Pradhan Mantri Gram Sadak Yojana Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil Works Roads
Eprocure
Opening Date19 Jun 2020
Closing Date1 Jul 2020
Tender Amount₹ 44,34,000
Costs
EMD
₹ 88,680Document Cost
₹ 6,000Tender Fee
Refer Documents
Summary
Construction And Maintenance Of Road From Bonibagh To Bonibaghbala (balance Work) Stage I And Ii, Phase V, Package No. Jk13-14, Length 1.2 Km Pmgsy Division Ganderbal.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_KSRRD_94882_1Bid Award Id
ViewTender No
JK1314Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bit. Macadam: P/L Bituminous Macadam 50mm thick. with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder VG-10 @ 3.5% minimum, transported to site of work upto required lead , laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)
214.5
-
-
... More
20mm thick OGPC: Providing, laying and rolling of open- graded premix carpet of 20mm thickness composed of 13.20 mm to 5.60mm size aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant laying and rolling with a three wheel 80-100KN static roller capacity finished to required level and grade to be followed by the seal coat of either type-A,Type-B or Type-C as per technical specification clause 508. by Mech. means using bitumen. (S-90)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)
4290.01
-
-
... More
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B(S-90) as per Technical Specification Clause 510 & 510.2 with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)
4290.01
-
-
... More
Construction of Earthen shoulder with approved material deposited at site from Roadway cutting and excavation from foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 includingall leads, lifts, loading unloading .(Finished work to be measured, complete)
1011.6
-
-
... More
PCC wall / Flume
-
-
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material in all type of soil upto 3m depth. )including all leads, lifts,etc (Finished work to be measured, complete)
16.35
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-15 Nominal mix 1:2.5:5), )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)
51.6
-
-
... More
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications Clause 1205.6 including cost and carriage of steel with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)
39
-
-
... More
Road Furniture
-
-
-
... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703, )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) 5th km stone precast
2
-
-
... More
Providing & fixing of traffic sign board as per clause1701.2.3 & IRC-67
3
-
-
... More
Maintenance for Five Years
-
-
-
... More
1st Year
1
-
47500
... More
2nd Year
1
-
71250
... More
3rd Year
1
-
95000
... More
4th Year
1
-
118750
... More
5th Year
1
-
142531
... More
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
-
-
-