Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Civil And Construction
Energy, Oil and Gas
Eprocure
Opening Date10 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 2,90,00,000
Costs
EMD
₹ 5,80,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Laying Of Tower Foundations Including Pile Foundation And Pile Caps For 220kv Dc Wagoora-budgam-zainakote Transmission Line
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDD_258974_1Bid Award Id
ViewTender No
TLMD-VIII /TS/ 11 of 2024 Dated 09-10-2024Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supplying, filling,spreading and leveling stone boulders of size range 5cm to 20 cm, in pits in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge.(200mm thk)
56
-
-
Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations …. Depth Exceeding 1.5M but not exceeding 3M
1032
-
-
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and Mechanical) Thermo-MechanicallyT reated bars of grade Fe-500D or more.
14000
-
-
Supply Of Galvanized Stubs and Cleats (as per Drawing)
2145
-
-
Foundation Bolts for Gantry 16No./Col…40mm
130
-
-
Stub Setting including Transportation, Carriage of Stubs & Templates.
4
-
-
Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with: 1:3:6 (1Cement:3Coarse Sand:6 graded Stone Aggregate 40mm Nominal Size)
24
-
-
Providing and laying in position specified grade of reinforced Cement Concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the Cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level (M25) including all carriages and dewatering
180
-
-
Centering and Shuttering including strutting, propping etc.and removal of form work for: Foundations Footings, Bases for Columns
270
-
-
Providing and fixing of earthing including earth resistivity including Counterpoise whereever required.
6
-
-
Pile Foundation With Cap Loc. No. 90X
Pile Caps-2No. (91MC & 92MC)
-
-
-
Survey (Check Survey and Pit Marking), Tower Spotting & Pit Marking
3
-
-
Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation
201.6
-
-
Supplying, filling,spreading and leveling stone boulders of size range 5cm to 20 cm, in pits in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge.(200mm thk)(Carriage in boat included )
32.85
-
-
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical)…..Thermo-MechanicallyT reated bars of grade Fe-500D or more.
51500
-
-
Supply Of Galvanized Stubs and Cleats (as per Drawing)
2100
-
-
Stub Setting including Transportation, Carriage of Stubs & Templates.
3
-
-
Providing and laying in position cement concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with: 1:3:6 (1Cement:3Coarse Sand:6 graded Stone Aggregate 40mm Nominal Size)(Dewatering and Carriage in boat included )
12.33
-
-
Providing and laying in position specified grade of reinforced Cement Concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the Cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level (M20) including all carriages and dewatering
236.8
-
-
Centering and Shuttering including strutting, propping etc.and removal of form work for: Foundations Footings, Bases for Columns
226
-
-
Providing and fixing of earthing including earth resistivity including Counterpoise whereever required.
3
-
-
Providing and Filling empty Cement Bags with supply of river sand sand,including cost of empty cement bags, & stiching of bags including all types of carriages upto site for construction of plate form and approach path
13145
-
-
Supply of river sand for const. of plate form and approach path
372
-
-
Demolishing R C C Work Manually Or Hydraulic Means including stacking of Steel Bars and disposal of unservicable material within 50Meter Lead.
22
-
-
Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of specified grade concrete mix, diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embeded in the pile cap etc. all complete. (Length of each pile is 28.5 mtr and Dia of 0.75 Mtr) ( Cost of all materials for construction of Piles and approach path included also including carriage by boat
16
-
-