Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Electrical and Electronics
Eprocure
Opening Date10 Jan 2024
Closing Date31 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,52,700Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Survey, Supply, Transportation, Carriage, Erection, Testing And Commissioning Forimprovement Of Infrastructure At Govt. Degree College Boys Udhampur Under The Jurisdiction Of Electric Division Jpdcl Udhampur On Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDD_242535_1Bid Award Id
ViewTender No
ED/Udh/134 of 2023-24 dt. 09-01-2024Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
GI Channel X-arm including clamps and Angle for braces
1100
-
-
50mm² ACSR Rabbit conductor
6.5
-
-
PG Clamps
12
-
-
11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm.
70
-
-
11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KV Positive and 80 KV Negative, creepage distance 320mm with fitting
60
-
-
Galvanized Nuts and Bolts
24
-
-
Danger Plates with Clamps
10
-
-
Anti climbing device with clamps
10
-
-
Earthing complete by GI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm
24
-
-
Painting of 11 mtr ST poles with two coats of Aluminium paint.
24
-
-
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
12
-
-
11 KV Isolator 630 Amp Double Break 3-Ø
2
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
10
-
-
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for installation of 250 KVA sub stn. at Govt. Degree College Boys Udhampur.
-
-
-
11/0.433 KV, 3-phase distribution Transformer 250 KVA with Bimetallic Terminal Connectors Energy Level-2 Copper Wound, & with LV Cable box having detachable Aluminium Gland plate
1
-
-
Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type
1
-
-
11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical
1
-
-
11 KV Horn gap fuse set 3 phase 200 A
1
-
-
300mm² 1.1 KV Grade, PVC insulated stranded conductor FRLS Type
88
-
-
9 mtr. Long ST pole (ST-410 SP33)
2
-
-
11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75 Positive and 80 KV Negative, creepage distance 320mm with fitting
3
-
-
GI Channel /Angle/flat of sizes including clamps
300
-
-
Galvanized Nuts and Bolts.
15
-
-
Earthing of sub stn. Excavation of earth pit of dia 650mm & depth 3000mm installation of earthing pipe of 40mm Nominal bore & 4mm wall thickness & length 2.5 mtr. Long as per IS 1239. G.I Strip for neutral earthing of size 25mmx3mm for connection of transforemr body, GO Set & lightening arrestor as per IS 2629/85, GI Nuts & bolts refilled with earth enhancement materials and earth chamber with RCC Slab cover
5
-
-
11 KV Polymer composite pin insualtor, 12 KV, 5KN Lightening impulse 75 KV Positve and 80 KV Negative, creepage distance 320mm
3
-
-
LT Distribution box for 250 KVA DTR with MCCB for incormer and SFU's for outgoing circuits.
2
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
PG Clamps
6
-
-
Danger Plates with Clamps
1
-
-
GI Barbed wire for Anticlimbing
15
-
-
3-phase HT Trivector meter with CT PT Unit including meter box
1
-
-
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
1
-
-
Painting of ST poles 9 mtr. long with 2 coat of Al. paint
2
-
-
Survey, supply, Transportation, Carriage, Erection, Testing and Commissioning for Erection of LT network alongwith provision of LED Lights at Govt. Degree College Boys Udhampur.
-
-
-
8 mtr. Long ST poles (ST-410 SP15)
40
-
-
LED Street Light 100 Watt alongwith included existing network connected items with Light like bracket with clamp 2.5mm² Copper cable, IPC etc.
80
-
-
50mm² AB Cable (3x50+1x16+1x35)
1.5
-
-
120mm² AB Cable (3x120+1x16+1x70)
2
-
-
100 Amp MCB with outdoor box
2
-
-
40 Amp MCB with outdoor box
10
-
-
Painting of 8 mtr ST poles with two coat of Aluminium Paint
40
-
-
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
20
-
-
Earthing complete by GI Rod 20mm 2.5 mtr. Long through GI Strip
40
-
-
Distribution box with 4 MCB 32 Amp
30
-
-
35mm² Single Core PVC Cable
250
-
-
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Augmentation of distribution sub station from 100 KVA to 250 KVA at Govt. Degree College Boys Udhampur.
-
-
-
9 mtr. Long ST poles (ST-410 SP33)
2
-
-
11/0.433 KV, 3-phase 250 KVA distribution Transformer with Bimetallic Terminal Connectors Energy Level-2 Copper Wound & with LV Cable box having detachable Aluminium Gland plate
1
-
-
300mm² single phase cable 1.1 KV Grade, PVC insulated stranded conductor FRLS Type
88
-
-
G.I Channel/Angle/Flat of sizes including clamps
300
-
-
LT Distribution box for 250 KVA DTR with MCCB for incomer & switch Fuse units for outgoing circuits.
2
-
-
11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm.
3
-
-
11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KV Positive and 80 KV Negative, creepage distance 320mm with fitting
3
-
-
Painting of 9 mtr ST poles with two coats of Aluminium paint.
2
-
-
Galvanized Nuts and Bolts
15
-
-
Earthing of sub stn. Excavation of earth pit of dia 650mm & depth 3000mm installation of earthing pipe of 40mm Nominal bore & 4mm wall thickness & length 2.5 mtr. Long as per IS 1239. G.I Strip for neutral earthing of size 25mmx3mm for connection of transformer body, GO Set & lightening arrestor as per IS 2629/85, GI Nuts & bolts refilled with earth enhancement materials and earth chamber with RCC Slab cover
5
-
-
11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical
1
-
-
11 KV Horn gap fuse set 3 phase 200 A
1
-
-
Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type
1
-
-
Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole
1
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
3 Phase trivector meter with HT/PT unit including meter box
1
-
-
Dismantling of old weasel conductor & Write back to Divisional Store of ED Udhampur
5.5
-
-
Dismantling of Rails 8/9 mtr. & Write back to Divisional Store of ED Udhampur
2
-
-
Dismantling of C.I Cross arm & Write back to Divisional Store of ED Udhampur
150
-
-
Dismantling of 100 KV Old transformer with allied material channel iron, G.O, DO, etc & Write back to Divisional Store of ED Udhampur
1
-
-
Dismantling & reerection of ST/PCC poles 8 mtr/ 9mtr long
7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements