Power Development Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Transportation and Logistics
Eprocure
Opening Date25 Apr 2018
Closing Date12 Jun 2018
Tender Amount₹ 70,00,000 
Notes
Download

Costs

Summary

Rate Contract for handling of material at ECSD Pampore

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
S.T.Poles 11 mtr

1

-

117.5

... More
S.T.Poles 13 mtr

1

-

117.5

... More
P.C.C. Pole 8 Mtr

1

-

187

... More
P.C.C. Pole 9 Mtr

1

-

222

... More
Poles:Carriage of Steel Tubular / Cement Poles by Manual/Mechanical means from stacking site and loading of same on trucks.

-

-

-

... More
S.T.Poles 8 mtr

1

-

42.5

... More
S.T.Poles 9 mtr

1

-

60

... More
S.T.Poles 11 mtr

1

-

77.5

... More
S.T.Poles 13 mtr

1

-

77.5

... More
P.C.C. Pole 8 Mtr

1

-

108

... More
P.C.C. Pole 9 Mtr

1

-

135

... More
Conductor:Unloading of ACSR Conductor drums by Manual/Mechanical means, Verification/testing of materials as per GTP and Storage of same.

-

-

-

... More
ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum

1

-

908.4

... More
ACSR 0.03 Cond. (Weasel)Avg. 8.0Km/Drum

1

-

963.35

... More
ACSR 0.05 Cond. (Rabbit)Avg. 5.0Km/Drum

1

-

984

... More
ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum

1

-

984.75

... More
ACSR 0.15 Cond (wolf )Avg. 0.5Km/Drum

1

-

999

... More
ACSR 0.2 Cond (Panther )Avg. 11Km/Drum

1

-

1013.54

... More
ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum

1

-

1392

... More
Carriage of ACSR Conductor Drums from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum

1

-

413.65

... More
ACSR 0.03 Cond. (Weasel)Avg. 8.0Km/Drum

1

-

481.78

... More
ACSR 0.05 Cond. (Rabbit)Avg. 5.0Km/Drum

1

-

504

... More
ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum

1

-

505

... More
ACSR 0.15 Cond (wolf )Avg. 0.5Km/Drum

1

-

522

... More
ACSR 0.2 Cond (Panther )Avg. 11Km/Drum

1

-

539.4

... More
ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum

1

-

992

... More
Transformers: Unloading of Transformers by Manual/Mechanical means, Verification/testing of materials as per GTP and Carriage to Storage site including Storage of same.

-

-

-

... More
25- KVA S/R Transformers

1

-

359.25

... More
63 KVA Distb..Transformer

1

-

716.25

... More
100 KVA S/R Transformer

1

-

925

... More
200 KVA S/R Transformer

1

-

1330

... More
400 KVA S/R Transformer

1

-

2750

... More
630 KVA S/R Transformer

1

-

3225

... More
6.3 MVA Power Transformer

1

-

18524

... More
10 MVA Power Transformer

1

-

24800

... More
Carriage of Transformers from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
25- KVA S/R Transformers

1

-

337.5

... More
63 KVA Distb..Transformer

1

-

746.5

... More
100 KVA S/R Transformer

1

-

950

... More
200 KVA S/R Transformer

1

-

1290

... More
400 KVA S/R Transformer

1

-

2300

... More
630 KVA S/R Transformer

1

-

2775

... More
6.3 MVA Power Transformer

1

-

12174

... More
10 MVA Power Transformer

1

-

18450

... More
Unloading of PVC Cable Drums by manual/ mechanical means. Verification/ testing of materials as per GTP & carriage to storage site including storage of the same.

-

-

-

... More
185 Sqmm 1 core PVC Cable

1

-

873.46

... More
240 Sqmm 1 core PVC Cable

1

-

951.66

... More
300 Sqmm 1 Core PVC Cable

1

-

1051.68

... More
ABC 120 mm Sq. 5 Core PVC Cable

1

-

1108.5

... More
120 Sqmm 1-core PVC Cable

1

-

766.17

... More
95 Sqmm 1-core PVC Cable

1

-

744.35

... More
50 Sqmm 1-core PVC Cable

1

-

671.61

... More
10 Sqmm 1-core PVC Cable

1

-

600.69

... More
6 Sqmm 1-core PVC Cable

1

-

595.23

... More
70 Sqmm 1-core PVC Cable

1

-

707.98

... More
16 Sqmm 2-core PVC Cable

1

-

745.23

... More
10 Sqmm 2-core PVC Cable

1

-

682.52

... More
50 sqmm 1.1 grade ariel bunched Cable 5-core

1

-

788

... More
35 sqmm 1-core PVC Cable

1

-

644.35

... More
185 Sqmm 3.5 core Cable

1

-

1799.08

... More
Carriage of PVC Cable Drums from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
185 Sqmm 1-core PVC Cable

1

-

371.92

... More
240 Sqmm 1 core PVC Cable

1

-

465.45

... More
300 Sqmm 1 Core PVC Cable

1

-

585.07

... More
ABC 120 mm Sq. 5 Core PVC Cable

1

-

652.5

... More
120 Sqmm 1-core PVC Cable

1

-

243.6

... More
95 Sqmm 1-core PVC Cable

1

-

217.5

... More
50 Sqmm 1-core PVC Cable

1

-

130.5

... More
10 Sqmm 1-core PVC Cable

1

-

45.67

... More
6 Sqmm 1-core PVC Cable

1

-

39.15

... More
70 Sqmm 1-core PVC Cable

1

-

174

... More
16 Sqmm 2-core PVC Cable

1

-

152.25

... More
10 Sqmm 2-core PVC Cable

1

-

143.55

... More
50 sqmm 1.1 grade ariel bunched Cable

1

-

269.7

... More
35 sqmm 1-core PVC Cable

1

-

97.87

... More
185 Sqmm 3.5 core Cable

1

-

1479

... More
C&R Panels:Unloading of 11KV VCB Panels by Manual/Mechanical means, Verification/testing of materials as per GTP and Carriage to Storage site including Storage of same.

-

-

-

... More
11 KV VCB Pannels (INCOMER)

1

-

1123.67

... More
11 KV VCB Pannels (out going)

1

-

1123.67

... More
11 KV VCB Pannels Sets (1+3)

1

-

2874.67

... More
11 KV VCB Pannels Sets (1+4)

1

-

3458.34

... More
11 KV VCB Pannels Sets (1+5)

1

-

4042.01

... More
11 KV VCB Pannels Sets (2+5)

1

-

4625.68

... More
11 KV VCB Pannels Sets (2+1+5)

1

-

5194.8

... More
11 KV VCB Pannels Sets (2+1+7)

1

-

6358.5

... More
33 KV C&R Pannel

1

-

509.11

... More
C&R Panels: Carriage of 11KV VCB Panels from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
11 KV VCB Pannels (INCOMER)

1

-

219.67

... More
11 KV VCB Pannels (out going)

1

-

219.67

... More
11 KV VCB Pannels Sets (1+3)

1

-

878.7

... More
11 KV VCB Pannels Sets (1+4)

1

-

1098.37

... More
11 KV VCB Pannels Sets (1+5)

1

-

1318.05

... More
11 KV VCB Pannels Sets (2+5)

1

-

1537.73

... More
11 KV VCB Pannels Sets (2+1+5)

1

-

1740

... More
11 KV VCB Pannels Sets (2+1+7)

1

-

2175

... More
33 KV C&R Pannel

1

-

130.5

... More
Other key Materials: Unloading of below key materials by Manual/Mechanical means, Verification/testing of materials as per GTP and Carriage to Storage site including Storage of same.

-

-

-

... More
Transformers Oil Fresh (in barrels of 209 litres)

1

-

85.61

... More
Oil Filtration Plant

1

-

940.07

... More
11KV Horn Gap Fuse sets

1

-

6.56

... More
11 KV Disc Insulators

1

-

2.1

... More
11 KV Pin Insulators

1

-

0.9

... More
LT Shackle Insulators

1

-

0.72

... More
sundry Materials

1

-

50.01

... More
Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
Transformers Oil Fresh (in barrels of 209 litres)

1

-

82.21

... More
Oil Filtration Plant

1

-

435

... More
11KV Horn Gap Fuse sets

1

-

6.52

... More
11 KV Disc Insulators

1

-

1.74

... More
11 KV Pin Insulators

1

-

0.44

... More
LT Shackle Insulators

1

-

0.45

... More
sundry Materials

1

-

43.5

... More
Meters:Unloading of Metera by Manual/Mechanical means, Verification/testing of materials as per GTP and Carriage to Storage site including Storage of same.

-

-

-

... More
10-60 Amp. 1-Phase Energy Meters

1

-

6.4

... More
20-80 Amp. 3-Phase Energy Meters

1

-

11.8

... More
Meters: Carriage of Meters from Storage Site to Loading Site and Loading of same into Truck

-

-

-

... More
10-60 Amp. 1-Phase Energy Meters

1

-

4

... More
20-80 Amp. 3-Phase Energy Meters

1

-

8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.