Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date21 Nov 2022
Closing Date12 Dec 2022
Tender Amount₹ 40,50,000 
Notes
Download

Costs

Summary

Upgradation/stabilization Of Existing Ehv Civil Infrastructure Of 132kv D/c Pampore- Cheshmashahi -habbak Transmission Line

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All works up to plinth level. 1:4:8(1 cement :4coarse sand:8 graded stone aggragate,40mm nominal size crushed

5.15

-

4419.85

... More
Random Rubble masonry with hard stone from quarry in foundation and plinth including leveling up with cementconcrete1:6:12 ( 1cement:6 coarse sand: 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:8 ,1 cement : 8 coarse sand ) excluding the cost of stones.

229.65

-

5722.8

... More
Reinforced cement concrete work in walls ( any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillar, piers, abutments, posts, and struts etc. up to floor V level excluding the cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 ( 1cement: 1.5coarse sand: 3graded stone aggregate: 20mm nominal size crushed) RCC Bands

8.61

-

8552.85

... More
Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete.

600

-

79.25

... More
Providing & laying of 50mm thick cement conc. Coping 1:2:4. Over whole retaining wall.

270

-

372.85

... More
Earth filling / stone filling /ash filling / quarry muck filling materials available at work at the back of protection wall for stabilization of open chimney/structure.

49.39

-

198.7

... More
Carriage of materials from source to neatest unloading site of work by mechanical transport at an average lead of 20km(Cement)

9.2

-

310.99

... More
Carriage of materials from source to nearest unloading site of work by mechanical transport at an average lead of 20km(Steel)

0.6

-

310.99

... More
Carriage of materials from source to nearest unloading site of work by mechanical transport at an average lead of 20km (Crush stone aggregate (20mm nominal size ) for an average lead of 20 km.)

14.71

-

349.82

... More
Carriage of materials from source to neatest unloading site of work by mechanical transport at an average lead of 20km(Coarse sand for an average lead of 20km.

31.47

-

349.82

... More
Carriage of materials from dumping site to site of work by manual labour for Av.5km(Cement)

9.2

-

1641.2

... More
Carriage of materials from dumping site to site of work by manual labour for Av.5km(Steel)

0.6

-

3525.72

... More
Carriage of materials from dumping site to site of work by manual labour for Av.5km (Crush stone aggregate (20mm nominal size ) for an average lead of 20 km.)

14.71

-

4116.78

... More
Carriage of materials from dumping site to site of work by manual labour for Av.5km(Coarse sand for an average lead of 20km).

31.47

-

4116.78

... More
Carriage of materials from dumping site to site of work by manual labour for Av.5km(Stone )

137.79

-

1102.98

... More
Collection of materials by manual labour at the site of work with average lead of 500metres Earth /ash/quarry muck etc

49.39

-

540.18

... More
Misc./sundries etc .

2

-

10000

... More
Insertion of one no. A type towers on of Double Circuit of 132KV Habak-Cheshmashahi Tr.line between tower No 51 and 52.

-

-

-

... More
Surveying, pit marking of foundations.

1

-

40000

... More
Foundations & Stub Settings of 132 KV Double Circuit Habak-Cheshmashahi Tr. Line (for one tower)

-

-

-

... More
Excavation of foundation pits

142

-

595

... More
Disposal of excavated soil within 25mtrs

142

-

210

... More
Bending, fixing and binding of reinforce.

0.94

-

1100

... More
Concreting of tower foundation.

20.6

-

1449

... More
Stub setting of tower foundations

1

-

15000

... More
Form work of steel shuttering.

38

-

180

... More
Coping & curring of tower foundations

1

-

3000

... More
Back filling

116.24

-

99

... More
Manual carriage of constructional material at an average of 1.0 Km

-

-

-

... More
Sand (0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains

9.27

-

1233.75

... More
Bajree(0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains

18.54

-

1233.75

... More
Solling

5.16

-

1233.75

... More
Back carriage of earth .

116.24

-

210

... More
Good earth

23.25

-

1233.75

... More
Water for curring @ 1.22 Kl of conc. volume + 1.5% for back filling +20% wastage (average lead 1 km)

30.61

-

440.63

... More
Cement (average lead 1.0km)

132

-

34.56

... More
Form boxes

1

-

3120

... More
T&P accessories

1

-

2150

... More
Steel for reinforcement

0.94

-

3985.17

... More
Supply of constructional material,

-

-

-

... More
Cement

132

-

390

... More
Reinfrocement steel

0.94

-

66750

... More
Sand

9.27

-

850

... More
Bajree

18.54

-

900

... More
Good earth

23.25

-

200

... More
Solling

5.16

-

400

... More
Mechnical carriage for an average 20km lead.

-

-

-

... More
Sand

9.27

-

265.13

... More
Bajree

18.54

-

265.13

... More
Good earth

23.25

-

304.85

... More
Solling

5.16

-

286.91

... More
Lowering of conductor from 49 to 52 for insertion of one no.A type towers between51 & 52 on Double Circuit of 132KV Habak-Cheshmashahi Tr.line . (average for insertion of one tower)

-

-

-

... More
Lowering of conductor from the towers50%14720=

4.5

-

9987.52

... More
Realing /making of bundles of dismantlled/damaged conductor

4.5

-

30288.24

... More
loading and unloading of dismantalled conductor

4

-

3860.67

... More
Carriage of ropes, pulleys etc used for lowering/dismantalling the conductor

4

-

2391.71

... More
watch and ward of material

4

-

4885.2

... More
Erection of one no. A type tower for insertion on Double Circuit of 132KV Habak-Cheshmashahi Tr.line . (for one insertion)

-

-

-

... More
Loading , unloading and staking of tower material

4.14

-

1899.8

... More
Erection of Super structure

4.14

-

15100.02

... More
Mechanical carriage of tower material from Divn. Store to work site avg. 20 kms

4.14

-

294.21

... More
Carriage of material from road side to erection site

4.14

-

5407.87

... More
Loading and unloading of T&P Items including to &fro carriage

1

-

2533.52

... More
Watch and Ward of material during Erection

1

-

24426

... More
Welding of tower bolts first two stories

1

-

8142

... More
To and fro carriage of welding equipment

1

-

814.2

... More
Stringing of 0.2 ACSR conductor for insertion of A type tower on Double Circuit of 132KV Habak-Cheshmashahi Tr.line ( for one insertion )

-

-

-

... More
Loading/unloading of Panther conductor

1

-

3860.67

... More
Carriage of ropes ,pulleys derrickpoles etc.through 1.0 km avg.lead.

4

-

2391.71

... More
Anchoring of towers including dismantling arrangments.

2

-

8413.4

... More
Loading of insulators & other fittings. .

2

-

407.1

... More
Unloading of insulators & other fitting from Mech. Transport and carriage upto 50 mtrs..

1

-

305.33

... More
Carriage of Insulators & other fittings beyond 50mtrs. Upto 1.0 Km.

1

-

2391.03

... More
Loading of stringing equipment like compressor, turn table ,four sheeve pulleys,rollers etc .

1

-

2533.52

... More
Unloading and stacking of material .

1

-

1899.8

... More
Carriage of material from road site to working site.

1

-

1395.17

... More
Laying of conductor to string 1 km+10% extra .upto

-

-

-

... More
First phase string

0.75

-

30288.24

... More
For subsequent string 5 for D/C

3.75

-

27259.42

... More
Stringing of panther condcutor 1 Km + 1.5% for sag for 6 phase including errection of insulator strings/fittings

4.5

-

19975.04

... More
Extra for laying / stringing of conductor through nallah P&T lines, LT/HT lines

4.5

-

7946.59

... More
Erection of jumpers at tension towers.

2

-

3256.8

... More
Making of compression joints

3

-

1560.55

... More
Making of compression type repair sleeves

3

-

780.28

... More
Fixing of phase plate, circuit plate, danger plate, Number plate.

1

-

340

... More
Erection of anticlimbing devices

1

-

1492.7

... More
Watch and ward of material during laying and stringing of conductor.

4.5

-

4885.2

... More
Fabrication, galvinisation Supply, delivery to site of the following tower material for insertion of A type towers in Double Circuit of 132KV Habak-Cheshmashahi Tr.line . (for one insertion)

-

-

-

... More
Superstructure

3.92

-

103659

... More
Stubs

0.22

-

103659

... More
Nuts & Bolts

0.24

-

108841.95

... More
Danger Plates

1

-

500.32

... More
Phase Plates

6

-

500.32

... More
Number Plates

1

-

500.32

... More
Circuit Plates

2

-

500.32

... More
Anti Climbing Devices

1

-

6855.34

... More
Conductor ACSR Panther including 1.5%sag and jumpering

0.1

-

210452.55

... More
Mid Span Joints

3

-

934.34

... More
Vibration Dampers

12

-

1092.58

... More
Repair Sleeves

3

-

617.87

... More
Disc Insulators (70 KN)

66

-

715.83

... More
Single suspension Fittings for panther

6

-

2938.65

... More
Single tension Fittings for panther

6

-

3014

... More
Total

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.