Pradhan Mantri Gram Sadak Yojana Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date22 Nov 2024
Closing Soon30 Nov 2024
Tender Amount₹ 1,41,66,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying of plain cement concrete of Grade M-15 in open structure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work including all leads and lifts and carriages of materials by MT complete.

103.3

-

-

... More
Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete.

24.48

-

-

... More
Providing and laying of plain Cement concrete of Grade M-20 in open Foundation complete as per drawings & Technical specification Clauses 802, 803, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete.

9.06

-

-

... More
Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete.

1.43

-

-

... More
Providing and laying of Reinforced Cement concrete M-25 in Sub-Structure complete as per drawings & Technical specification Clauses 800, 1205.40 & 1205.50 Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete.

9.54

-

-

... More
STONE MASONRY IN CM : Polygonal/ Random Rubble masonary, uncoursed/ brought in course in 1:6 CM (1 cement: 6 fine sand mortar), with nallha stone in foundation and plinth including levelling up at specified levels with M-5 nominal mix (mix Size of stone agg. 20mm nominal) concrete including cost of through/ bond stones of M-15 size (450mm x 150mmx150mm) @ 7 Nos/Cum of stone masonry or 2.0Nos./Sqm of stone masonry including all leads and lifts and carriages of materials by MT complete. .

105.33

-

-

... More
DRY STONE MASONRY: Polygonal/ Random Rubble masonary, nallah stone, laid dry in foundation and plinth including cost of Bond stones of M-15 size (450mm x 150mm x 150mm) @ 7Nos/Cum OR 2.0Nos./Sqm of stone masonry including all leads and lifts and carriages of materials by MT complete.

43.54

-

-

... More
Supply , fitting and placing HYSD Bar Fe415 in sub structure complete as per drawings and technical specification clause 1002,1010 and 1202 including carriage of materials by mechanical transport, all leads and lifts complete.

0.48

-

-

... More
Back filling behind abutment, wing wall and return wall as per drawings and technical specification clause 1204.3.8 including all leads, lifts, carriages of materials by MT handling and re-handling complete. ( With Available Stone)

9.6

-

-

... More
Total Part-I

1

-

-

... More
PART-II ROUTINE MAINTENANCE PRE/POST RENEWAL COAT FOR 05 YEARS)

1

-

-

... More
1st year 10 % of Maintenance Cost

1

-

-

... More
2nd Year 15 % of Maintenance Cost

1

-

-

... More
2nd Year 20 % of Maintenance Cost

1

-

-

... More
2nd Year 25 % of Maintenance Cost

1

-

-

... More
2nd Year 30 % of Maintenance Cost

1

-

-

... More
Total Part-II =

1

-

-

... More
PART-III RENEWAL OF BITUMENOUS SURFACE

1

-

-

... More
Providing , laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -III as per Technical specification Clause 405. WBM Grading-III by mechanical means (in two layers). Including all carriages by Mechanical Transport including all leads and lifts etc. complete.

38.25

-

-

... More
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per Sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 including all leads and lifts and carriages of materials by MT complete. .

15450

-

-

... More
30mm thick SDBC providing laying and rolling of SDBC of 30mm thickness By hot mix plant and pavers. including all carriages by Mechanical Transportincluding all leads and lifts and carriages of materials by MT complete.

15450

-

-

... More
Berm filling with approved material obtained from borrow pits with a lifts upto 1.50m transporting to site, spreading, grading required slope and compacted with a lead upto 1000m asper Technical Specification clause 301.5

200

-

-

... More
Kilometre Stone Reinforced Cement concrete M-15 grade Kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (a) 5 Kilometre Stone (Precast)

1

-

-

... More
Kilometre Stone Reinforced Cement concrete M-15 grade Kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (b) Ordinary Kilometre Stone (Precast)

6

-

-

... More
Kilometre Stone Reinforced Cement concrete M-15 grade Kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 (c) 200 m Stone Precast)

25

-

-

... More
Providing and fixing of retro-reflectorised cautionery, mandatory and informatory sign as per IRC: 67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminum sheeting 1.5mm thick supported on mild steel angle iron post 75x75x6mm firmly to the ground by means of property designed foundation with M-15 grade cement concrete 450mm x 450mm x 600mm below grond level as per drawing and Technical specification clause 801. (60cm equilateral triangle) including all leads, lifts and carriages of materials by MT complete.

25

-

-

... More
Total Part-III =

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.