Pradhan Mantri Gram Sadak Yojana Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Nov 2022
Closing Date10 Dec 2022
Tender Amount₹ 5,78,44,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete

55

-

584.9

... More
Crate work

80

-

234.85

... More
Clearing & grubbing road land including uprooting wild vegetation , grass, bushes ,shrubs, saplings & trees of girth up to 300mm , removal of stumps of such trees cut earlier & disposal of unserviceable materials up to a lead of 1000M including removal & disposal of top organic soil not exceeding 150mm in thickness as per technical specifications clause 201 (in area of non thorny jungle).By Mechanical means

2.12

-

35258.63

... More
Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.

-

-

-

... More
300 - 600 mm Girth

200

-

242.27

... More
600 - 900 mm Girth

178

-

408.88

... More
EARTHWORK

-

-

-

... More
Excavation for roadway in soil using Mechnically means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

2519.38

-

70.75

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause

4500

-

135.35

... More
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. by mechanical means

3000

-

18.22

... More
PAVEMENT

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

10500

-

11.04

... More
Granular sub-base Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

2500

-

1318.14

... More
WMM Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1050

-

2591.18

... More
Prime coat:_Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502( low porosity) )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

10500

-

53.99

... More
Tack coat:-Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

27912.5

-

15.88

... More
50mm th bt. maccadam:-Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1395.63

-

8073.03

... More
20mm thick OGPC :- Providing, laying and rolling of open- graded premix carpet of 20mm thickness composed of 13.20 mm to 5.60mm size aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity ,finished to required level and grade to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.By Mechanical Means Bitumen (S-90)

27912.5

-

168.49

... More
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C (S-90) as per Technical Specification Clause 510 (By Manual Means) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

27912.5

-

66.47

... More
Hard Shoulders :-Providing, laying, spreading and compacting stone aggregates WBM G-II of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1060

-

1882.93

... More
PIPE CULVERTS

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

160.42

-

282.6

... More
Providing and laying for plain cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

13.5

-

4787.29

... More
roviding and laying for plain cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15 including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

78.54

-

4898.95

... More
Providing and laying of cement concrete pipes NP-3 (burried conduits)as per design in single row including fixing collor with cement mortar 1:2 but excluding excavation ,protection works,backfilling, concrete masonary work in head walls and parapets clause 1106. including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

-

-

-

... More
300mm

40

-

2685.4

... More
500mm

60

-

3590.6

... More
1000mm

40

-

7643.97

... More
Back filling behind abutment, wing, wall, return wall, complete as per drawings and technical specification clause 1204.3.8.(Granular material )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

158.92

-

1240.18

... More
PROTECTION WORK PCC WALL

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

1490.85

-

282.6

... More
Type B Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) Including cost and carriage of all materials from approved source to site including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

243.2

-

1159.45

... More
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

243.2

-

4787.29

... More
Providing and laying concrete for plain Cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15 including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

2275.2

-

4898.95

... More
Providing and fixing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1584

-

236.63

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8.(Boulder material) Including cost and carriage of all materials from approved source to site with all leads and lifts and octori etc complete job (Finished work to be measured).

3205

-

938.42

... More
PCC DRAIN

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal incl all leads and lifts dressing of sides and bottom and backfilling in trenches with excavated suitable material.

1218.75

-

282.6

... More
Providing and laying (First Class Type B) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

165

-

1159.45

... More
Providing and laying Plain cement concrete for plain cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

165

-

4787.29

... More
Providing and laying Plain cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

620

-

4898.95

... More
Providing and laying Plaincement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

18.75

-

5492.59

... More
Providing and laying Reinforcement cement concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC M-20 Grade including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

40.5

-

6163.57

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

3.5

-

70241.68

... More
ROAD FURNITURE

-

-

-

... More
Providing and Fixing PMSGY LOGO boards as per drawings and specifications (Starting Point) with all leads, lifts, loading unloading handling , Re-handling and octori.(Finished work to be measured, complete .)

2

-

4000

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be we

2

-

12949.69

... More
Maintenance board :- Providing and fixing of citizen information Board as per Techanical Specifications , drawing &details.

1

-

16000

... More
Providing & fixing PMGSY citizen Information Boards as per drawings and technical specifications

2

-

16000

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Ordinary Kilometer Stone (Precast) with all leads, lifts, loading unloading handling , Re-handling and octori.(Finished work to be measured, complete .)

6

-

2091.56

... More
200m Stone Reinforced cement concrete M-15 grade 200m stone /local stone of standard design as per IRC -8, fixing in position including painting and printing etc. as per drawing and technical specification clause 1703 ordinary Km stone (precast) Chapter 10,10.10

28

-

451.2

... More
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

25

-

3030.06

... More
Providing and applying of 2.5 mm thick road marking rectroreftive shade for speed breakers /zebra crossing/Stopline of specified shade/colour using hot thermoplastic material by fully/semi automatic thermoplastic paint applicable machine fitted with profile shoe,glass beads dispencer,propane tank heater and profile shoe heater,driven by experienced operator on road surface including cost of material,labour T&P including all laed and lift to site of work. .Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

1485

-

483

... More
Total Construction cost

1

-

1

... More
Maintenance for five years

-

-

-

... More
1st year

1

-

619747.25

... More
2nd Year

1

-

929620.87

... More
3rd Year

1

-

1239494.49

... More
4th Year

1

-

1549368.11

... More
5th Year

1

-

1859241.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.