Pradhan Mantri Gram Sadak Yojana Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Jun 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Restoration By Way Of By Way Of Clearance Of Snow/slips/crates Works Likely To Occur During Financial Year 2024-25.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
A) Excavation in hilly areas in hard rock not requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2

1

584

584.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

1

613

613.84

... More
Polygonal Rubble masonry brought to course, laid dry, with nallah stone, in Foundation & Plinth/substructure, incl. cost of through /Bond stones Including all carriages by Mechanical Transport, leads and lifts etc complete

1

3708

3708.45

... More
Backfilling behind return wall /B/wall / Create Work complete job 60 % Stone & 40 % Earth including Carriage with complete Job

1

792

792.99

... More
Providing and laying reinforced cement concrete NP3 pipes conforming to IS 458:2003 for culverts material in single row including fixing collar with cement mortar 1:2 ( 1 cement : 2 sand) excluding excavation protection works, back filling cement concrete and masonry work in head walls parapets clause 1106 but including all leads ,lifts, carriages handling re-handling and including cost of pipes complete 1000mm dia. Including all carriages by Mechanical Transport, leads and lifts etc complete

1

8386

8386.09

... More
Providing and laying reinforced cement concrete NP3 pipes conforming to IS 458:2003 for culverts material in single row including fixing collar with cement mortar 1:2 ( 1 cement : 2 sand) excluding excavation protection works, back filling cement concrete and masonry work in head walls parapets clause 1106 but including all leads ,lifts, carriages handling re-handling and including cost of pipes complete 750mm dia. Including all carriages by Mechanical Transport, leads and lifts etc complete

1

7566

7566.94

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to 15:200 and 15:4826 in 100 mm x 100 mm mesh (woven diagonally) Including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 Including all carriages by Mechanical Transport, leads and lifts etc complete

1

3015

3015.03

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 Including all carriages by Mechanical Transport, leads and lifts etc complete

1

797

797.63

... More
Slip Clearance in Soils mixed with moorum/Kankar/ Shingle /Boulders; disposal lead upto 50 m and lift upto 1.5m.

1

331

331.15

... More
Slip Clearance in Soils mixed with Decomposed Rocks by blasting or any other means.

1

411

411.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.