Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date4 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 33,65,000
Costs
EMD
₹ 67,300Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Ked/88 Of 2024-25 Dated 04.11.2024 For Creation Of 100kva Sub Stations Alongwith Ht/lt Line At Wss Kore Punnu And Chack Chibba Under Water Supply Scheme Jjm (phe) In Respect Of Jpdcl Electric Sub Division Hiranagar Of Ed Kathua On Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDD_263237_1Tender No
KED/88 of 2024-25 Dated 04.11.2024Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type.
44
-
-
9 Mtr. Long pole (PCC WL -300 KG)
2
-
-
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
3
-
-
GI Channel/Angle/Flat of sizes including clamps.
300
-
-
Galvinized Nuts and Bolts.
8
-
-
Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
6
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Danger plate with clamps
2
-
-
Anti Climbing Devices
2
-
-
3 Ph 4 Wire Trivector meter with CT
1
-
-
Cement bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
2
-
-
Sundary items like Aluminium Lugs, Jumpers , binding tape
1
-
-
Laying of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor at Kore Punnu in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
9 Mtr. Long Pole(WL-300 Kg )
55
-
-
GI V cross-arm with top Bracket including clamp
723
-
-
GI Channel x-arm includingclaps and braces
400
-
-
30 mm² ACSR Weasel Conductor
7.73
-
-
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
165
-
-
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
30
-
-
Galvanized Nuts and Bolts
55
-
-
Danger Plates with Clamp
55
-
-
Anti Climbing Devices with clamps
55
-
-
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
55
-
-
Stone Pad (300mmx300 mmx75mm)
55
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
12
-
-
Laying of LT line on 8 Mtrs. PCC poles with ACSR Weasel Conductor at Kore Punni in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
8 Mtr. Long Pole(WL-200 Kg )
2
-
-
GI U-Clamp for Shackle insulators
8
-
-
16 KN Shackle insulators
8
-
-
30 mm² ACSR Weasel Conductor
0.2
-
-
Galvanized Nuts and Bolts
2
-
-
Danger Plates with Clamp
2
-
-
Anti climbing Devices with Clamp
2
-
-
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
2
-
-
Stone Pad (300mmx300 mmx75mm)
2
-
-
Erection of 11KV Tapping point at Kore Punnu in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
9 Mtr. Long Pole(WL-300 Kg )
2
-
-
GI V cross-arm/Horizontal with top Bracket including clamp
34
-
-
GI Channel/ angle iron including Clamps
52
-
-
11 KV GO , AB switch 3 phase , 3 pole , 200 amp vertically type
1
-
-
30 mm² ACSR Weasel Conductor
15
-
-
PG Clamps for 30mm2 ACSR conductor
3
-
-
11kV Polymeric composite Pin Insulator 12KV5kN, Lighting Impulse 75KV Positive and 80KVNegative, creepage distance 320mm
6
-
-
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm
3
-
-
Galvanized Nuts and Bolts
2
-
-
Danger Plates with Clamps
2
-
-
Anti-Climbing Device with Clamps
2
-
-
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.
2
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Cement bottoming 1:2:4 Mix as per REC Standars
2
-
-
Creation of 100KVA Sub Station alongwith HT/LT Line at Chak Chibba under Water Supply Scheme JJM Scheme in respect of JPDCL Electric Sub Division Hiranagar of Electric Division Kathua
-
-
-
100 KVA, 11/0.433-0.250kV;50 Hz, Al wound Distribution Transformer of latest Energy efficiency level-2 ( new), IS1180 part -1, 2014 as per latest upto date amendment with externally fitted MCCB with cable box and 4x4 mtrs. Suitable cable of ratings.(Aluminium Wound upto 200 KVA, Copper Wound for 250 KVA or Higher KVA rattings.)
1
-
-
Gapless Surge Arrestor,9 kV ,10 KA ,LA with polymer housing, Stn. Type
1
-
-
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
185 mm² (2 Ckt) Cable,1.1KV Grade, PVC Insulated Stranded Conductor FRLS type.
44
-
-
9 Mtr. Long pole (PCC WL -300 KG)
2
-
-
11KV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
3
-
-
GI Channel/Angle/Flat of sizes including clamps.
300
-
-
Galvinized Nuts and Bolts.
8
-
-
Earthing of substation -Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
6
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Danger plate with clamps
2
-
-
Anti Climbing Devices
2
-
-
3 Ph 4 Wire Trivector meter with CT
1
-
-
Cement bottomiing 1:2:4 mix as per REC standerds .5 Cum/pole
2
-
-
Sundary items like Aluminium Lugs, Jumpers , binding tape
1
-
-
Laying of HT line on 9 Mtrs. PCC poles with ACSR Weasel Conductor at Chak Chibba in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
9 Mtr. Long Pole(WL-300 Kg )
33
-
-
GI V cross-arm with top Bracket including clamp
434
-
-
GI Channel x-arm includingclaps and braces
240
-
-
30 mm² ACSR Weasel Conductor
4.64
-
-
11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
99
-
-
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
18
-
-
Galvanized Nuts and Bolts
33
-
-
Danger Plates with Clamp
33
-
-
Anti Climbing Devices with clamps
33
-
-
Earthing Complete by GI Pipe 40mm dia or GI Rod 20mm ,2.5 mtrs long through GI Strip
33
-
-
Stone Pad (300mmx300 mmx75mm)
33
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
7
-
-
Laying of LT line on 8 Mtrs. PCC poles with ACSR Weasel Conductor at Chak Chibba in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
8 Mtr. Long Pole(WL-200 Kg )
2
-
-
GI U-Clamp for Shackle insulators
8
-
-
16 KN Shackle insulators
8
-
-
30 mm² ACSR Weasel Conductor
0.2
-
-
Galvanized Nuts and Bolts
2
-
-
Danger Plates with Clamp
2
-
-
Anti climbing Devices with Clamp
2
-
-
Earthing Complete bu GI Pipe 40mm or GI rod 20 mm 2.5 Mtr long through GI Strip
2
-
-
Stone Pad (300mmx300 mmx75mm)
2
-
-
Erection of 11 KV Tapping point at Chak Chibba in respect of JPDCL Electric Sub Division Hiranagar
-
-
-
9 Mtr. Long Pole(WL-300 Kg )
2
-
-
GI V cross-arm/Horizontal with top Bracket including clamp
34
-
-
GI Channel/ angle iron including Clamps
52
-
-
11 KV GO , AB switch 3 phase , 3 pole , 200 amp vertically type
1
-
-
30 mm² ACSR Weasel Conductor
15
-
-
PG Clamps for 30mm2 ACSR conductor
3
-
-
11kV Polymeric composite Pin Insulator 12KV5kN, Lighting Impulse 75KV Positive and 80KVNegative, creepage distance 320mm
6
-
-
11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75KV Positive and 80KV Negative, creepage distance 320mm
3
-
-
Galvanized Nuts and Bolts
2
-
-
Danger Plates with Clamps
2
-
-
Anti-Climbing Device with Clamps
2
-
-
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.
2
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Cement bottoming 1:2:4 Mix as per REC Standars
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%