 mm dia.

1

346

346.2

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 350 mm dia.

1

367

367.6

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 400 mm dia.

1

564

564.2

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 450 mm dia.

1

653

653.6

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 500 mm dia.

1

697

697.55

... More
Providing Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing including the cost of rubber gasket 600 mm dia.

1

936

936.55

... More
Laying in position S & S or flanged CI special such as Tees bends, collars, tappers and caps etc (excluding cost of specials).

1

511

511.55

... More
Locating/ Tracing of blockages/ leakages including excavation of pits.

1

734

734

... More
Carriage of department material from Divisional store to site of work average distance 10 Kms by Mechanical Transport (Paid as per actual distance involved at site shall be paid as per S.S. of rates 2020) G.I.Pipe and fitting.

1

248

248.03

... More
Carriage of department material from Divisional store to site of work average distance 10 Kms by Mechanical Transport (Paid as per actual distance involved at site shall be paid as per S.S. of rates 2020) Cement

1

248

248.03

... More
Carriage of department material from Divisional store to site of work average distance 10 Kms by Mechanical Transport (Paid as per actual distance involved at site shall be paid as per S.S. of rates 2020) sand

1

279

279.04

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 100 mm dia

1

6

6.1

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 150 mm dia

1

10

10.16

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 200 mm dia

1

16

16.53

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 250 mm dia

1

23

23.49

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 300 mm dia

1

29

29.04

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 350 mm dia

1

40

40.66

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 400 mm dia

1

55

55.45

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 450 mm dia

1

66

66.77

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 500 mm dia

1

66

66.77

... More
Carriage of pipe avg. 10 Kmt by MT Ductile Iron/ M.S.Pipes 600mm to 800mm dia

1

101

101.66

... More
Carriage of Departmental material from stacking place to site of work average 200 Mtrs by Head Load ( Paid as per actual distance involved at site) G.I. Pipe and fitting

1

211

211.01

... More
Carriage of Departmental material from stacking place to site of work average 200 Mtrs by Head Load ( Paid as per actual distance involved at site) Cement

1

211

211.01

... More
Carriage of Departmental material from stacking place to site of work average 200 Mtrs by Head Load ( Paid as per actual distance involved at site) Steel

1

359

359.5

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 200mm dia

1

4446

4446.85

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 150mm dia

1

2415

2415.7

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 100mm dia

1

1696

1696.75

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 80mm dia

1

1600

1600

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 65mm dia

1

1400

1400

... More
Replacement of C.I sluice valves/Check valves complete with bolts, nuts, rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 50mm dia

1

1200

1200

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 150mm dia

1

900

900

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 100mm dia

1

750

750

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 80mm dia

1

650

650

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 65mm dia

1

432

432.85

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 50mm dia

1

271

271.75

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 40mm dia

1

208

208.7

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 25mm dia

1

161

161.85

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends, collars, unions and other allied items 20mm dia

1

138

138.65

... More
Making connection of G.I distribution branch with G.I main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 25 to 40mm nominal bore

1

730

730.25

... More
Making connection of G.I distribution branch with G.I main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 50 to 80mm nominal bore

1

1387

1387.25

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 100 mm dia

1

5

5.7

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 150 mm dia

1

8

8.04

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 200 mm dia

1

12

12.06

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 250 mm dia

1

21

21.19

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 300 mm dia

1

26

26.52

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 350mm dia

1

37

37.92

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 400 mm dia

1

44

44.12

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 450 mm dia & 500mm dia

1

58

58.83

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load Ductile Iron/ MS Pipes. 60 mm dia, 700mm dia, 750m,m dia & 800mm dia

1

64

64.71

... More
Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1 M above ground level and removal of rubbish upto 1 distance of 50 m outside the periphery of the area cleared

1

12

12.49

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like

1

167

167.8

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-all work upto plinth level 1:3:6 (1 cement: 3 coarse sand 6 Graded stone aggregate of 20 mm nominal size) (Crushed)

1

5733

5733.6

... More
Demolishing dry brick pitching in floors,drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 meters lead

1

934

934

... More
Dry brick on edge flooring with bricks of class designation 75 on a bed of 12mm cement mortar including filling joints with fine sand (1:4mix) ( with F.P.S bricks)

1

1046

1046.2

... More
Brick work with common burnt clay FPS (non-modualar) bricks of class designation 75 in foundation and plinth in Cement Mortar 1:4 (1 cement : 4 coarse sand)

1

7877

7877.4

... More
Brick work with common burnt clay FPS (non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1: 6 (1 cement: 6 coarse sand)

1

7890

7890.2

... More
Half Brick masonry with bricks of class designation 75 in foundation and plinth in Cement Mortar 1:4 (1 cement : 4 coarse sand)

1

947

947.25

... More
Providing and laying in position cement concrete excluding the cost of centering, shuttering, finishing all work upto plinth level (1: 4: 8) 1. Cement: 4 coarse sand 8 Graded stone aggregate 40mm nominal size) crushed.

1

5202

5202.9

... More
Dry stone pitching 225 mm thickness including cost of stone and preparation of surface “Nallah”.

1

335

335.6

... More
Dry stone pitching (any thickness) excluding cost of stones On Horizontal

1

535

535.55

... More
Dry stone pitching (any thickness) excluding cost of stones On Top copings of banks

1

673

673.8

... More
Dry stone pitching (any thickness) excluding cost of stones On Slopes

1

693

693.95

... More
Hand packing stones in wire-crates, excluding cost of crates and stones

1

371

371.15

... More
Grouting of stone pitching using M-10 nominal mix concrete (max size of aggregate 20 mm nominal) @ 3.65 cum per 100 sqm on horizontal/ side slopes,complete including curing (Nallah)

1

199

199.3

... More
Dumping of stone (excluding cost of stone) in horizontal on level.

1

237

237.9

... More
supply of stone boulders (nallah) nominal size 225 mm (stack measurement reduced by 15%)

1

700

700

... More
Demolishing Brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead In cement mortar

1

1458

1458.45

... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 M (stacks of cleaned bricks shall be measured) from brick work in cement mortar

1

4

4.94

... More
Silt clearance from canals, inclusive of initial lead and lift (50 m and 1.5m respectively a) Dry

1

111

111

... More
Silt clearance from canals, inclusive of initial lead and lift (50 m and 1.5m respectively a) Wet

1

184

184.95

... More
Slip clearance in soils; mixed with moorum/ kankar/ shingle/ boulders, disposal lead upto 50 M and lift upto 1.5 M

1

331

331.15

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Sand average distance 10 Km by MT

1

279

279.04

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Bajri above 40 mm average distance 10 Km by M.T.

1

303

303.34

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Bajri Below 40 mm average distance 10 KM by M.T.

1

279

279.04

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Stones average distance 10 Km by Mech. Transport.

1

303

303.34

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Bricks average distance of 10 Km by Mech, transport

1

-

0.74

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) Tiles average distance of 10 km by Mech. Transport.

1

-

0.45

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Sand

1

331

331.74

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Bajri below 40 mm.

1

331

331.74

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Stone aggregate 40 mm and above

1

358

358.63

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Stones

1

390

390.28

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Bricks.

1

-

0.62

... More
Carriage of material from stacking place to site of work average 200m by Head Load. Brick Tiles

1

-

0.39

... More
Carriage of Alum from site of stacking up to bed of filtration plant by way of engaging labour

1

553

553

... More
Clearance of GSR/ST/Dug well/OHT/Intake Tank by way of deploying labour and disposal of rubbish as per direction of Engineer-in- charge

1

553

553

... More
Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate ) All works upto plinth level

1

6591

6591.25

... More
Providing and laying cement concrete 1:1.5:3 mix Walls

1

9395

9395.7

... More
Providing and laying cement concrete 1:1.5:3 mix Slabs

1

9821

9821.85

... More
Reinforcement of RCC

1

123

123.2

... More
Whitewashing one or more coat on old work

1

10

10.8

... More
Welding with Gen Set

1

6

6.2

... More
Minor repair of bathroom

1

15000

15000

... More
Form work for walls

1

628

628.95

... More
Form work for Foundtion

1

286

286.35

... More
Form work for Suspended floors/ roof

1

718

718.2

... More
Form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers.

1

577

577.55

... More
Form work for Edges of slab

1

262

262.2

... More
RCC 1:1.5:3 all work upto plinth level

1

7788

7788.4

... More
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)

1

241

241.25

... More
Removing white colour wash by scraping and sand papering and preparing the surface smooth incl. necessary repairs to scratches etc. complete

1

14

14.5

... More
White washing with lime to give an even shade on New Work (three or more coats)

1

29

29.95

... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)

1

98

98.75

... More
Applying priming coat: With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood)

1

64

64.6

... More
Applying priming coat: With ready mixed aluminum primer of approved brand and manufacture on resinous wood and ply wood

1

61

61.4

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works

1

53

53.6

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel work (second coat)

1

28

28.85

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work

1

197

197.8

... More
Distempering with dry distemper of approved brand and manufacture (one or more coats) and of required shade on old work to give an even shade

1

52

52.95

... More
Painting with oil type wood preservative of approved brand and manufacture an old work (one or more coat)

1

41

41.9

... More
Renewing glass planes with putty and nail wherever necessary incl. taking out old putty float glass panes of thickness 4.0 mm

1

991

991

... More
Repair to plaster thickness 12mm to 20 mm in patches of area 2.5 sqm incl. cutting patches in proper shape and plastering wall surface with white cement polymer self curing incl. disposal of rubbish. All complete

1

532

532.75

... More
Loading unloading of material by way of engaging labour

1

553

553

... More
Barricading by way of fitting of G.I. pipes (15mm)

1

30

30

... More
Barricading by way of fitting of G.I. pipes (20mm)

1

40

40

... More
Barricading by way of fitting of G.I. pipes (25mm)

1

46

46

... More
Barricading by way of fitting of G.I. pipes (32mm)

1

72

72

... More
Barricading by way of fitting of G.I. pipes (40mm)

1

95

95

... More
Repair of gate by way of weldiing and other material required

1

181

181.6

... More
Engagement of sweeper

1

553

553

... More
Opening of old wire crates and rebinding after filling

1

35

35.6

... More
Hand packing stone in wire crate excluding cost of crates and stones

1

371

371.15

... More
Providing and fixing of check valve: a)100 mm dia

1

4453

4453.85

... More
b) 80 mm dia

1

3479

3479.55

... More
c) 65 mm dia

1

2337

2337.55

... More
Providing and fixing of Sluice valve: a)100 mm dia

1

4453

4453.85

... More
b) 80 mm dia

1

4000

4000

... More
c) 65 mm dia

1

3500

3500

... More
d) 50 mm dia

1

3000

3000

... More
Providing and fixing of gun metal gate valve: a) 80 mm dia

1

2605

2605.15

... More
65 mm dia

1

1646

1646.05

... More
b) 50 mm dia

1

986

986.15

... More
c) 40 mm dia

1

834

834.6

... More
d) 32 mm dia

1

750

750

... More
e) 25 mm dia

1

691

691.7

... More
f) 20 mm dia

1

513

513.4

... More
Note :- (1) If any item/ items not advertised in the above rate list but found necessary to be executed at site. The same shall be paid as per SSR 2022 on Contractors Appreciation / Depreciation.

-

-

-

... More
Note :- (2) Any item either not advertised or not provided in SSR 2022 shall be paid as per actual lowest market rates.

-

-

-

... More
Note :- (3) Any other dia of pipes/ pipe specials if required shall be issued by the department as per prevailing stock rates of the division.

-

-

-

... More
Note :- (4) The material which is issued by the Department, the cost of material shall be deducted as per prevailing stock rates of this Division

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.