Power Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Services
Electrical and Electronics
Eprocure
Opening Date6 Jun 2024
Closing Date27 Jun 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Fixing Of Rate Contract For Handling Of Various Material In Divisional Store

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Unloading of ST Poles 13 Mtr Long

1

-

-

... More
Unloading of ST Poles 11Mtr Long

1

-

-

... More
Unloading of ST Poles 9 Mtr Long

1

-

-

... More
Unloading of ST Poles 8 Mtr Long

1

-

-

... More
Loading of PCC Poles 11 Mtr Long

1

-

-

... More
Loading of PCC Poles 9 Mtr Long

1

-

-

... More
Loading of PCC Poles 8 Mtr Long

1

-

-

... More
Loading of ST Poles 13 Mtr Long

1

-

-

... More
Loading of ST Poles 11Mtr Long

1

-

-

... More
Loading of ST Poles 9 Mtr Long

1

-

-

... More
Loading of ST Poles 8 Mtr Long

1

-

-

... More
Dragging of ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking

1

-

-

... More
Dragging of PCC Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking

1

-

-

... More
Unloading of /New ACSR Conductor

1

-

-

... More
Loading of Old/New ACSR Conductor

1

-

-

... More
Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking

1

-

-

... More
Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking

1

-

-

... More
Unloading of 25 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Unloading of 63 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Unloading of 100 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Unloading of 250 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Unloading of 400 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Unloading of 630 KVA Transformer(New/Write BackTransformer)

1

-

-

... More
Loading of 25 KVA Transformer

1

-

-

... More
Loading of 63 KVA Transformer

1

-

-

... More
Loading of 100 KVA Transformer

1

-

-

... More
Loading of 250 KVA Transformer

1

-

-

... More
Loading of 400 KVA Transformer

1

-

-

... More
Loading of 630 KVA Transformer

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly

1

-

-

... More
Dragging/Shifting of existing /New /Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly

1

-

-

... More
Unloading of Channel/Angle/Flat Iron

1

-

-

... More
Loading of Channel/Angle/Flat Iron

1

-

-

... More
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly

1

-

-

... More
Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking

1

-

-

... More
Unloading of Link/Knife/HG/DO/LA Set

1

-

-

... More
Loading of Link/Knife/HG/DO/LA/GO Set

1

-

-

... More
Unloading of CT/PT Unit

1

-

-

... More
Loading of CT/PT Unit

1

-

-

... More
Unloading of DPC Cu/Al. Wire

1

-

-

... More
Unloading of Bush Rods and other allied workshop material

1

-

-

... More
Unloading of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)

1

-

-

... More
Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc)

1

-

-

... More
Shifting of allied material for HT/LT Line/Substations/workshop material (i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly

1

-

-

... More
Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material

1

-

-

... More
Unloading/Loading of Bamboo Ladder

1

-

-

... More
Unloading/Loading of Single/Three Phase Meters

1

-

-

... More
Unloading of PVC Cable single core 95/120/185mmsq

1

-

-

... More
Unloading of PVC Cable single core 300/400/630mmsq

1

-

-

... More
Loading of PVC Cable single core 95/120/185mmsq

1

-

-

... More
Loading of PVC Cable single core 300/400/630mmsq

1

-

-

... More
Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines

1

-

-

... More
Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines

1

-

-

... More
Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines

1

-

-

... More
Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines

1

-

-

... More
Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly

1

-

-

... More
Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly

1

-

-

... More
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6

1

-

-

... More
Loading of Aluminium and Copper wire

1

-

-

... More
Loading of Bush Rods and other allied Workshop material

1

-

-

... More
Unloading/Loading of Single phase/three phase meters

1

-

-

... More
Stacking of Single/Three phase meters

1

-

-

... More
Fabrication of Angle iron braces /Belts/Guard Netting angles ,fencing posts etc from angle iron of sizes

1

-

-

... More
Fabrication of Channel Cross Arms of sorts from MS Channel 100x50x6

1

-

-

... More
Fabrication of fi ties ,fi clamps from MS flat (suitable for 9mtr,11 mtr and 13 mtr poles)

1

-

-

... More
Fabrication of Earthing Plates , Cable duct cover from MS plate as per REC Standards

1

-

-

... More
Fabrication of earthing spikes from MS tor steel of sorts as per REC Standards

1

-

-

... More
Fabrication of ST poles by way of drilling of extra holes

1

-

-

... More
Fabrication of foundation bolts from MS tor steel including threading as per REC Standards

1

-

-

... More
Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards

1

-

-

... More
Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines

1

-

-

... More
Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc

1

-

-

... More
Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc

1

-

-

... More
Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc

1

-

-

... More
Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.

1

-

-

... More
Unloading of Cement Bags

1

-

-

... More
Carriage of Cement Bags from unloading site to stacking site (Upto 50 Mtr)

1

-

-

... More
Stacking of Cement bags

1

-

-

... More
Loading of Cement Bags

1

-

-

... More
Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents

1

-

-

... More
Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store

1

-

-

... More
Straightening of tilted fencing posts in the store premises for repair of fecning

1

-

-

... More
Insertion of new fencing Posts in the store for repair of fencing

1

-

-

... More
Dismantling of existing mesh fencing

1

-

-

... More
Fixing of mesh Fencing

1

-

-

... More
Fixiing of CGI Sheets

1

-

-

... More
Dismantling of CGI sheets

1

-

-

... More
Erection of PCC Fencing Posts /Angle Iron posts including Cement Bottoming

1

-

-

... More
Fixing of barbed wire

1

-

-

... More
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA

1

-

-

... More
Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA

1

-

-

... More
Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking

1

-

-

... More
Painting(Red oxide/Aluminium Paint) of Fabricated Material.

1

-

-

... More
Unloading of old loose conductor and making bundles

1

-

-

... More
Checking & maggering of 11KV, LA set , HG set , GO set & CT/PT unit

1

-

-

... More
Loading of Transformer Oil

1

-

-

... More
Unloading of Transformer Oil

1

-

-

... More
Dragging of Transformer Oil Barrel from unloading site to Stacking site average distance upto 50 mtr.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.