Power Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Goods
Security and Emergency Services
Eprocure
Opening Date18 Dec 2023
Closing Date31 Jan 2024
Tender Amount₹ 14,53,628 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply , Installation , Testing and Commissioning of Addressable multicriteria smoke detector, Address Switch to programme the modules, complete as required as per specifications.

14

-

-

... More
Supply , Installation , Testing and Commissioning of Addressable Heat detector, Address Switch to programme the modules, complete as required as per specifications.

14

-

-

... More
Supply, Installation, Testing and Commissioning of Addressable Manual Call Point, Address Switch to programme the Manual Pull Station, complete as required as per specifications.

8

-

-

... More
Supply, Installation, Testing and Commissioning of Sounder with 90 db output at 1 metre distance cum Strobe Lights with 110 cd as per specification complete as required with power supply.

12

-

-

... More
Supply, Installation, testing and commissioning of Addressable control module for Hooter & Solenoid Activation, Address Switch to programme the modules, complete as required as per specifications. - UL Listed

9

-

-

... More
Supply, Installation, Testing and Commissioning of 2C x 1.5 sq.mm FRLS armoured Fire Survival multistranded copper armoured cable.

450

-

-

... More
SITC of Microprocessor based Master Controller with 16X2 LCD DISPLAY capable of operating in 4 ultrasonic frequency band spectrums. The controller should support upto 20 transducers in dedicated connection & 24 transducers in single loop @300 sq.ft each for Room Void Area & 150 sq.ft each for Ceiling & Floor Void each and networkable on RS 485 having facility to support Hardwired Third Party BMS integration via Modbus & potential free NO-NC contacts. The system shall use UL and CE approved transformers for power supply.

1

-

-

... More
Supply, Installation, Testing & Commissioning of Transducer units complete as required and as per specifications.

24

-

-

... More
Testing, Commissioning & Verification Kit comprising of Ultrasound Wave Analyzer (Software and Hardware) that can do the following: a. Capture,Record and Report (in pdf format) One Third Octave Ultrasound Band Frequencies emitted from the transducers thereby ensuring HUMAN SAFETY as per IRPA Guidelines (International Radiation Protection Association, Geneva). b. Capture,Record and Report (in pdf format) ultrasound output from each transducer depicting individual frequency peaks along with corresponding sound pressure levels, current operating band and the Controller Name for verifying the product.

1

-

-

... More
Supply, installation, testing & Commissioning of Armoured Wire (2C x 14 / 40 SWG Copper Cable) complete as required and as per specifications as approved by Rodent manufacturer.

400

-

-

... More
Supply, installation, testing & Commissioning of Bracket Stand complete as required and as per specifications.

1

-

-

... More
ASPIRATION SMOKE DETECTION SYSTEM: consisting of :- a) SITC of Intelligent Aspiration Smoke Detection system with Single pipe inlet aspiration detector for Up to 5000 sq. ft coverage; Networkable over 2 core wire, Programmable Alarm Thresholds; Offline/online configuration capability; Instant Fault Finder; AutoLearn Smoke; AutoLearn Flow; Multiple Event Logging in separate logs; Event log – up to 18000 events. Alarm Threshold Setting Range: 0.005% - 20.00% obs/m (0.005 - 20% obs/mtr). Approvals- UL,FM, CFE, VdS, CE - EMC and CPD, EN 54-20. b) SITC of Power Supply units -  UL approved power supply unit with 230VAC input and 18 to 29VDC output. The power supply unit has the indications for AC input Power.Power supply unit should have capacity to operate on battery backup in case of AC mains failure & should have built in charging circuit for batterys. c) SITC of Sampling Pipe having Smooth bore PVC Pipe 25mm Outer Dia & 19 to 21mm Inner Dia with all required accessories. d) SITC of 2 core twisted pair shielded cable for networking - 24 AWG Stranded (7x32) tinned copper conductor in suitable PVC conduit. e) SITC of Trunk Adaptor, Capillary Tube Connector, Capillary Tube, Capillary Sampling Point,  Sampling point label red (complete set) for air sampling in room voids for area having false ceilings.(Complete Job)

1

-

-

... More
Revamping of CCTV system and integration with the existing system at Data Center (HONEYWELL MAKE)

1

-

-

... More
Supply , installation, testing and commissioning of UL listed 32 bit 2 reader networkable access controller with capacity to handle 4 readers and 8 alarm inputs and with IP on board technology complete with enclosure and power supply as required.

4

-

-

... More
Supply , installation. testing and commissioning of Smart Card Reader complete as required and as per specification complete as required.

5

-

-

... More
Supply , installation, testing and commissioning of UL listed 3-5" read range Proximity card reader with Integrated keypad

1

-

-

... More
Supply , installation, testing and commissioning of 600lbs Single Electromagnetic lock with integrated magnetic sensor, door open alarm buzzer with timer for single leaf access doors.

4

-

-

... More
Supply , installation, testing and commissioning of 2x600lbs Double Electromagnetic lock with integrated magnetic sensor. door open alarm buzzer with timerfor dual leaf access doors

2

-

-

... More
Supply & Fixing of Magnetic contacts for all access and fire doors (one for each single leaf door and two for each doouble leaf doors).

4

-

-

... More
Supply , installation, testing and commissioning of Push to exit button for access doors which have readers only on one side.

2

-

-

... More
Supply . installation, testing and commissioning of Smart Cards etc. complete as required.

50

-

-

... More
Supply , installation, testing and commissioning of Emergency break glass unit for access doors which have readers on both in and out sides ( TO BE INSTALLED ON THE INSIDE OF THE DOOR)

6

-

-

... More
Supply & Fixing of ZL bracket for 12llbl EM Lock.

6

-

-

... More
Supply ,laying and termination of 8C x 0.75 sq mm screen shielded cable for access control in existing conduits

400

-

-

... More
Supply.laying and termination of 4C X .75 sq mm PVC insulalted copper conductor flexible unarmoured cable in exisitng conduits for power

150

-

-

... More
CAMC of complete system for one years after sucessful completion of warraty period

1

-

-

... More
NOTE:- 1) Measurable quantities shall be paid as per actual on the approved rates within the estimated amount. 2) Any item not mentioned in the BOQ but found necessary for testing, commissioning and proper functioning of the system shall be deemed to be included in the BOQ and nothing extra shall be paid.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.