Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Road Construction
Eprocure
Opening Date7 Apr 2025
Closing Date16 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Doda On Emergency Basis I.e (motorable Paths Only) By Way Of Snow Clearance,

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dry random rubble masonry with hard stone in foundation and plinth Without bond stone Nallah

1

2793

2793.8

... More
Dumping stone including cost of stones. in Horizontal on level

1

937

937.9

... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres

-

-

-

... More
All kinds of soil

1

256

256.85

... More
Ordinary Rock

1

493

493.5

... More
Hard Rock (Requiring Blasting )

1

810

810.85

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil

1

479

479.3

... More
Slip Clearance

-

-

-

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
In soils; mixed with moorum / Kankar / shingle / boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
In soils; mixed with Decomposed Rocks; by blasting or any other means

1

411

411.4

... More
In medium hard rocks ; by blasting

1

492

492.7

... More
In hard rocks; by blasting

1

686

686.3

... More
Clearing snow (With Frost) from roads manually using picks and showels: snow depth upto 150 mm

1

4

4

... More
Clearing snow (Without Frost) from roads manually:

-

-

-

... More
Snow depth upto 150 mm

1

1

1.8

... More
Snow depth over 150 mm but upto 250 mm

1

2

2.3

... More
Snow depth over 250 mm but upto 350 mm

1

2

2.45

... More
Snow depth over 350 mm but upto 450 mm

1

2

2.85

... More
Snow depth over 450 mm but upto 550 mm

1

3

3.25

... More
Snow depth over 550 mm but upto 650 mm

1

3

3.4

... More
Snow depth over 650 mm but upto 750 mm

1

3

3.6

... More
Snow depth over 750 mm but upto 850 mm

1

3

3.8

... More
Snow depth over 850 mm but upto 950 mm

1

3

3.95

... More
Snow depth over 950 mm but upto 1050 mm

1

4

4.15

... More
Snow depth over 1050 mm but upto 1150 mm

1

4

4.35

... More
Snow depth over 1150 mm but upto 1250 mm

1

4

4.7

... More
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and ompacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge

1

1885

1885.95

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)

1

5402

5402.9

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using 20% plum Nallah

1

4774

4774.46

... More
Hand-packing stones in wire-crates; including cost of stones but excluding cost of crates

1

1071

1071.15

... More
Supply of wire Crate at site of Mesh Size 50 mm x 50 mm and dia of wire mesh 4mm

1

6000

6000

... More
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

1

1880

1880.3

... More
Providing / laying PVC pipe including excavating, Refilling and fitting complete job 4 incl dia

1

450

450

... More
Providing / laying PVC pipe including excavating, Refilling and fitting complete job 8 incl dia

1

600

600

... More
Carriage of Materials

-

-

-

... More
Sand / Bajree for an Avg. distance of 40 Kms by MT

1

630

630.74

... More
Stone for an Avg. distance of 5 Kms by MT

1

236

236.16

... More
Excavated earth/slips average lead of 01 km.

1

160

160.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.