Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Electrical Cables And Wires
Electrical and Electronics
Eprocure
Opening Date24 Sep 2022
Closing Date11 Nov 2022
Tender Amount₹ 69,71,000
Costs
EMD
₹ 1,39,500Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PDD_189824_1Bid Award Id
ViewTender No
EDI No 054 of 2022-23Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and Fixing of GI Nut and Bolts with washers
70
-
-
Supply and Fixing of Cable tie (Each packet contains 100 Nos)
7
-
-
Supply and Fixing of Cable end Caps
260
-
-
Supply, Laying, Testing and Commissioning of 4 core 35 mm2 PVC Cable from AB Cable taping point through Piericing connector to PMDB including P/F of Thimbles/Clamps (Havells/Polycab/Anchor or equivalent)
1750
-
-
Supply of Piercing Connector for street light connections (main line 70-120 Sqm/branch line section 4-25 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
94
-
-
Fixing of Piercing Connector for street light connections (main line 70-120 Sqm/branch line section 4-25 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
94
-
-
Supply of Piercing Connector for DB connection from main ABC to DB (main line 70-120 Sqm/branch line section 35-50 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
41
-
-
Fixing of Piercing Connector for DB connection from main ABC to DB (main line 70-120 Sqm/branch line section 35-50 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
41
-
-
Supply of Piercing connector for ABC to ABC Tee connection (main line 70-120 Sqm/branch line section 70-120 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
54
-
-
Fixing of Piercing connector for ABC to ABC Tee connection (main line 70-120 Sqm/branch line section 70-120 Sqm) insulated and insulated branching and bare and insulated branching in case of neutral messenger
54
-
-
Supply of 3 Phase SMDB (Service Main Distribution Box) IP54 made from 20 SWG CRCA MS sheetby Deep drawn method with connection terminals for R,Y, B & N as per specifications. Internal size of the box shall be 225mm x 285mm x 120mm used for connection through ABC line and for giving connections to the consumers 3phase-1 incoming 4 outgoing I/C- 1, O/G-2-4 (200 A, 0.415 kV) for RYB Phase. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws and Back Clamp suitable for 11/9/8 Mtr ST Pole or 9/8 mtr PCC poles with Nuts/bolts. The job also includes disconnection/reconnection of consumer energy meter and aluminium lugs, if required.
90
-
-
Installation, Testing and Commissioning of 3 Phase SMDB (Service Main Distribution Box) IP54 made from 20 SWG CRCA MS sheetby Deep drawn method with connection terminals for R,Y, B & N as per specifications. Internal size of the box shall be 225mm x 285mm x 120mm used for connection through ABC line and for giving connections to the consumers 3phase-1 incoming 4 outgoing I/C- 1, O/G-2-4 (200 A, 0.415 kV) for RYB Phase. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws and Back Clamp suitable for 11/9/8 Mtr ST Pole or 9/8 mtr PCC poles with Nuts/bolts. The job also includes disconnection/reconnection of consumer energy meter and aluminium lugs, if required.
90
-
-
Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm
44
-
-
Supply of Pre insulated straight through joints suitable for 1 (3X120+1x16 (street light) +1X70 (insulated messenger) Cable
68
-
-
Fixing of Pre insulated straight through joints suitable for 1(3X120+1x16 (street light) + 1X70 (insulated messenger) Cable
68
-
-
Providing and Fixing of Insulation tape (red / yellow / black)
120
-
-
Providing and Fixing of Misc Items such binding wire, screws, Thimbles of sizes, Clamps of sizes etc.
158
-
-
Providing and Painting of ST Poles 8 mtr long with 1 coat od red oxide and 2 coats of aluminium paint
44
-
-
Providing and Cement Bottoming 1:2:4 mix as per REC standards 0.45cum/pole
44
-
-
Providing and Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (300x 300 x 8 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
104
-
-
Supply, Installation, Testing and Commissioning of LT Distribution Box for 250 kVA DTR with MCCB for Outgoing Circuits, Distribution Boxes made out of CRCA MS for controlling the L.T. feeders from the L.T. side of Distribution Transformers IS: 8623 (amended upto date) for enclosure Box & for degree of protection provided by enclosures of electrical equipments. The Aluminum Busbar for Phase & Neutral should be of size 25x8 mm and with Heat Shrinkable bus bar insulation tubing of Red Yellow-Blue & Black mounted on epoxy resin cast bus insulators fixed on suitable fixing arrangement with adequate clearance. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A and Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A
6
-
-
Supply, Installation, Testing and Commissioning of LT Distribution Box for 100 kVA DTR with MCCB for Outgoing Circuits, Distribution Boxes made out of CRCA MS for controlling the L.T. feeders from the L.T. side of Distribution Transformers IS: 8623 (amended upto date) for enclosure Box & for degree of protection provided by enclosures of electrical equipments. The Aluminum Busbar for Phase & Neutral should be of size 25x8 mm and with Heat Shrinkable bus bar insulation tubing of Red Yellow-Blue & Black mounted on epoxy resin cast bus insulators fixed on suitable fixing arrangement with adequate clearance. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A and Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A
2
-
-
Supply, Installation, Testing and Commissioning of LT Distribution Box for 400 kVA DTR with MCCB for Outgoing Circuits, Distribution Boxes made out of CRCA MS for controlling the L.T. feeders from the L.T. side of Distribution Transformers IS: 8623 (amended upto date) for enclosure Box & for degree of protection provided by enclosures of electrical equipments. The Aluminum Busbar for Phase & Neutral should be of size 25x8 mm and with Heat Shrinkable bus bar insulation tubing of Red Yellow-Blue & Black mounted on epoxy resin cast bus insulators fixed on suitable fixing arrangement with adequate clearance. The DB should have Bottom entry of Cable with proper Glands/grommets-Safety Screws Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A and Outgoing 02 no. MCCB - 200 A
O/G Link Disconnector 06 no. - 200 A
2
-
-
Supply, Fabrication and Fixing of GI Channel / Angle / Flat of sizes including clamps, GI Nut and Bolts with washers
1570
-
-
Supply, Laying, Testing and Commissioning of 70 mm² XLPE LT Cable Single Core, un-armoured, FRLS from Transformer LT DB neutral to Messenger Wire including PG Clamp (Havells/Polycab/Anchor or equivalent)
170
-
-
Supply, Laying, Testing and Commissioning of 16 mm² Cable (2C) from LT DB box to meter ,1.1k V Grade, Armoured, PVC Insulated Stranded Conductor FRLS type including thimbles/Clamps/Lugs (Havells/Polycab/Anchor or equivalent)
1850
-
-
Supply, Laying, Testing and Commissioning of 400 sqmm XLPE LT single Core unarmoured Cable from transformer to LT BD (alongwith Required Aluminium Thimbles P/F included) (Havells/Polycab/Anchor or equivalent)
470
-
-
Installation, testing and commissioning of 120 mm² AB Cable (3X120+1x16 (street light) +1X70 (messenger)) XLPE (1.1kV, 3+1 C, Al) including loading from Divisional Stores at Bemina, its carriage and unloading upto site (Cable to be Provided by the Corporation)
10
-
-
Striaghtening of existing tilted Poles by way of opening the pits of 9/8 Mtr concerned poles
98
-
-
Dismantling of existing ACSR Conductor and LT Shackle Insulators along with U Clamps including Transportation its carriage / Loading / unloading from site to Divisional Stores.
8.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements