Power Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date10 Oct 2024
Closing DateCancelled
Tender Amount₹ 4,85,000
Costs
EMD
₹ 9,700Document Cost
₹ 193Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDD_258509_1Bid Award Id
ViewTender No
EMDS/62Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor) as per REC standard.
0.1
-
-
Supply,Carraige upto site,, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor) as per REC standard.
0.1
-
-
Supply, transportation and fixing of GI Channel /Angle Iron for Cross Arms, Braces, Transformer Belt, F-Top, Collers etc for Sub Station and poles (Complete Job including Nuts & Bolts and Washers)
366
-
-
Supply and fixing of Gapless surge arrestor, 9 KV, 10KA , LA station Type including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
1
-
-
Supply and fixing of 11KV G.O set (AB Switch 3-phase,3 -pole,200A) including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
1
-
-
Supply and fixing of 11KV Horn Gap fuse set 3 phase,200A including nuts and bolts, washers, clamps etc. complete job as per REC standard. (Drilling of holes prohibited)
1
-
-
Supply and fixing of LT fuse set
1
-
-
Supply and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
15
-
-
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm.
3
-
-
SITC of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (300x 300 x 8 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete .
1
-
-
Supply and fixing of LT Shackle Insulators with G.I Mukhi Clamps (Scaffolding G.I LT Clamps) including nuts and bolts as per REC standard
6
-
-
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
Earthing of Poles Complete by GI Pipe 40 mm or GI Rod 16 mm 3mtr long through GI Strip 25x3 mm (as per REC Standards)
7
-
-
Supply, Carriage up to site, Installation, testing and Commissioning of danger Plates with clamps
5
-
-
Supply, Carriage up to site, Installation, testing and Commissioning of anti-climbing devices with clamps
7
-
-
Supply, Carriage up to site, Installation, testing and Commissioning of Line Spacers
7
-
-
Supply and fixing of 185 mm Sq Single Phase 1.1 KV Grade , PVC Insulated stranded conductor FRLS Type including Aluminum Thimbles, PG/SL Clamps etc. as per REC standard
30
-
-
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole
5
-
-
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole (Pit 600x600x1433.3 mm) for 8 MTR ST Pole
2
-
-
Poviding and Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc.
7
-
-
Supply, Carriage up to site, Installation, of Sign Board (2X2 feet) (Inscribed with Substation Details provided by this Division) along with required accessories like clamps, nuts and bolts etc.
1
-
-
Supply, Carriage up to site, Installation, testing and Commissioning of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
1
-
-
Pre, during and post execution geo tagged photographic evidence consisting of 5x7 inch photographs in coffee table book (covering each pole/Sub Station)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements