Power Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Services
Electrical and Electronics
Electrical Works
Eprocure
Opening Date13 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Rate Contract for upkeep maintt of 33 KV line and R Stn and fabri of material in Divisional Store in respect of STDI JPDCL Jammu
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 9 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back.

1

1500

1500

... More
Erection of 13 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back.

1

2500

2500

... More
Erection of 11 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back.

1

2000

2000

... More
Erection of 9 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back.

1

1500

1500

... More
Painting of 16 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint

1

455

455

... More
Painting of 13 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint

1

444

444

... More
Painting of 11 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint

1

400

400

... More
Painting of 09 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint

1

390

390

... More
Cement Bottoming (U/G,A/G) in 1:3:6 mix including excavation and form work, (16/13/11/9 Mtr Long Poles (Complete Job)

1

600

600

... More
Fixing of Galvanised spiral Earthing of SWG No. 8, G.I wire of 115 turns confirming to REC-J1 construction standard, (J1)

1

730

730

... More
Fixing of 66/33KV Galvanised Guy Set (Guy wire, Guy Rods, Turn Buckle plate ,Guy Insulators) confirming to IS 2141 / 1979 or the latest version thereof including digging of pits & refilling

1

890

890

... More
Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (100mm2 ACSR Conductor)

1

7

7

... More
Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (150mm2 ACSR Conductor)

1

7

7

... More
Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (200mm2 ACSR Conductor)

1

7

7

... More
Dismantling of Steel Tubular Pole including carriage up to dumping site, (16 mtr. Long ) up to distance of 50 mtr

1

1870

1870

... More
Dismantling of Steel Tubular Pole including carriage up to dumping site, (13 mtr. Long ) up to distance of 50 mtr

1

1490

1490

... More
Dismantling of Steel Tubular Pole including carriage up to dumping site, (11 mtr. Long )up to distance of 50 mtr

1

1390

1390

... More
Dismantling of PCC Pole including carriage up to dumping site, (11 mtr. Long )up to distance of 50 mtr

1

2200

2200

... More
Dismantling of Steel Tubular Pole including carriage up to dumping site, (9 mtr. Long )up to distance of 50 mtr

1

999

999

... More
Dismantling of PCC Pole including carriage up to dumping site, (9 mtr. Long )up to distance of 50 mtr

1

1111

1111

... More
Dismantling of Three/Four pole structure, opening of channels, crossarms, angles(Complete Job.)

1

9800

9800

... More
Dismantling of Two pole structure, opening of channels, crossarms, angles (Complete Job.)

1

4200

4200

... More
Straightening of tilted Steel Tubular Pole (16 mtr. Long )

1

999

999

... More
Straightening of tilted Steel Tubular Pole (13 mtr. Long )

1

999

999

... More
Straightening of tilted Steel Tubular Pole (11 mtr. Long )

1

999

999

... More
Straightening of tilted PCC Pole (11 mtr. Long )

1

1200

1200

... More
Straightening of tilted Steel Tubular Pole (9 mtr. Long )

1

700

700

... More
Straightening of tilted PCC Pole (9 mtr. Long )

1

900

900

... More
Unloading of Steel Tubular Pole including carriage up to dumping site, (16 mtr. Long )up to distance of 50 mtr

1

200

200

... More
Unloading of Steel Tubular Pole including carriage up to dumping site, (13 mtr. Long )up to distance of 50 mtr

1

160

160

... More
Unloading of Steel Tubular Pole including carriage up to dumping site, (11 mtr. Long )

1

85

85

... More
Unloading of Steel Tubular Pole including carriage up to dumping site, (9 mtr. Long ) up to distance of 50 mtr

1

85

85

... More
Loading of Steel Tubular Poles including carriage up to dumping site, (16 mtr. Long )

1

320

320

... More
Loading of Steel Tubular Poles including carriage up to dumping site, (13 mtr. Long )

1

250

250

... More
Loading of Steel Tubular Poles including carriage up to dumping site, (11 mtr. Long )

1

187

187

... More
Loading of Steel Tubular Poles including carriage up to dumping site, (9 mtr. Long )

1

187

187

... More
Extra carriage from dumping site, (16 mtr. Long )up to site of work Its 100 mtr

1

145

145

... More
Extra carriage from dumping site, (13 mtr. Long )up to site of work Ist 100 mtr

1

120

120

... More
Extra carriage from dumping site, (11 mtr. Long )up to site of work Ist 100 mtr

1

88

88

... More
Extra carriage from dumping site, (9 mtr. Long )up to site of work Ist 100 mtr

1

70

70

... More
Extra carriage of 9 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in plain areas

1

30

30

... More
Extra carriage of 11 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in plain areas

1

40

40

... More
Extra carriage of 9 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in semi hilly areas

1

40

40

... More
Extra carriage of 11 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in semi hilly areas

1

50

50

... More
Unloading of Steel of Sorts , (Steel)

1

30

30

... More
Loading of Steel of Sorts , (Steel)

1

33

33

... More
Unloading of Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor)at site

1

48

48

... More
Loading of Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor) at site

1

52

52

... More
Fixing of 33 kV Disc Insulator (70 KN) 2008 standards, (Porcelain )

1

280

280

... More
Fixing of 33 kV Disc fitting (70 KN) 2008 standards, (Polymer)

1

180

180

... More
Fixing of 33 kV Insulators (10 KN) standards, (Porcelain )

1

75

75

... More
Fixing of33 kV Pin Insulators (10 KN) suitable for 100/150/200mm² ACSR Conductor.

1

75

75

... More
Replacement/Fixing of 33 kV Tension fittings (Socket & Ball type or T&C Type) for ACSR

1

99

99

... More
Replacement/Fixing of 33 kV Tension fittings (Socket & Ball type or T&C Type) for ACSR 150m²

1

147

147

... More
Replacement/Fixing of 33 kVTension fittings (Socket & Ball type or T&C Type) for ACSR 200m²

1

152

152

... More
Straightening of X-arms of different sizes (100x50x50x6 mm channel Iron,50x50x6mm Angle Iron ) duly painted with one coat of red-oxide and two coats of silver paint fixing with different sizes and sorts of nuts,bolts and washers, (Channel Iron X-arms, Angle Iron-X-arms, Pole Tops)

1

9

9

... More
Straightening of angle iron of different sizes (65x65x6 mm channel Iron,50x50x6mm Angle Iron

1

9

9

... More
Repair and re-erection of Cradle for guard netting with GI wire 8 No including wire binding, cutting /bending of GI Wire as per REC standards

1

15

15

... More
Branch cutting of 33 kV lines

1

1380

1380

... More
Removing of wild climbers/vegetation around 33 kv Poles

1

13

13

... More
Removing of wild climbers/vegetation around 33 kV Tower

1

13

13

... More
Removing of wild climbers from top of 33 kV Lines.

1

13

13

... More
Removing of wild climbers from Peak, cage, cross arm of 33 kV old tower Line

1

13

13

... More
Patrolling of 33 kV Line(Routine/Under fault)

1

300

300

... More
Tightening of loose guys

1

210

210

... More
Dismantling & re-erection of damaged guys including digging of pit & refilling the same

1

780

780

... More
Replacement of damaged Disc insulator in tension string

1

510

510

... More
Replacement of cross arms of sizes 100x50x6

1

340

340

... More
Replacement of angle iron of sizes (65x65x6, 50x50x6)

1

268

268

... More
Replacement of Pin insulator on Four/Three/Double Pole Structure

1

90

90

... More
Replacement of Pin insulator on Single Pole Structure

1

90

90

... More
Replacement of Worn-out/Damaged Jumper of 33 kV Tower lines

1

400

400

... More
Replacement of Disc Insulator, Suspension Fitting of 633 kV Tower lines

1

510

510

... More
Replacement of worn-out/Loose/Damaged Jumper of 33 kV lines (sets of 3 Nos)

1

900

900

... More
Local earthing of 33 kV Lines by way of using discharge/earth rods at faulty site to avoid accident due to any induction while working on Line.

1

500

500

... More
Tightening / restringing of loose ACSR Dog 100 mm2

1

3600

3600

... More
Tightening / restringing of loose ACSR Wolf 150 mm2

1

5000

5000

... More
Tightening / restringing of loose ACSR Panther 200 mm2

1

5000

5000

... More
Dismantling & Re-erection of ACSR Dog 100mm2 including collection of dismantled conductor , making of small bundles and its carriage

1

15000

15000

... More
Dismantling & Re-erection of ACSR Wolf 150mm2 including collection of dismantled conductor , making of small bundles and its carriage

1

18000

18000

... More
Dismantling & Re-erection of ACSR panther 200mm2 including collection of dismantled conductor , making of small bundles and its carriage

1

21500

21500

... More
Dismantling of stay sets complete

1

450

450

... More
33 KV VCB Repairs & Renovation by way of a) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system

1

4100

4100

... More
b) Replacement of Tripping Coil/Closing coil

1

222

222

... More
c) Replacement of Damaged Vacuum Interrupter

1

625

625

... More
d) Replacement of Bushing including Clamps

1

740

740

... More
33 kV C&R Panel: Replacement of different equipment's a) Ammeter, Volt Meter Indication , Lamps, Fuses, Trip Close Switch ,Selector Switch Identification of Panel Wiring Faults & its rectification

1

1800

1800

... More
b) Replacement of Different Relays - MIT Numerical Relay / Electro-mechanical relay / Master Trip Relay/ Differential Relay/Auxiliary Relay etc.

1

888

888

... More
Installation, Testing, commissioning of 66-33 kV Control Relay Panels (Complete Job)

1

4000

4000

... More
Complete testing of Relays Setting of Testing Kit, Interconnection between various points of panel with respect to secondary injection key on various current taps, recording the observation thereof. All modifications necessary to achieve desired results.

1

2650

2650

... More
Control Cable Replacement of damaged Control Cables of all types including binding with PVC Belts/ Binding Wire, Peeling of insulation and fixing of proper size thimble connecting the cable after identification of each core to both ends i.e. Panel to CTs / panel to PTs /panel to Breaker and Making functional of 33 KV Outdoor Breakers, Protection , Alarms, Annunciation (complete Job)

1

12500

12500

... More
Upkeep of earthing of aux. transformer

1

1000

1000

... More
Upkeep of earthing of Power transformer

1

2500

2500

... More
Upkeep of earthing of 33/11 kV LA

1

1000

1000

... More
Providing of extra earthing for improvement purpose (complete job)

1

1500

1500

... More
Upkeep of earth mat of out door yard

1

700

700

... More
Replacement of damaged earth mesh in Sub-Station as per approved Map & Design.

1

400

400

... More
Excavation of trenches of 0.6 Mtr Depth and 2.0 Mtr wide mtr in normal soil / hard soil

1

88

88

... More
Repairing / Laying of MS Flat and MS Rod in deep excavated trench and welding of MS Flat & MS Rod with Mesh.

1

50

50

... More
Repairing of Earthing with Spikes of MS Rod 20mm, 3 Mtr in Length as per REC Drawing

1

600

600

... More
33/11 KV Power Transformer a) Opening of Transformer Tank Top Cover to prevent oil leakage from top (if required to facilitate maintenance of transformer after removing the required accessories), ,Draining/ Re-Filling of required Oil, Change of gaskets of valves/ radiators/ Buchholz's relay radiators valves of power transformer of capacity: 3.15 MVA to 10 MVA

1

7777

7777

... More
b) Replacement of silica gel

1

200

200

... More
c) General Inspection by through inspection of each individual parts, Ratio test by applying voltage on HV Side and measuring LV Voltage on various Tap Positions, checking of Buchholz relay, Surge relay conservator, sensors, measurement of 1R-Value dialectic strength of oil, cleaning of Power Transformer etc

1

5000

5000

... More
d) Replacement of any one of the following i.e. temperature indicators, gas operated Buchholz's relay, oil temperature indicator, winding temperature indicator etc

1

3000

3000

... More
e) Preventing of leakage by changing main gaskets after removing the old gasket, Replacement of HV/LV Busing & Bush Rod, Ring and Rubber Washers (complete job to prevent leakages)

1

3000

3000

... More
f) Cleaning of Scale deposited over the body and radiators of the power transformer with thinner/ detergent and de-rusting in perfect manner.(routine work)

1

3000

3000

... More
g) Cleaning of LV/HV bushings of Power Transformer(routine work)

1

500

500

... More
h) Replacement of Bus Bars of Power Transformer

1

1800

1800

... More
i) Replacement of LV/HV clamps of Power Transformer

1

1500

1500

... More
Oil Topping of Power Transformer 10 MVA

1

2222

2222

... More
Oil Topping of Power Transformer 4 MVA to 6.3 MVA

1

1888

1888

... More
Oil Topping of Power Transformer 3.15 MVA

1

1000

1000

... More
Recording of IR values of transformers

1

700

700

... More
Installation, Testing and Commissing of Power Transformer 66-33/11 KV Installation of LV/HV Bus Bars with proper care, of transformer for any leakage commissioning of Power of Transformers by applying low voltage approximately equal to impedance voltage on HV Side and short circuiting the LV terminals, Energizing the transformer by applying required primary voltage to it & keeping the transformer on no load to observe the behaviour of transformer, setting on 25% of the load on the transformer for a period of at test 6 hours and observation of oil including temperature, increase the transformer is fully loaded and topping of oil. a) 10 MVA

1

32000

32000

... More
b) 6.3 MVA

1

24000

24000

... More
c) upto 5 MVA

1

21000

21000

... More
Checking and tightening of Jumpers, Droppers in 66/33 KV Outdoor Yard

1

1250

1250

... More
Replacement of T/PG clamps

1

35

35

... More
Replacement of Disc insulators including its hardware.

1

395

395

... More
33 KV LA & 11 KV Stn. Type LA Replacement of 66 KV,33 KV & 11 KV Lightening Arrestor including jumpering and earth connecting in all respect. a) 66 KV LA

1

1000

1000

... More
b) 33 KV LA

1

750

750

... More
b) 11 KV LA

1

450

450

... More
Separate pipe Earthing / G.I Rod earthing as per REC Drawing J.2

1

1000

1000

... More
Replacement of pipe earthing / Rod earthing with new one

1

1111

1111

... More
Installation, testing and Commissioning, replacement of 66 KV Isolators

1

1300

1300

... More
Installation, testing and Commissioning,replacement of 33 KV Isolators

1

8800

8800

... More
Replacement of 11 KV Isolators

1

880

880

... More
Repair & Renovation of 66/33 KV and 11 KV isolators including setting right its alignment for proper operation, lubrication/greasing of jaws, bearings operating's handle etc(complete job)

1

1000

1000

... More
Replacement of worn-out/heated Pad clamp/Isolator clamps of 66/33/11 kV Isolator by way of dismantling. Drilling of holes on new and fixing (complete job)

1

400

400

... More
Repair & Renovation of Isolator Jaws 66/33 KV and 11 KV isolators.(complete job)

1

300

300

... More
Replacement of post insulator / tendon pipes/ operating box by way of dimentalling, necessary fabrication where ever required for proper operation of 66/33/11 kv Isolators.

1

300

300

... More
33 KV CTs Installation, testing and Commissioning of 33 kV CTs ( of all ratios ) Complete Job

1

3000

3000

... More
33 KV CTs Repairs & Renovation of 33 KV CTs by way of replacing shorting strips, connecting rod, transformer oil, damaged insulator (CT's of all ratios)

1

2000

2000

... More
Replacement of 33 KV Outdoor Type CT of different ratio and dismantling of damaged CT(CT's of all ratios)

1

3500

3500

... More
Oil Topping of 66/33 kV CT & PT by way of opening of top cover and refixing with new gaskets if necessary and preventing of oil leakages if any.(complete job)

1

1500

1500

... More
66-33 kV PTs Installation, testing and Commissioning of 66-33 kV PTs (complete job)

1

3000

3000

... More
66 kV PTs Replacement of 66 KV Outdoor Type PT and dismantling of damaged PT, dragging to installation/loading site, lifting from ground to steel structure.

1

3500

3500

... More
33 kV PTs Replacement of 66 KV Outdoor Type PT and dismantling of damaged PT, dragging to installation/loading site, lifting from ground to steel structure

1

3000

3000

... More
Cleaning of porcelain bushing, tightening of PT/CT clamps, derusting & painting of body of 33 kV PTs & CTs

1

500

500

... More
Tightening of nuts & bolts, replacement of oval thread bolts, chipping by way of welding to the bolts after tightening in a single bay

1

990

990

... More
Painting with mix red oxide paint two coats of approved make on steel works after cleaning with wire brush/ sand paper

1

5

5

... More
Painting of steel structure erected in outdoor yard with aluminium paint two coats with approved brand and fixture to given an even surface

1

5

5

... More
Battery Bank a) Repair & maintenance of battery set including maintaining specific gravity, electrolyte level, cleaning, checking, tightening of battery terminals in all respects it includes measuring voltage of each battery.

1

900

900

... More
b) Tightening of all nut and bolts, replacement of damaged battery cells

1

500

500

... More
c) Installation, testing and Commissioning of Battery Bank (complete Job)

1

1500

1500

... More
Battery Charger Repair/Renovation battery charger for proper functioning by way of replacement of rectifier unit, Ammeter, Voltmeter, MCB,Cooling fan, LED indications, buzzer alarms for OV/UV etc (Complete Job)

1

1500

1500

... More
Repair and maintenance of DC Board, identification of fault in respect of cable and its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job.

1

900

900

... More
Repair and maintenance of AC Board, identification of fault in respect of cable and its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job.

1

900

900

... More
Installation, testing and Commissioning of Battery Charger (complete Job)

1

1800

1800

... More
Deweeding of vegetation in outdoor yard Removing of stone metal, deweeding of unwanted vegetation, spreading of stone metal collected earlier for removal of vegetation, levelling the area with existing stone metal

1

6

6

... More
Providing of additional stone metal and its carriage and laying in outdoor yard, this including breaking of stones complete job.

1

50

50

... More
Cleaning of Control Room, removing dirt & dust from the panels, walls, cleaning of fixtures (for one bank)

1

400

400

... More
Painting of internal/external walls and roof by approved brand of oil based distemper

1

7

7

... More
Painting of door and window panels of control room by approved brand of paint

1

7

7

... More
Repairs & Renovation of 11 KV VCB, by way of replacement of a) Grid-spout assembly

1

400

400

... More
b) Replacement of damaged CTs of different ratio Testing the CT with the help of primary injection set fixing in pannel, fixing the secondary connection after assessing the load (complete job)

1

1350

1350

... More
c) Thorough checking of control wiring circuits, replacement of damaged wire if any, replacement of terminal plates, tripping circuits, close/ trip switch, ammeter switch, replacement of voltmeter & ammeter .

1

2400

2400

... More
d) Replacement of 11 KV damaged PT

1

800

800

... More
e) Replacement of blown fuses, checking the PT terminal with respect of 11 KV bus bar complete job.

1

800

800

... More
f) Replacement of Trip/Close coil

1

65

65

... More
g) Replacement of Trivector meter on 11/33/66 kV Panels

1

500

500

... More
Installation, testing and Commissioning , replacement of LT cabele

1

8

8

... More
11 KV Power Cables / 33 KV Power cables/66 KV Power cables a) Identification of damaged portion of cable, tracing of cable, remove cable from trench, carriage and laying of cable (complete job) including cleaning of cable trenches.

1

65

65

... More
b) Replacement of damaged cable of sizes

1

115

115

... More
Replacement of termination kits of different sizes, connecting the cable with panel and outgoing structures after crimping of lugs fixing with nuts and bolts, checking of earth point, connecting the earthing point of cable with existing earthing system a) 11 KV Indoor Termination Kit (1-Phase/ 3 phase)

1

2890

2890

... More
b) 11 KV Outdoor Termination Kit (1-Phase/ 3 phase)

1

2890

2890

... More
c) 33 KV Indoor Termination Kit (Single Phase)

1

2688

2688

... More
d) 33 KV Outdoor Termination Kit (Three Phase)

1

2688

2688

... More
e) 33 KV Indoor Termination Kit (Three Phase)

1

2688

2688

... More
f) 33 KV Outdoor Termination Kit (Single Phase)

1

2688

2688

... More
Improvement of earthing system in control room by way of replacement of earthing risers from earthing point to panel / checking of all welding points/ re-welding of lose connection, laying of fresh / additional earth-mat strip to improve the existing earthing system (Complete one Panel set)

1

3500

3500

... More
Checking of IR values

1

900

900

... More
De-watering of receiving station to avoid water logging.

1

2800

2800

... More
Repairing of electrical circuits for improvement of control room immunination, power points etc (Complete Job)

1

1200

1200

... More
Installation, Testing, commissiing for replacement of Aux. Transformer at receiving station

1

5000

5000

... More
On site repairing of aux transformer for missing phase, LT strip, LT bush rod, LT bush cup, HT bush rod etc (Complete job)

1

1200

1200

... More
Transport charges for carriage of T&P, men & material on urgent basis during power breakdown and restoration of system. (auto carrier) aditional 1km @ 90/per km

1

300

300

... More
Replacement of out door yard lights including wiring system and fixing of lamps on fixtures.

1

3000

3000

... More
Marking of equipment's, sign boards by way of painting/fixing of PVC plates for demarcation of different equipment to avoid mishandling.

1

40

40

... More
Replacement/repair/fixing of ceiling fans at Receiving station.

1

400

400

... More
Replacement/repair/fixing of cooling fans on radiators of power transformer to avoid heating.

1

800

800

... More
Flash in 66KV,33 KV & 11 KV Panels due to overloading moisture, Cleaning of carbonized panel by petrol / cotton cloth, replacement of damaged / worn-out lugs, post insulator, Bakelite sheet, arcing chamber panel heaters etc.

1

2200

2200

... More
Repair of plaster of thickness 12 mm to 20 mm in patches of areas 2.5 sqm meters and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete incl. disposal of rubbish to the dumping ground within 50 M lead a) with Cement mortar 1:4 (1 cement : 4 fine / coarse sand)

1

60

60

... More
Cutting of large tree branches falling over 33/11 lines and coming into the corridor to avoid damages/ faults/conductor snapping.

1

1290

1290

... More
Cleaning of cable duct, removing of duct covers and placing back after cleaning the duct including disposal of rubbish up to 50 Mtr lead

1

98

98

... More
Replacing sand store slabs in roofing, laid incement mortar 1:4 (1 cement : 4 coarse sand) including necessary repairs and cement painting with same mortar complete, including disposal of rubbish to dumping ground within 50 Meters of lead

1

90

90

... More
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chow khats, holdfast etc. Complete and stacking with 50 Mtr lead

1

354

354

... More
Providing and fixing T-iron frames for doors, windows and ventilators of mild steel T-sections, joints mitred and welded, including fixing of necessary but hinges and screws and applying a priming coat of approved steel primer (CC 1:3:6)

1

20

20

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 Mtr

1

90

90

... More
Cement concrete 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded Stone aggregate) 62 mm thick

1

88

88

... More
Roof top treatment to prevent water leakage of control room

1

35

35

... More
Repairing of receiving station mesh fencing / Chain link mesh fencing height upto 8ft

1

1000

1000

... More
Watering of earth pits

1

50

50

... More
Cleaning/washing of solar panels & batteries

1

300

300

... More
Cleaning of ACDC,DBDC Board, RTCC, Charger, Battery Bank, Solar batteries, other alike small equipments (complete Job)

1

500

500

... More
Cleaning of 33 kV CRP using vacuum cleaner from inside with proper care, from outside with thinner/varnish and making 33 kV CRP Vermic Proof.

1

300

300

... More
Cleaning of 11 kV Panel using vacuum cleaner from inside with proper care, from outside with thinner/varnish and making it Vermic Proof to avoid rodent faults.

1

300

300

... More
New 33 KV Line Fabrication , erection and painting of 15 Mtr long 33 KV Self supporting tower structure for crossing of road

1

167900

167900

... More
Laying of foundation for 33 KV self supporting Tower Structure 15 Mrs. long including setting of stubs complete job

1

149500

149500

... More
Erection of Channel cross arm of size 100X50X 6mm ,10 feet long and above including fixing of MS flat iron clamps with required size of bolts including punching of bolts complete

1

1900

1900

... More
Erection of Channel cross arm of size 100X50X 6mm up to 09 feet long including fixing of ms flat clamps with required size of bolts including punching of bolts complete

1

1800

1800

... More
Erection of Angle Iron Braces of size 65X65X6 mm ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type above up to 14' long complete

1

2100

2100

... More
Erection of Angle Iron Braces of size 65X65X6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type 6' and above upto 10' long complete

1

1700

1700

... More
Erection of Angle Iron belts of size 50X50X 6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type upto 10' long

1

145

145

... More
Erection of Angle Iron of size 65X65X6 mm fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in crossection type above 11' long complete for guardnetting.

1

270

270

... More
Flat iron ties 50x6 mm size 1 feet long along with fixing with cross arms

1

50

50

... More
Erection of 33 KV Disc insulator (polymer type ) with tension fittings including punching of locking pins complete

1

2150

2150

... More
Erection of 33 KV Pin insulator with pins 3 nos on top of cross arm including fixing of MS Flat Ties to rest it on , punching of base bolt /locking pin complete

1

1850

1850

... More
Erection of Guy rod including digging of pit , Disposal of excavated soil ,refilling of excavated pits in layers of stone boulders and fine soil including fixing , adjusting properly Turn Buckle, Anchor Plate and staining screw complete

1

780

780

... More
Carriage at site , un-bundling , Laying and stringing of ACSR DOG Conductor including making of small bundles of conductor as per site requirement, cutting in required span lengths complete (AS PER REC STANDARD)

1

14000

14000

... More
Erection of anti climbing Devices at ST pole along with fixing /cutting /bending of Barbed wire, fixing with clamps

1

400

400

... More
Erection of Danger plates

1

100

100

... More
Route /temp path clearance by way of cleaning bushes and vegetation & making temp. path cutting & filling for carriage of line material ( 400 mx1mx0.2m)= 80 cum

1

200

200

... More
Watch and ward of the material and T&P round the clock i.e. 3 shifts, Rate of 1 Lab for 1 Shift

1

300

300

... More
Route clearance for corridor of 5 m

1

1400

1400

... More
Installation, testing and Commissioning of 3.15 MVA , 33/11KV Power Transformer (new work)

1

75900

75900

... More
Installation, testing and Commissioning of 5 MVA & 6.3 MVA , 33/11 KV Power Transformer

1

79750

79750

... More
Installation, testing and Commissioning of 10 MVA , 33/11KV Power Transformer

1

97500

97500

... More
Installation, testing and Commissioning of 11kV Panel Borad with VCB Incomer(one no.)

1

23000

23000

... More
Installation, testing and Commissioning of 11kV Panel Borad with VCB outgoing(one no.)

1

23000

23000

... More
Setting of stubs with templates after positioning and leveling of templates excluding cost of foundations

1

3800

3800

... More
Handling and Fabrication of Material in Divisional Store, Fabrication of Angle iron braces/belts /guard netting angles ,fencing posts etc from angle iron of sizes

1

15

15

... More
Fabrication of guy rods complete including turn buckle, staining screw, anchor plate, thereading of guys and staining screw

1

15

15

... More
Fabrication of channel cross arms of sorts from MS channel of sizes , Making holes as per requirement,Punching of members and numbering on each member,Grinding of sharp edges and uneven surface of memebers and painting of members with red oxide paint.

1

15

15

... More
Fabrication of ties, clamps from MS flat ( suitable for 9 mts, 11mts, and 13mts poles)

1

15

15

... More
Fabrication of earthing plates , cable duct covers from MS plate as per REC drawings

1

15

15

... More
Fabrication of earthing spikes from MS Tor steel of sorts as per REC drawings

1

15

15

... More
Fabrication of ST poles by way of drilling of extra holes

1

195

195

... More
Fabrication of foundation bolts from MS Tor steel of sorts including threading as per REC drawings

1

145

145

... More
Fabrication of earthing pipe from GI pipe and welding of earthing plate as per REC drawings

1

300

300

... More
Fabrication of column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures as per REC drawings

1

15

15

... More
Shifting of channel/Angle /Flat iron at and average distance of 50mtr from unloading site to site of stacking and stacked properly.

1

5

5

... More
Shifting of channel/Angle /Flat iron/fabricated material at and average distance of 50mtr for making space for other store material and its stacking .

1

5

5

... More
Unloading of ST poles 9mtr in divisional store

1

350

350

... More
Unloading of ST poles 11mtr in divisional store

1

450

450

... More
Unloading of ST poles 13mtr in divisional store

1

550

550

... More
Unloading of ST poles 16mtr in divisional store

1

650

650

... More
Unloading of PCC Poles 9/8 mtr . in divisional store

1

429

429

... More
Unloading of PCC Poles 11 mtr in divisional store

1

482

482

... More
Unloading of PCC Poles 13 mtr in divisional store

1

528

528

... More
Dragging/shifting of PCC/ST Pole at and average istance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking

1

208

208

... More
Unloading of ACSR Conductor dog in divisional store

1

5

5

... More
Unloading of ACSR Conductor wolf in divisional store

1

5

5

... More
Unloading of ACSR Conductor panther in divisional store

1

5

5

... More
Shifting of Old/New ACSR Conductor at and average distance of 50mtr for unloading site to site of stacking and stacked properlyand also for making space for other store material and its stacking ..

1

2

2

... More
Unloading of 11KV VCB pannels (1+3)

1

11400

11400

... More
Unloading of 11KV VCB pannels (1+4) .

1

13500

13500

... More
Unloading of 11KV VCB pannels (1+5) .

1

19500

19500

... More
Unloading of 11KV VCB pannels OK/Damage(1no) .

1

3500

3500

... More
Unloading ofAC Board/DC Board/Battery bank/ Battery charger

1

750

750

... More
Unloading of 33 VCB /C&R Pannel .

1

3050

3050

... More
Shifting/ dragging of 11/33/66kv panel at an average distance of 50mtr for making space for other store material and its stacking also for making space for other store material and its stacking .

1

1225

1225

... More
Unloading of XLPE Cable 120/185 mm² .

1

15

15

... More
Unloading of XLPE Cable 240/300 mm² .

1

15

15

... More
Unloading of XLPE Cable 400/630 mm² .

1

18

18

... More
Shifting of XLPE Cable all sizes at an average distance of 50mtr from unloading site to site of stacking and stacked properly also for making space for other store material and its stacking ...

1

6

6

... More
Unloading of 66/33/11 KV Cable kits of different sizes

1

50

50

... More
Shifting of 66/33/11 Cable kits of all sizes at an average distance of 50mtr from unloading site to site of stacking and stacked properly also for making space for other store material and its stacking ...

1

20

20

... More
Unloading of Guy/GI wire/Barbed wire including carriage towards stacking site and stacked porperly.

1

2

2

... More
Unloading of Power Transformer 3.15/4 MVA New/damage .

1

24560

24560

... More
Unloading of Power Transformer 5/6.3MVA New/damage .

1

34800

34800

... More
Unloading of Power Transformer 10 MVA New/damage .

1

49500

49500

... More
Unloading of 11KV New/damage Distribution Transformer .

1

1430

1430

... More
Dragging of 3.15/4 MVA New/damage Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking

1

6390

6390

... More
Dragging of 5/6.3 MVA New/damageTransformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking

1

7848

7848

... More
Dragging of 10 MVA New/damage Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking

1

8450

8450

... More
Dragging of 11kv Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking

1

535

535

... More
Unloading of Transformer oil Barrels .

1

350

350

... More
Dragging of Transformer oil old/ new barrel at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking also for making space for other store material and its stacking ..

1

175

175

... More
Unloading of MS Angle, MS Channel, MS flate ,tar steel

1

1

1.2

... More
Unloading of hardware items such as nuts and bolts , clamps of sorts, washers,welding rods,old sarees,chain link mesh,pipe etc .

1

1

1.2

... More
Shifting of hardware items such as nuts and bolts , clamps of sorts, washers,welding rods,old sarees,chain link mesh,pipe etc at an average distance of 50mtr for making space for other store material and its stacking .

1

-

0.8

... More
Unloading of 33/11 KV Dics insulators .

1

15

15

... More
Unloading of 33 KV Dics fittings

1

14

14

... More
Shifting of 33/11 KV disc insulator at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satackingalso for making space for other store material and its stacking .. .

1

6

6.9

... More
Unloading of 33/11 KV Pin insulators/Guy insulator /G.I Pin .

1

12

12

... More
Shifting of 33/11 KV pin insulator /guy/G.I Pins at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .

1

5

5.9

... More
Unloading of Cement .

1

7

7

... More
Shifting of cement/cement block at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .. .

1

3

3

... More
Unloading of 33 KV CT/PT Unit .

1

1800

1800

... More
Shifting of 33 KV CT/PT at an average distance of 50mtr for making space for other store material and its stacking .

1

1190

1190

... More
Unloading of 11 KV CT/PT Unit including carriage towards stacking site and stacked porperly.

1

350

350

... More
Shifting of 11 KV CT/PT at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking . .

1

148

148

... More
Unloading of 33 KV Isolators .

1

470

470

... More
Shifting of 33KV Issolators at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking and also for making space for other store material and its stacking . .

1

219

219

... More
Unloading of 33/66 KV LAs.

1

80

80

... More
Shifting of 33/66KV LAs at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .

1

29

29

... More
Unloading of 11 KV LAs/GO/HG/issolator .

1

54

54

... More
Shifting of 11 KV LAs/GO/HG/issolator at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking . .

1

22

22

... More
Unloading of PVC Cable /Control cable of different size including carriage towards stacking site and stacked porperly.

1

10

10

... More
Unloading of AL Paint /Red oxide paint/ Black paint including carriage towards stacking site and stacked porperly.

1

2

2

... More
Unloading of T&P Items like Drilling machine,chainPully ,Pully lifting machine ,Hand drill machine,AL ladder,welding set,tool kit,crimping tool etc

1

35

35

... More
Unloading of Testing equipments like Meggar, Earth resitivity tester , Oil testing machine,Search Light, Turn ratio meter , multimeter etc .

1

20

20

... More
Unloading of Safety equipments like Safety belts, Safety shoes, Fire Extinguisher,Hand gloves, Yard lights , LED Bulbs , Rubber mat , etc

1

10

10

... More
Shifting of T&P /Testing / Safety equipments at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking . .

1

15

15

... More
Unloading of Filter plant heavy duty

1

4700

4700

... More
Shifting of Filter plant at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .

1

1500

1500

... More
Loading of PCC Poles 9/8 mtr

1

410

410

... More
Loading of PCC Poles 11 mtr

1

510

510

... More
Loading of PCC Poles 13 mtr

1

610

610

... More
Loading of ST poles 9mtr

1

380

380

... More
Loading of ST poles 11mtr

1

490

490

... More
Loading of ST poles 13mtr

1

595

595

... More
Loading of ST poles 16mtr

1

650

650

... More
Loading of ACSR Conductor dog

1

8

8

... More
Loading of ACSR Conductor wolf

1

8

8

... More
Loading of ACSR Conductor panther

1

8

8

... More
Loading of Cement

1

15

15

... More
Loading of 11 KV VCB 1+3 Pannels

1

16500

16500

... More
Loading of 11 KV VCB 1+4 Pannels

1

21300

21300

... More
Loading of 11 KV VCB 1+5 Pannels

1

24900

24900

... More
Loading of 11 KV VCB 1 Pannel OK/Damage

1

4800

4800

... More
Loading of AC Board/ DC Board/Battery charger /Battery bank

1

1200

1200

... More
Loading of 33KV VCB

1

3050

3050

... More
Loading of 33KV C&R Pannels

1

3100

3100

... More
Loading of XLPE Cable 120/185 mm²

1

30

30

... More
Loading of XLPE Cable 240/300 mm²

1

34

34

... More
Loading of XLPE Cable 400/630 mm²

1

40

40

... More
Loading of Cable kits of different sizes

1

32

32

... More
Loading of Guy/GI wire/Barber wire

1

1

1.3

... More
Loading of Power Transformer 3.15/4.0 MVA

1

24800

24800

... More
Loading of Power Transformer 5.0/6.3 MVA

1

34600

34600

... More
Loading of Power Transformer 10 MVA

1

44990

44990

... More
Loading of 11 KV DistributionTransformer

1

1300

1300

... More
Loading of Transformer Oil barrels

1

400

400

... More
Loading of MS Angle iron braces, MS channel cross arms, Guy rod, Earthing spikes, MS Flate

1

1

1.35

... More
Loading of hardware items such as nuts and bolts, clamps of sorts,washers,welding rods,old sarees,chain link mesh,pipe

1

1

1.24

... More
Loading of 33 /11KV Disc insulator

1

15

15

... More
Loading of 33 KV Disc fitting

1

14

14

... More
Loading of 33/11 KV Pin insulator /Guy insulator /G.I Pin

1

12

12

... More
Loading of 33 KV isolator

1

520

520

... More
Loading of 33 KV LA

1

234

234

... More
Loading of 11KV Isolators

1

56

56

... More
Loading of PVC Cable /Control cable of different size including carriage from stacked site.

1

5

5.5

... More
Loading of AL Paint /Red oxide paint/ Black paint

1

2

2.2

... More
Loading of Filter plant heavy duty

1

11000

11000

... More
Carriage of Fabrication column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures etc towards stacking site and stacked properly

1

1

1.3

... More
Loading of Fabrication column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures etc including carriage from stacked site.

1

2

2.2

... More
Loading of 33 KV CT/PT units

1

1820

1820

... More
Loading of 11 KV CT/PT units

1

500

500

... More
Loading of T&P Items like Drilling machine,chainPully ,Pully lifting machine, Hand drill machine,AL ladder,welding set,tool kit,crimping tool etc units

1

35

35

... More
Loading of Testing equipments like Meggar, Earth resitivity tester , Oil testing machine,Search Light, Turn ratio meter , multimeter etc units

1

20

20

... More
Loading of Safety equipments like Safety belts, Safety shoes, Fire Extinguisher,Hand gloves, Yard lights , LED Bulbs , Rubber mat , etcunits

1

10

10

... More
Shifting of allied materials for making space for porper stacking of material

1

2

2.2

... More
Carriage of Fabrication material from fabrication site towards stacking site and proper stacking of material.

1

2

2.2

... More
Repair of store shed by way of replacement of damaged CGI sheets, repair of CGI sheets by way of welding, replacememt of hooks, nuts and bolts, tightening of nuts bolts and hooks and welding .

1

35

35

... More
Collection and carriage of T&P items to working site and back crriage of T&P after job

1

300

300

... More
Sorting of material by way of weighing / measuring and inspection of material and then carriage from weighing / measuring and inspection site to site of fabrication

1

2

2

... More
painting of store shed with red oxide/Al paint single coat

1

50

50

... More
Checking/Measuring/ Inspection/Meggering of XLPE Cable/Control cable by way of unreal and after work agian rereeling on drum

1

35

35

... More
Checking/Measuring/ Inspection of ACSR Conductor by way of unreal and after work agian rereeling on drum

1

10

10

... More
Complete testing/ispection of pannels including relay testing , interconnection,charging polarity etc during issue/receipt/verification.

1

3900

3900

... More
Prototype errection of Gantry /Beam/CT/PT/Isolator sturcture

1

3

3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.