Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Electrical and Electronics
Eprocure
Opening Date6 Jun 2024
Closing Date27 Jun 2024
Tender AmountRefer Documents
Costs
EMD
₹ 25,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Fixing Of Rate Contract For Handling Of Various Material In Divisional Store
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDD_249298_1Bid Award Id
ViewTender No
EDV/ 03 of 2024-2025 Dated 06-06-2024Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Unloading of ST Poles 13 Mtr Long
1
-
-
Unloading of ST Poles 11Mtr Long
1
-
-
Unloading of ST Poles 9 Mtr Long
1
-
-
Unloading of ST Poles 8 Mtr Long
1
-
-
Loading of PCC Poles 11 Mtr Long
1
-
-
Loading of PCC Poles 9 Mtr Long
1
-
-
Loading of PCC Poles 8 Mtr Long
1
-
-
Loading of ST Poles 13 Mtr Long
1
-
-
Loading of ST Poles 11Mtr Long
1
-
-
Loading of ST Poles 9 Mtr Long
1
-
-
Loading of ST Poles 8 Mtr Long
1
-
-
Dragging of ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking
1
-
-
Dragging of PCC Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking
1
-
-
Unloading of /New ACSR Conductor
1
-
-
Loading of Old/New ACSR Conductor
1
-
-
Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking
1
-
-
Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking
1
-
-
Unloading of 25 KVA Transformer(New/Write BackTransformer)
1
-
-
Unloading of 63 KVA Transformer(New/Write BackTransformer)
1
-
-
Unloading of 100 KVA Transformer(New/Write BackTransformer)
1
-
-
Unloading of 250 KVA Transformer(New/Write BackTransformer)
1
-
-
Unloading of 400 KVA Transformer(New/Write BackTransformer)
1
-
-
Unloading of 630 KVA Transformer(New/Write BackTransformer)
1
-
-
Loading of 25 KVA Transformer
1
-
-
Loading of 63 KVA Transformer
1
-
-
Loading of 100 KVA Transformer
1
-
-
Loading of 250 KVA Transformer
1
-
-
Loading of 400 KVA Transformer
1
-
-
Loading of 630 KVA Transformer
1
-
-
Dragging/Shifting of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
Dragging/Shifting of existing /New /Damaged 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
Dragging/Shifting of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
1
-
-
Dragging/Shifting of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly
1
-
-
Dragging/Shifting of existing /New /Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
Dragging/Shifting of existing /New /Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
Unloading of Channel/Angle/Flat Iron
1
-
-
Loading of Channel/Angle/Flat Iron
1
-
-
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly
1
-
-
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking
1
-
-
Unloading of Link/Knife/HG/DO/LA Set
1
-
-
Loading of Link/Knife/HG/DO/LA/GO Set
1
-
-
Unloading of CT/PT Unit
1
-
-
Loading of CT/PT Unit
1
-
-
Unloading of DPC Cu/Al. Wire
1
-
-
Unloading of Bush Rods and other allied workshop material
1
-
-
Unloading of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)
1
-
-
Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc)
1
-
-
Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly
1
-
-
Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material
1
-
-
Unloading/Loading of Bamboo Ladder
1
-
-
Unloading/Loading of Single/Three Phase Meters
1
-
-
Unloading of PVC Cable single core 95/120/185mmsq
1
-
-
Unloading of PVC Cable single core 300/400/630mmsq
1
-
-
Loading of PVC Cable single core 95/120/185mmsq
1
-
-
Loading of PVC Cable single core 300/400/630mmsq
1
-
-
Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
1
-
-
Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
1
-
-
Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines
1
-
-
Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines
1
-
-
Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
1
-
-
Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly
1
-
-
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
1
-
-
Loading of Aluminium and Copper wire
1
-
-
Loading of Bush Rods and other allied Workshop material
1
-
-
Unloading/Loading of Single phase/three phase meters
1
-
-
Stacking of Single/Three phase meters
1
-
-
Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes
1
-
-
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6
1
-
-
Fabrication of fi ties ,fi clamps from MS flat (suitable for 9mtr,11 mtr and 13 mtr poles)
1
-
-
Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards
1
-
-
Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards
1
-
-
Fabrication of ST poles by way of drilling of extra holes
1
-
-
Fabrication of foundation bolts from MS tor steel including threading as per REC Standards
1
-
-
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
1
-
-
Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines
1
-
-
Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc
1
-
-
Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc
1
-
-
Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc
1
-
-
Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.
1
-
-
Unloading of Cement Bags
1
-
-
Carriage of Cement Bags from unloading site to stacking site
(Upto 50 Mtr)
1
-
-
Stacking of Cement bags
1
-
-
Loading of Cement Bags
1
-
-
Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents
1
-
-
Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store
1
-
-
Straightening of tilted fencing posts in the store premises for repair of fecning
1
-
-
Insertion of new fencing Posts in the store for repair of fencing
1
-
-
Dismantling of existing mesh fencing
1
-
-
Fixing of mesh Fencing
1
-
-
Fixiing of CGI Sheets
1
-
-
Dismantling of CGI sheets
1
-
-
Erection of PCC Fencing Posts /Angle Iron posts including Cement Bottoming
1
-
-
Fixing of barbed wire
1
-
-
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA
1
-
-
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA
1
-
-
Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
1
-
-
Painting(Red oxide/Aluminium Paint) of Fabricated Material.
1
-
-
Unloading of old loose conductor and making bundles
1
-
-
Checking & maggering of 11KV, LA set , HG set , GO set & CT/PT unit
1
-
-
Loading of Transformer Oil
1
-
-
Unloading of Transformer Oil
1
-
-
Dragging of Transformer Oil Barrel from unloading site to Stacking site average distance upto 50 mtr.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements