Power Development Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date3 May 2025
Closing Date24 May 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Rate Contract For Maintenance And Upkeep Of 33 Kv Lines And 33 11 Kv Receiving Sub Stations In Distt. Udhampur ,reasi And Ramban Under Std Udhampur Jpdcl For The Year 2025 26

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 09 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole, (9 mtr. Long )including digging of pits, disposal of extra earth, collection of boulders and filling back.

1

4500

4500

... More
Dismantling of ACSR Conductor (100mm2) and stacking

1

20

20

... More
Dismantling of ACSR Conductor and stacking (150mm2)

1

25

25

... More
Dismantling of ACSR Conductor andstacking (200mm2)

1

30

30

... More
Collection of ACSR Cond. And Stringing,tensioning , binding of ACSR Conductor, (100mm2 ACSR Conductor)

1

30

30

... More
Collection of ACSR Cond. And Stringing,tensioning , binding of ACSR Conductor, (150mm2 ACSR Conductor)

1

35

35

... More
Collection of ACSR Cond. and Stringing,tensioning , binding of ACSR Conductor, (200mm2 ACSR Conductor)

1

40

40

... More
Dismentalling of Steel Tubular Pole including carriage upto dumping site, (13 mtr. Long ) up to distance of 50 mtrs

1

4500

4500

... More
Dismentalling of Steel Tubular Pole including carriage upto dumping site, (11 mtr. Long )up to distance of 50 mtrs

1

4000

4000

... More
Dismentalling of Steel Tubular Pole including carriage upto dumping site, (9 mtr. Long )up to distance of 50 mtrs

1

3500

3500

... More
Straightening of tilted Steel Tubular Pole (13 mtr. Long )

1

1000

1000

... More
Straightening of tilted Steel Tubular Pole (11 mtr. Long )

1

900

900

... More
Straightening of tilted Steel Tubular Pole (9 mtr. Long )

1

800

800

... More
Painting of 13 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (13 mtr. Long )

1

450

450

... More
Painting of 11 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (11 mtr. Long )

1

400

400

... More
Painting of 09 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (9 mtr. Long )

1

350

350

... More
Cement Bottoming (U/G,A/G) in 1:3:6 mix including excavation and form work including cost of material/ shuttering etc

1

9000

9000

... More
Excavation of Earth including shifting of disopal at a distance of 50 mtrs

1

1000

1000

... More
Fixing of Galvanised spiral Earthing of SWG No. 8, G.I wire of 115 turns confirming to REC-J1 construction standard, (J1)

1

1500

1500

... More
Fixing of 33KV Galvanised Guy Set(Guy wire,Guy Rods,Turn Buckle plate ,Guy Insulators) confirming to IS 2141 / 1979 or the latest version thereof, (Guy Set)

1

650

650

... More
Replacement of damaged Ties

1

100

100

... More
Fixing of 33 kv Disc Insulator (Porcelain )

1

450

450

... More
Fixing of 33 kv Disc Insulator (Polymer )

1

451

451

... More
Fixing of 33 kv Disc fitting

1

350

350

... More
Fixing of 33KVm Pin Insulators (10 KN) standards, (Porcelain )

1

100

100

... More
Fixing of 33KVm Pin Insulators (10 KN) standards, (Polymer )

1

200

200

... More
Fixing of 33KV G.I Pins with all accessories .

1

100

100

... More
Repair of 33 KV Isolator with blade

1

2000

2000

... More
Re-erection of uprooted poles

1

3500

3500

... More
Re-erection of uprooted Guy Set

1

1800

1800

... More
Dismantling of Jumper set

1

350

350

... More
Erection of Jumper set

1

450

450

... More
Dismantling of Guy Rod complete

1

600

600

... More
Dismantling of Disc Insulator with fitting

1

250

250

... More
Dismantling of Pin Insulator with Pin

1

100

100

... More
Fixing of X-arms of different sizes (100x50x50x6 mm channel Iron,50x50x6mm Angle Iron ) duly painted with one coat of red-oxide and two coats of silver paint fixing with different sizes and sorts of nuts,bolts and washers, (Channel Iron X-arms, Angle Iron-X-arms, Pole Tops)

1

80

80

... More
Dismantling of X-arms, bracess, ties of different sizes

1

15

15

... More
Repair and re-erection of Cradle for guardnetting with GI wire 8no including wire binding, cutting /bending of GI Wire as per REC standards

1

80

80

... More
Route clearence by way of cleaning bushes and vegetation & making temp. path for easay carriage of line material

1

20

20

... More
Branch cutting/cutting of trees, (Route/corridor of 33kv lines)

1

2500

2500

... More
Loading/ Unloading of following material and shifting upto 50 mtrs

-

-

-

... More
Steel Tubular Pole (13 mtr. Long )up

1

800

800

... More
Steel Tubular Pole (11 mtr. Long )

1

700

700

... More
Steel Tubular Pole (9 mtr. Long )

1

650

650

... More
Steel of Sorts , (Steel)

1

10

10

... More
Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor)

1

5

5

... More
11KV VCB Panel

1

4000

4000

... More
Battery Bank

1

2000

2000

... More
AC Board/C Board/

1

1500

1500

... More
Battery Charger

1

2000

2000

... More
33KV VCB Panel

1

5000

5000

... More
33KV C&R Panel

1

2000

2000

... More
Distribution Transformer

-

-

-

... More
a)(25KVA)

1

600

600

... More
b) 63KVA

1

1500

1500

... More
c) 100KVA

1

2000

2000

... More
XLPE Power Cable of sizes a) (120 mm2)

1

50

50

... More
b) 185mm2

1

70

70

... More
c) 240mm2

1

90

90

... More
d) 400mm2

1

120

120

... More
Transformer Oil Barrel

1

300

300

... More
11KV Isolator

1

300

300

... More
33 KV Isolator

1

400

400

... More
Shifting of material with additional distance upto 100 mtrs

-

-

-

... More
Steel Tubular Pole (13 mtr. Long )up

1

400

400

... More
Steel Tubular Pole (11 mtr. Long )

1

350

350

... More
Steel Tubular Pole (9 mtr. Long )

1

350

350

... More
Steel of Sorts , (Steel)

1

5

5

... More
Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor)

1

5

5

... More
11KV VCB Panel

1

2000

2000

... More
Battery Bank

1

1000

1000

... More
AC Board/C Board/

2

1000

2000

... More
Battery Charger

1

1000

1000

... More
33KV VCB Panel

1

2000

2000

... More
33KV C&R Panel

1

1000

1000

... More
Distribution Transformer a)(25KVA)

1

500

500

... More
b) 63KVA

1

850

850

... More
c) 100KVA

1

1000

1000

... More
XLPE Power Cable of sizes a) (120 mm2)

1

20

20

... More
b) 185mm2

1

30

30

... More
c) 240mm2

1

40

40

... More
d) 400mm2

1

220

220

... More
Transformer Oil Barrel

1

100

100

... More
11KV Isolator

1

100

100

... More
33 KV Isolator

1

150

150

... More
33/ 11 KV Switchyard works

-

-

-

... More
33 KV VCB Repairs & Renovation by way of a) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system

1

4000

4000

... More
b) Replacement of Tripping Coil/Closing coil

1

600

600

... More
c) Replacement of Damaged Vacuum Interrupter

1

3000

3000

... More
d) Replacement of Bushing including Clamps

1

400

400

... More
e) Rectification of Wiring up to the terminal plate of Breaker

1

3000

3000

... More
33 KV MOCB Repairs & Renovation by way of a) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system

1

3500

3500

... More
b) Replacement of Tripping Coil/Closing coil

1

700

700

... More
c) Replacement of Transformer Oil

1

3500

3500

... More
d) Replacement of Damaged Fixed & Moving Contacts

1

700

700

... More
e) Replacement of Bushing including Clamps

1

700

700

... More
f) Rectification of Wiring up to the terminal plate of Breaker

1

3500

3500

... More
Repair of 33KV C&R Panel by way replacement of different equipments a) Ammeter/Volt Meter

1

250

250

... More
b) Indication Lamps/Fuses

1

15

15

... More
c) Trip Close Switch/Selector Switch

1

400

400

... More
d) Identification of Panel Wiring Faults & its rectification

1

1500

1500

... More
e) Different Relays - MIT Numerical Relay / Electro-mechanical relay / Master Trip Relay/ Differential Relay/Auxillary Relay etc.

1

2500

2500

... More
Control /Protection wiring of VCB Panels

1

3500

3500

... More
Complete testing of Relays Setting of Testing Kit, Interconnection between various points of pannel with respect to secondary injection key on various current taps, recording the observation thereof. All modifications necessary to achieve desired results.

1

3000

3000

... More
Control Cable Laying of Control Cable of all types on racks in cable duct including binding with PVC Belts/ Binding Wire, Peeling of insulation and fixing of proper size thimble connecting the cable after identification of each core to both ends i.e. Pannel to CTs / panel to PTs /panel to Breaker and Making functional of 33 KV Outdoor Breakers, Protection ,Alarms, Annunciation (complete Job)

1

30

30

... More
Upkeep of Existing Earthing System.

1

2500

2500

... More
Replacement of damaged earth mesh in Sub-Station as per standards.

1

150

150

... More
Excavation of trenches of 0.6 Mtr Depth and 7.5 mtrs in normal soil / hard soil

1

500

500

... More
Laying of MS Flat and MS Rod in deep excavated trench and welding of MS Flat & MS Rod with Mesh.

1

100

100

... More
Earthing with Spikes of MS Rod 20mm, 3 Mtr in Length as per REC Drawing J.2

1

900

900

... More
33/11 KV Power Transformer- Preventive maintenance a) Opening of Transformer Tank Top Cover (if required to facilitate maintenance of transformer after removing the required accessories). b) Preventing of leakage by changing main gaskets after removing the old gasket. c) Change of HV LV Busing, Ring and Rubber Washers, Draining/ Re-Filling of required Oil, Change of gaskets of valves/ radiators/ buchloze's relay radiators valves. d) Cleaning of Scale deposited over the body and radiators of the power transformer with thinner/ detergent and de-rusting in perfect manner. e) Replacement of any one of the following i.e. temperature indicators, silica gel, gas operated buchloz's relay, oil temperature indicator, winding temperature indicator of power transformer of capacity given hereunder:-

-

-

-

... More
i)10MVA

1

20000

20000

... More
ii) 6.3 MVA

1

18000

18000

... More
iii) 5 MVA

1

15000

15000

... More
ii) 4 MVA

1

12000

12000

... More
v) 3.15 MVA

1

10000

10000

... More
vi) 2.5 MVA

1

6000

6000

... More
Topping of oil in Power Transformer of all Capacities

1

3000

3000

... More
Filteration of Transformer oil with Mechanical Fiteration Plant

1

50

50

... More
Bus Bar, Jumpers, Droppers in 33 KV Outdoor Yard as below

-

-

-

... More
i) Checking and tightening of jumpers

1

3000

3000

... More
ii) Replacement of T/PG clamps

1

600

600

... More
iii) Replacement of Connectors of bus bar including transformer and equipments

1

600

600

... More
iv) Replacement of damaged bus bar conductor including re-jumpering

1

200

200

... More
v) Replacement of post insulators, Disc insulators including its hardware.

1

600

600

... More
LA works

-

-

-

... More
a)Replacement of 33 KV & 11 KV Lightening Arrestor including jumpering and earth connecting in all respect. (if separate earthing is not provided for LA the same shall be provided in accordance with the provision for activicity)

1

1800

1800

... More
b) Separate pipe Earthing as per REC Drawing J.2

1

2500

2500

... More
33 KV Isolators Repair & Renovation of 33kv line isolator including setting right its operation

1

3000

3000

... More
11 KV Isolators Repair & Renovation of 33kv line isolator including setting right its operation

1

1800

1800

... More
Replacement of post insulator / jaws / tendon pipes / clamps/ operating box

1

600

600

... More
33 KV CTs Repairs & Renovation of 33 KV CTs by way of replacing shorting strips, connecting rod, transformer oil, damaged insulator of ratings :

-

-

-

... More
a) 400-200/5 A

1

3500

3500

... More
b) 250-125/5 A

1

3000

3000

... More
c) 150-75/5 A

1

2500

2500

... More
33 KV PTs Combined Unit a) Erection of 33 KV CT, PT combined unit on existing structure including minor modification

1

3000

3000

... More
b) Insulation, testing as per norms and commissioning of new 33 KV combined CT PT Sets (All Sizes) on erected spots including jumpering crimping of lugs, charging earth connection of body and conducting pre commissioning test before energization and satisfactory operation in all respects

1

2000

2000

... More
Steel Structures & Gantry, Column a) Fixing of missing members of gantry structures column, beams etc.

1

3500

3500

... More
b) Tightening of nuts & bolts, replacement of oval thread bolts, chipping by way of welding to the bolts after tightening

1

2000

2000

... More
c) Painting with mix red oxide paint two coats of approved make on steel works after cleaning with wire brush/ sand paper

1

10

10

... More
d) Painting of steel structure erected in outdoor yard with aluminum paint two coats with approved brand and fixture to given an even surface

1

15

15

... More
Replacement of damaged Aux. Transformer complete job including fixing of busbar and cable of ratings :

-

-

-

... More
a) 25 KVA

1

4500

4500

... More
b ) 63 KVA

1

5500

5500

... More
c) 100 KVA

1

6000

6000

... More
Deweeding of vegetation in outdoor yard a) Removing of stone metal, deweeding of unwanted vegetation, spreading of stone metal collected earlier for removal of vegetation, leveling the area with existing stone metal

1

25

25

... More
b) Providing of additional stone metal and its carriage and laying in outdoor yard, this includes breaking of stones complete job.

1

109

109

... More
Fixing of chain link fencing of control room/ yard/ receiving station complete job.

1

150

150

... More
Control room works

-

-

-

... More
Battery Chargers, a) Repair & maintenance of battery charger

1

4000

4000

... More
Battery Bank, AC / DC Board a) Repair & maintenance of battery set 32 V ( 16 nos cells) including maintaining specific gravity, electrolyte level, cleaning, checking, tightening of battery terminals in all respects it includes measuring and rectifying of voltage of each battery.

1

3000

3000

... More
b) Repair and maintenance of AC/DC Board, identification of fault in respect of cable and its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job.

1

2200

2200

... More
Control Room facelift a) Cleaning of Control Room, removing dirt & dust from the pannels, walls, cleaning of fixtures

1

3500

3500

... More
b) Painting of internal/external walls and roof by approved brand of emulsion

1

40

40

... More
c) Painting of door and window pannels of control room by approved brand of paint

1

50

50

... More
11 KV, VCB, OCB a) Repairs & Renovation of 11 KV VCB, OCB by way of replacement of i) Grid-support assembly with 11 KV female replacement of cup for panel along with trolley bush rod

1

3000

3000

... More
ii) Male & Female Contacts

1

800

800

... More
iii) Copper Bus Bar & strips

1

800

800

... More
iv) Tripping Coil, tripping assembly & Tripping rollers

1

800

800

... More
v) Closing Coil/Closing Assembly

1

800

800

... More
vi) Complete wiring of VCB, C&R Panel (Wornout)

1

800

800

... More
b) Replacement of damaged CTs of different ratio Testing the CT with the help of primary injection set fixing in pannel, fixing the secondary connection after assessing the load (complete job)

1

2500

2500

... More
d) Replacement of 11 KV damaged PT

1

1500

1500

... More
e) Replacement of blown fuses, checking the PT terminal with respect of 11 KV bus bar complete job.

1

1000

1000

... More
11 KV Power Cables / 33 KV Power cables a) Identification of damaged portion of cable, tracing of cable, remove cable from trench, carriage and laying of cable (complete job) including cleaning of cable trenches.

1

80

80

... More
b) Replacement of damaged cable of sizes

1

150

150

... More
c) Erection of termination kits of different sizes, connecting the cable with pannel and outgoing structures after crimping of lugs fixing with nuts and bolts, checking of earth point, connecting the earthing point of cable with existing earthing system . i) 11 KV Indoor Termination Kit (3-Phase)

1

3000

3000

... More
ii) 11 KV Outdoor Termination Kit (3-Phase)

1

3000

3000

... More
iii) 33 KV Indoor Termination Kit (Single Phase)

1

2000

2000

... More
iv) 33 KV Outdoor Termination Kit (Single Phase)

1

2000

2000

... More
Misc Items. a) Improvement of earthing system in control room by way of replacement of earthing risers from earthing point to panel / checking of all welding points/ re-welding of lose connection, laying of fresh / additional earth-mat strip to improve the existing earthing system

1

5500

5500

... More
Dismantling of 11KV VCB/OCB Panel set complete job

1

15000

15000

... More
Erection of 11KV VCB/OCB Panel set complete job ;-

1

30000

30000

... More
Flash in 33 KV & 11 KV Panels due to overloading moisture Cleaning of carbonized panel by petrol / cotton cloth, replacement of damaged / worn-out lugs, post insulator, Bakelite sheet, arcing chamber panel heaters etc.

1

5000

5000

... More
Power transformer works

-

-

-

... More
Checking and operating of each switch gear/ trip circuit of LT panel for their proper functioning in case of male functioning to be rectified immediately

1

1900

1900

... More
Recording of IR values of transformers

1

1000

1000

... More
Checking of earthing pits and recording of earth resistance in case high taking corrective action to reduce it to desired value

1

900

900

... More
Testing of earthing of each panel on HT & LT

1

900

900

... More
Checking and ensuring that all the installation are properly earthed in case of some disconnection to be connected to the same

1

1000

1000

... More
Dismantling of 33/11KV Power Transformer from the foundation. 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA

1

4800

4800

... More
Filteration of Transformer oil with Mechanical Fiteration Plant

1

25

25

... More
Servuicing/ Routine maintenance of Mechanical Fiteration Plant by way of checking compressors/ control cables/ motors/ contactor/ greasing etc.

1

30000

30000

... More
Dragging and Loading of 33/11KV Power Transformer . 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA

1

4500

4500

... More
Un-loading and Dragging of 33/11KV Power Transformer . 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA

1

4500

4500

... More
Erection, Testing and Commissioning of 33/11KV Power Transformer. 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA

1

7800

7800

... More
Transportation charges/Carriage of 33/11KV Power Transformer to loading/erection site of ratings below:

-

-

-

... More
a) 2.5 MVA

1

1000

1000

... More
b) 3.15 MVA

1

1200

1200

... More
c) 4.0 MVA

1

1300

1300

... More
d) 5.0 MVA

1

1500

1500

... More
e) 6.3 MVA

1

1800

1800

... More
f) 10 MVA

1

2000

2000

... More
Hire charges for Moving Hyrdulic Crane for loading/ Unloading og Power Transformers 10 MVA

-

-

-

... More
a) 0 to 7 km

1

37000

37000

... More
b) 7 to 15 km

1

40000

40000

... More
c) 15 to 30 km

1

53000

53000

... More
c) 30 to 50 km

1

65000

65000

... More
c) 50 to 100 km

1

90000

90000

... More
c) 100 to 200 km

1

150000

150000

... More
Hire charges for Moving Crane for loading/ Unloading og Power Transformers 6.3/ 5 MVA

-

-

-

... More
a) 0 to 7 km

1

32000

32000

... More
b) 7 to 15 km

1

35000

35000

... More
c) 15 to 30 km

1

45000

45000

... More
c) 30 to 50 km

1

53000

53000

... More
c) 50 to 100 km

1

75000

75000

... More
c) 100 to 200 km

1

100000

100000

... More
Hire charges for Moving Crane for loading/ Unloading og Power Transformers 3.15/ 4 MVA

-

-

-

... More
a) 0 to 7 km

1

29000

29000

... More
b) 7 to 15 km

1

32000

32000

... More
c) 15 to 30 km

1

42000

42000

... More
c) 30 to 50 km

1

51000

51000

... More
c) 50 to 100 km

1

69000

69000

... More
c) 100 to 200 km

1

91000

91000

... More
Fabrication works

-

-

-

... More
Fabrication of steel of size for Guy Road, x-armes, braces, ties, column, beams, equipments structures etc

1

50

50

... More
Making of holes in ST Poles

1

600

600

... More
Dismantling of existing of 33KV Isolators with/with out blades and replacement with new one on the already existing structure

1

5000

5000

... More
Fabrication of Earthing Spikes of MS Steel of Sorts as per standards

1

50

50

... More
Replacement of 11KV Knife set/Horn Gap set by new 11KV Isolators set

1

5000

5000

... More
Installation of equipments on existing structures including Testing and Commissioning.

-

-

-

... More
33 KV VCB

1

16500

16500

... More
33 KV C & R Panel

1

12000

12000

... More
33 KV CT

1

8500

8500

... More
34 KV PT

1

5200

5200

... More
35 KV LA set

1

2750

2750

... More
36 KV Isolator

1

5500

5500

... More
11 KV VCB

1

2500

2500

... More
11 KV Cable straight through joints

1

2000

2000

... More
11 KV Cable termination kits

1

2000

2000

... More
11 KV horizontal type isolators

1

5500

5500

... More
33 KV ABC cable of sizes( 185/ 240/ 300 sqmm) Over head

1

500

500

... More
33 KV XLPE cable 3 core of sizes ( 185/ 240/ 300 sqmm) Underground/ Overhead

1

265

265

... More
33 KV 1 core XLPE cable of sizes (185/ 240/ 300/630 sqmm)

1

265

265

... More
1.1 KV LT XPLE cable (95/ 120/185/240 / 300 sqmm) 3.5 core

1

266

266

... More
11 KV XLPE cable 3 core of sizes (120/ 185/ 240/300/ 400 sqmm)

1

265

265

... More
1 Phase Exhaust/ cooling fan for Power Transformer including electric connections.

1

2500

2500

... More
Industrial type 3 phase heavy duty cooling fan for Power Transformer including 3 phase electric connections.

1

5000

5000

... More
Earthing

-

-

-

... More
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm through GI strip including material complete as per standard

1

8999

8999

... More
Copper plate earthing 600 * 600 * 3 mm thick including accessories and providing massionary enclosure with cover plate having locking arrangement and GI pipe 2.7 metre long including excavation of pit and filling it with alternate layer of Salt/ Charcoal as reqd and as per standard with material complete.

1

9000

9000

... More
GI pipe/ spiral earthing as per standard along with material complete

1

4000

4000

... More
Provision of Chemical Earthing with material complete as per standard.

1

2000

2000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.