Public Health Engineering Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Civil And Construction
Construction Material
Pipe Line Project
Eprocure
Opening Date20 Oct 2022
Closing Date10 Nov 2022
Tender Amount₹ 1,72,42,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ORDINARY ROCK

3043.12

-

855.65

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

10955.25

-

198.7

... More
Providing and laying hand packed stone soling 50 mm nominal size including filling, spreading, dressing, ramming, all leads lifts and all carriages complete.

22.78

-

1320

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)

22.5

-

6434.01

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

23.58

-

4861.84

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

40.96

-

7800.76

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

46.55

-

9408.14

... More
Reinforced cement concrete work in arches, arch ribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size

12.63

-

10404.52

... More
Centering and shuttering including strutting, propping etc. and removal of form for: foundation footings

16.4

-

262.3

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

451.22

-

573.85

... More
Arches, domes, vaults upto 6 m span

114.46

-

2086.8

... More
Extra for shuttering in circular work (20% of respective centering and Shuttering items)Foundations, footings, bases of columns etc. for mass concrete.

13.6

-

52.46

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

310.02

-

114.77

... More
Arches, domes, vaults upto 6 m span

114.46

-

417.36

... More
Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement)

598

-

57.9

... More
Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level. TMT bars

8365

-

87.18

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded

300

-

102.14

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate.

70.85

-

505

... More
12mm Cement plaster finished with a floating coat of neat cement of mix:1:3 mix

549.2

-

343.75

... More
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 to 20mm dia GI pipe

5500

-

20.25

... More
25 mm and 32 mm dia. G.I. pipes

3000

-

30.65

... More
40 mm and 50 mm dia. G.I. pipes

5000

-

40.8

... More
65 mm and 80 mm dia. G.I. pipes

3000

-

73.05

... More
Laying in position centrifugally cast (spun) iron S&S or flanged pipes

4526

-

245.55

... More
Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket 100mm dia

167

-

89.7

... More
150 mm dia pipes

3167

-

144.7

... More
Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 20 to 40mm nominal bore

50

-

666.25

... More
50 to 80 mm nominal bore

30

-

1268.25

... More
Providing and laying D.I. standard specials such as tees, bends, collars, tapers, caps etc. suitable for flanged jointing as per IS : 9523 (as per site requirement) 15mm nominal bore

40

-

318.85

... More
Providing and fixing D.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). Confirming to IS:14846 read with latest amendments.100mm dia

2

-

13164

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - SAND: 5kms

69.96

-

206.28

... More
Beyond 5 km upto 10 km per km

108.52

-

74.58

... More
Beyond 10 km upto 20 km per km (total lead=20km)

108.52

-

121.44

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Aggregate 20mm 5kms

105.41

-

206.28

... More
Beyond 5 km upto 10 km per km

105.41

-

74.58

... More
Beyond 10 km upto 20 km per km (total lead=20km)

105.41

-

121.44

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Aggregate 40mm and above :5kms

20.31

-

224.2

... More
Beyond 5 km upto 10 km per km

20.31

-

81.08

... More
Beyond 10 km upto 20 km per km (total lead=20km)

20.31

-

132.02

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Stone Soling :5kms

22.78

-

242.67

... More
Beyond 5 km upto 10 km per km

22.78

-

87.75

... More
Beyond 10 km upto 20 km per km (total lead=20km)

22.78

-

142.83

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Cement:5kms

61.48

-

183.36

... More
Beyond 5 km upto 10 km per km

61.48

-

66.3

... More
Beyond 10 km upto 20 km per km (total lead=20km)

61.48

-

107.99

... More
Carriage of G.I./D.I pipes below 100mm dia from Stocking yard to the site by mechanical means 5kms

51.05

-

183.36

... More
Beyond 5 km upto 10 km per km

51.05

-

66.3

... More
Beyond 10 km upto 20 km per km

51.05

-

107.99

... More
Beyond 20 km per additional km (total lead = 30km)

51.05

-

88.32

... More
Carriage of G.I/D.I. pipes 100mm dia from Stocking yard to the site by mechanical means 5km

1000

-

4.5

... More
Beyond 5 km upto 10 km per km

1000

-

1.63

... More
Beyond 10 km upto 20 km per km

1000

-

2.65

... More
Beyond 20 km per additional km (total lead = 35km)

1000

-

3.26

... More
Carriage of G.I/D.I. pipes 150mm dia from Stocking yard to the site by mechanical means 5kms

19000

-

7.51

... More
Beyond 5 km upto 10 km per km

19000

-

2.72

... More
Beyond 10 km upto 20 km per km

19000

-

4.42

... More
Beyond 20 km per additional km (total lead =(60km)

19000

-

14.48

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- (Sand) ist 50m

69.96

-

209.9

... More
Beyond Ist 50m (total lead=1000mtr)

108.52

-

868.32

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Aggregate Below 40mm ist 50m

105.41

-

209.9

... More
Beyond Ist 50m (total lead=1000mtr)

105.41

-

868.32

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Aggregate 40mm and Above ist 50m

20.31

-

226.92

... More
Beyond Ist 50m (total lead=1000mtr)

20.31

-

938.68

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Stone Soling ist 50m

22.78

-

246.94

... More
Beyond Ist 50m (total lead=1000mtr)

19.68

-

1021.5

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Cement ist 50m

61.48

-

121.57

... More
Beyond Ist 50m (total lead=1000mtr)

61.48

-

338.9

... More
Carriage of G.I./D.I pipes below 100mm dia from dumping site to actual site of work by manual means ist 50m

15.08

-

153.25

... More
Beyond Ist 50m (total lead=500mtr)

15.08

-

202.45

... More
Carriage of G.I./D.I pipes 100mm dia from dumping site to actual site of work by manual means ist 50m

1500

-

4.14

... More
Beyond Ist 50m (total lead=1000mtr)

1500

-

11.55

... More
Carriage of G.I./D.I pipes 150 mm dia from dumping site to actual site of work by manual means ist 50m

19000

-

5.83

... More
Beyond Ist 50m (total lead=5000mtr)

19000

-

84.74

... More
LEVELLING/ DRESSING OF GROUND/ BEAUTIFICATION

1

-

250000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.