Pradhan Mantri Gram Sadak Yojana Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date14 Aug 2018
Closing Date20 Aug 2018
Tender Amount₹ 1,14,08,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade 802, 803, 1202 and 1203 including loading, unloading complete job.

147.38

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade 802, 803, 1202 and 1203 including loading, unloading complete job.

9.83

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC M-25 Grade 802, 803, 1202 and 1203 including loading, unloading complete job.

3.06

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

0.2

-

-

... More
Pavement

-

-

-

... More
Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level,watered,graded and compacted in layers to meet requirement of Tables 300.1 and300.2 for subgrade construction as per technical specification clause 303.5.2.

1271.3

-

-

... More
Granular sub-base :- Granular sub-base course with local materials nallah /quarry (Table 400.13)by mix in place method normal, Construction of granular sub-base by providing local material spreading in uniform layers with mortor grader/ manually on prepared surface , mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401,401.4 as per Technical Specification Clause 408 (using naturally occuring gravel) including loading, unloading, haulages,octroi charges and royality complete.(finished work to be measured).

1698.8

-

-

... More
WMM: Providing, laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug miller), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density including lighting, barricading & maintenance of diversion, etc as per tables 400.11 & 400.12 & technical specification clause 406

870.63

-

-

... More
Prime Coat :- Providing and applying (medium Porosity) Primer coat with bitumen emulsion (SS-1) V.G-10 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm as per Technical Specification Clause 502. Including cost, loading, unloading, haulage octroi charges etc complete (finished work to be measured).

6965

-

-

... More
Bituminous Macadam :- Providing and laying bituminous macadam (50mm thick) with hot mix plant using crushed aggregates of grading as per table 500.3 and 500.4 premixed with bitumen binder V.G -10, not less than 3.3 % laid over a previously prepared surface with paver finisher to the required camber,grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. Including loading, unloading, haulage octroi charges etc complete (finished work to be measured).

348.25

-

-

... More
Tack Coat: Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per Technical Specification Clause 503.

6965

-

-

... More
20mm OGPC:- Providing, laying and rolling of open- graded premix carpet of 20mm thickness composed of 13.20 mm to 5.60mm size aggregates either using penetration grade bitumen V.G-10 to required line, grade, camber and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with 80-100 K.N,finished to required level and grade as per Technical Specification Clause 508.By Mechanical Means .Including loading, unloading, haulage octroi charges etc complete (finished work to be measured).

6965

-

-

... More
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grades and cross fall using Type B bitumen (S-90) as per Technical Specification Clause 510 and 510.2.3 by mechanical means (S-90) Including loading, unloading, haulage, octroi charges etc complete (finished work to be measured).

6965

-

-

... More
Earthen Shoulders :- Development of earthen shoulders with approved material obtained from borrow pits as per technical specification clause 407.

904

-

-

... More
Hard shoulders :- Development of shoulders using granular sub base/base/surface course with local material (table 400.13) by mix in place method normal construction of granular sub base by providing local material spreading in uniform layers with mortor garder on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408. Using Naturally occuring gravel.

904

-

-

... More
Road Furniture

-

-

-

... More
Providing and fixing retro- refllectorised cautionary , mandatory and informatory sign as per IRC :67 made of encapsulated lense type reflective sheeting wide clause 1701, 2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75 x75 x6mm steel tube firmly fixed to the ground by properly designed foundation with M-15 grade cement concrete 450 x450 x 600mm , 600mm below round level as per drawing and technical clause 801.

35

-

-

... More
Citizen infarmative board :- Providing and fixing of citizen information Board as per Techanical Specifications , drawing &details.

2

-

-

... More
Kilometer Stone Reinforced cement concrete M-15 grade KM stone /local stone of standard design as per IRC -8, fixing in position including painting and printing etc. as per drawing and technical specification clause 1703 ordinary Km stone (precast)

3

-

-

... More
AMC for 1st Year

1

-

92639.19

... More
AMC for 2nd Year

1

-

138958.78

... More
AMC for 3rd Year

1

-

185278.38

... More
AMC for 4th Year

1

-

231597.97

... More
AMC for 5th Year

1

-

277917.56

... More
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.