Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Works
Civil And Construction
Energy, Oil and Gas
Eprocure
Opening Date10 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 2,90,00,000 
Notes
Download

Costs

Summary

Laying Of Tower Foundations Including Pile Foundation And Pile Caps For 220kv Dc Wagoora-budgam-zainakote Transmission Line

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying, filling,spreading and leveling stone boulders of size range 5cm to 20 cm, in pits in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge.(200mm thk)

56

-

-

... More
Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations …. Depth Exceeding 1.5M but not exceeding 3M

1032

-

-

... More
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and Mechanical) Thermo-MechanicallyT reated bars of grade Fe-500D or more.

14000

-

-

... More
Supply Of Galvanized Stubs and Cleats (as per Drawing)

2145

-

-

... More
Foundation Bolts for Gantry 16No./Col…40mm

130

-

-

... More
Stub Setting including Transportation, Carriage of Stubs & Templates.

4

-

-

... More
Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with: 1:3:6 (1Cement:3Coarse Sand:6 graded Stone Aggregate 40mm Nominal Size)

24

-

-

... More
Providing and laying in position specified grade of reinforced Cement Concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the Cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level (M25) including all carriages and dewatering

180

-

-

... More
Centering and Shuttering including strutting, propping etc.and removal of form work for: Foundations Footings, Bases for Columns

270

-

-

... More
Providing and fixing of earthing including earth resistivity including Counterpoise whereever required.

6

-

-

... More
Pile Foundation With Cap Loc. No. 90X Pile Caps-2No. (91MC & 92MC)

-

-

-

... More
Survey (Check Survey and Pit Marking), Tower Spotting & Pit Marking

3

-

-

... More
Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation

201.6

-

-

... More
Supplying, filling,spreading and leveling stone boulders of size range 5cm to 20 cm, in pits in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge.(200mm thk)(Carriage in boat included )

32.85

-

-

... More
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical)…..Thermo-MechanicallyT reated bars of grade Fe-500D or more.

51500

-

-

... More
Supply Of Galvanized Stubs and Cleats (as per Drawing)

2100

-

-

... More
Stub Setting including Transportation, Carriage of Stubs & Templates.

3

-

-

... More
Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with: 1:3:6 (1Cement:3Coarse Sand:6 graded Stone Aggregate 40mm Nominal Size)(Dewatering and Carriage in boat included )

12.33

-

-

... More
Providing and laying in position specified grade of reinforced Cement Concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the Cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level (M20) including all carriages and dewatering

236.8

-

-

... More
Centering and Shuttering including strutting, propping etc.and removal of form work for: Foundations Footings, Bases for Columns

226

-

-

... More
Providing and fixing of earthing including earth resistivity including Counterpoise whereever required.

3

-

-

... More
Providing and Filling empty Cement Bags with supply of river sand sand,including cost of empty cement bags, & stiching of bags including all types of carriages upto site for construction of plate form and approach path

13145

-

-

... More
Supply of river sand for const. of plate form and approach path

372

-

-

... More
Demolishing R C C Work Manually Or Hydraulic Means including stacking of Steel Bars and disposal of unservicable material within 50Meter Lead.

22

-

-

... More
Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of specified grade concrete mix, diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embeded in the pile cap etc. all complete. (Length of each pile is 28.5 mtr and Dia of 0.75 Mtr) ( Cost of all materials for construction of Piles and approach path included also including carriage by boat

16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.