Pradhan Mantri Gram Sadak Yojana Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Apr 2025
Closing Date21 Apr 2025
Tender AmountRefer Documents
Costs
EMD
₹ 20,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_JKRRD_140086_12Bid Award Id
ViewTender No
PMGSY/DIV/UDH-I/43 OF 2025-26 Dated 03-04-2025Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Snow depth over 250 mm but upto 350mm
1
2
2.45
... More
Snow depth over 350 mm but upto 450mm
1
2
2.85
... More
Snow depth over 450 mm but upto 550 mm
1
3
3.25
... More
Snow depth over 550 mm but upto 650 mm
1
3
3.4
... More
Snow depth over 650 mm but upto 750 mm
1
3
3.6
... More
Snow depth over 750 mm but upto 850 mm
1
3
3.8
... More
Snow depth over 850 mm but upto 950 mm
1
3
3.95
... More
Snow depth over 950 mm but upto 1050 mm
1
4
4.15
... More
Snow depth over 1050 mm but upto 1150 mm
1
4
4.35
... More
Snow depth over 1150 mm but upto 1250 mm
1
4
4.7
... More
Galla Cutting in Compressed Snow
-
-
-
... More
1200mm deep and 4m wide
1
9
9.85
... More
Slip Clearance
-
-
-
... More
Slip clearance in ordinary soil incl. safe disposal with all leads and lifts etc. complete job. including Safe disposal as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property.
1
154
154.15
... More
Slip clearance in soils mixed with moorum kankar/shingle/Boulders incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property.
1
331
331.15
... More
Slip clearance in soils mixed with decomposed soils, by blasting or any other means incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property.
1
411
411.4
... More
Slip clearance in meduim/ hard rock by blasting incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property.
1
492
492.7
... More
Excavation for structures Earthwork in excavation for structures as per drawing and technical specifications clauses 305.1 including setting out, construction of shorting and bracing removal of stumps and other deleterious material and disposal upto and lead of 50m, dressing of slides and bottom and backfilling in trenches with excavated suitable material upto 3m depth including dewatering if required hard soil 70% soft rock 20% hard rock 10%
1
714
714.4
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia G.I wire conforming to IS:280 and IS:4826 in 100 mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints weighing not less than 25 Kg each as per drawings & Technical specification Clause 1301 including all leads, lifts, carriages, handling, re-handling and including cost of wire crates complete
1
2975
2975.5
... More
Polygonal/Random Rubble Masonry laid dry un coursed brought to course in sub structure including cost of bond/through stones, also including all leads, lifts, carriages,of materials by MT handling and re-handling complete.
1
4755
4755.6
... More
Providing and laying reinforced cement concrete NP3 pipes 1000 mm dia for culverts on concrete bedding in single row including fixing collar with cement motar 1:2 (1 cement : 2 sand) excluding excavation, protection works, back filling cement concrete and masonry work in head walls parapets clause 1106 but including all leads, lifts, carriages, handling, re-handling complete.
1
6920
6920
... More
Providing and laying reinforced cement concrete NP3 pipes 600 mm dia for culverts on concrete bedding in single row including fixing collar with cement motar 1:2 (1 cement : 2 sand) excluding excavation, protection works, back filling cement concrete and masonry work in head walls parapets clause 1106 but including all leads, lifts, carriages, handling, re-handling complete.
1
3245
3245
... More
Providing and laying of RBM filling incl. Cost of consolidation and all leads,lifts and carriages complete.
1
700
700
... More
Filling available excavated earth (exculding rock) intrnches, plinth sides of foundation etc in layer not exceding 20 cm in depth consilidating each deposited layer ramming and watering, lead upto 50 m and lift upto 1.50 m
1
218
218.4
... More
Back filling behind abutment , using boulder in wing wall and return wall as per drawings and technical specification clause 1204.3.8 also including all leads, lifts, carriages, handling and re-handling complete
1
1427
1427.72
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements