Power Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Jan 2025
Closing Soon22 Jan 2025
Tender Amount₹ 71,31,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size)

6

5202

31217.4

... More
Random Rubble masonary with Hard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

110

7677

844508.5

... More
Random Rubble Masonary laid dry well bonded and faced with selected stones with bond stones (Quarry)

20

5536

110731

... More
Providing and laying in position cement concrete ofspecified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

4

6591

26365

... More
Carriage of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead up to 20 Km

43.12

409

17676.61

... More
Stone aggregate average lead upto 20 Km

8.9

409

3648.47

... More
Stone soling average lead 20 Km

130

482

62700.3

... More
Cement & steel average lead 20 Kms

11.38

364

4146.08

... More
Carriage of different construction material from road side to actual work site by manual labours /ponnies

-

-

-

... More
Crushed Stone Aggregate over a lead of 500 meters

8.9

593

5285.53

... More
Sand over a lead of 500 meters

43.12

593

25608.11

... More
Stones over a lead of 500 meters

130

642

83461.3

... More
Cement over a lead of 500 meters

11.38

269

3067.5

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

4500

4500

... More
(B) Construction of Breast wall/Protection wall/jacketing wall of tower location No. 324 of 132 Kv Mirbazar Tethar Transmission Line of TLMD-II Pampore

-

-

-

... More
Jungle clearanced by way of cutting of bushes/thorns/plant etc.

0.3

635

190.5

... More
Earthwork in excavation by manual means in trenchs for foundations , drains , pipes , cables etc ( exceeding 1.5 m in width ) and for shafts , wells ,cesspits and the like not exceeding 10 sqm on plan , depth upto 1m from cutting edge ,disposed earth to be levelled and neatly dressed.

13.5

592

8004.15

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Quarry

4.5

5202

23413.05

... More
Random Rubble masonry with ~ard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

82

7677

629542.7

... More
Random Rubble Masonry laid dry well bonded and faced with selected stones with bond stones (Quarry)

17.5

5536

96889.63

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

3

6591

19773.75

... More
Carriage of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead up to 20 Km

32.17

409

13187.77

... More
Stone aggregate average lead upto 20 Km

6.68

409

2738.4

... More
Stone soling average lead 20 Km

99.5

482

47989.85

... More
Cement & steel average lead 20 Kms

8.49

364

3093.16

... More
Carriage of different construction material from road side to actual work site by manual labours/ponnies

-

-

-

... More
Crushed Stone Aggregate ove a lead of 500 meters

6.68

593

3964.15

... More
Sand over a lead of 500 meters

32.17

593

19102.15

... More
Stones over a lead of 500 meters

99.5

642

63880

... More
Cement over a lead of 500 meters

8.49

269

2289.5

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

4500

4500

... More
(C) Construction of Breast wall/Protection wall/jacketing wall of tower location No. 322 of 132 Kv Mirbazar Tethar Transmission Line of TLMD-II Pampore

-

-

-

... More
Jungle clearanced by way of cutting of bushes/thorns/plant etc

0.3

635

190.5

... More
Earthwork in excavation by manual means in trenchs for foundations , drains , pipes , cables etc ( exceeding 1.5 m in width ) and for shafts , wells ,cesspits and the like not exceeding 10 sqm on plan , depth upto 1m from cutting edge ,disposed earth to be levelled and neatly dressed

13.5

592

8004.15

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Quarry

4.5

5202

23413.05

... More
Random Rubble masonry with ~ard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

72

7677

552769.2

... More
Random Rubble Masonry laid dry well bonded and faced with selected stones with bond stones (Quarry)

15

5536

83048.25

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

3

6591

19773.75

... More
Carriage of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead up to 20 Km

28.67

409

11752.98

... More
Stone aggregate average lead upto 20 Km

6.68

409

2738.4

... More
Stone soling average lead 20 Km

87

438

38132.97

... More
Cement & steel average lead 20 Kms

7.67

364

2794.41

... More
Carriage of different construction material from road side to actual work site by manual labours/ponnies

-

-

-

... More
Crushed Stone Aggregate ove a lead of 500 meters

6.68

593

3964.15

... More
Sand over a lead of 500 meters

28.67

593

17023.57

... More
Stones over a lead of 500 meters

87

642

55854.87

... More
Cement over a lead of 500 meters

7.67

269

2067.02

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

4500

4500

... More
(D) Construction of Breast wall/Protection wall/jacketing wall of tower location No. 321 of 132 Kv Mirbazar Tethar Transmission Line of TLMD-II Pampore

-

-

-

... More
Jungle clearanced by way of cutting of bushes/thorns/plant etc

0.3

635

190.5

... More
Earthwork in excavation by manual means in trenchs for foundations , drains , pipes , cables etc ( exceeding 1.5 m in width ) and for shafts , wells ,cesspits and the like not exceeding 10 sqm on plan , depth upto 1m from cutting edge ,disposed earth to be levelled and neatly dressed

13.5

592

8004.15

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Quarry

4.5

5202

23413.05

... More
Random Rubble masonry with ~ard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

70

7677

537414.5

... More
Dry Random Rubble Masonry laid dry well bonded and faced with selected stones with bond stones (Quarry)

17.5

5536

96889.63

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

3

6591

19773.75

... More
Carriage of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead uo to 20 Km

27.97

409

11466.02

... More
Stone aggregate average lead upto 20 Km

6.68

409

2738.4

... More
Stone soling average lead 20 Km

87.5

482

42202.13

... More
Cement & steel average lead 20 Kms

7.5

364

2732.48

... More
Carriage of different construction material from road side to actual work site by manual labours/ponnies

-

-

-

... More
Crushed Stone Aggregate ove a lead of 500 meters

6.68

593

3964.15

... More
Sand ove a lead of 500 meters

27.97

593

16607.85

... More
Stones ove a lead of 500 meters

87.5

642

56175.88

... More
Cement ove a lead of 500 meters

7.5

269

2022.53

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

4500

4500

... More
(e) Construction of Breast wall/Protection wall/jacketing wall of tower location No. 317 of 132 Kv Mirbazar Tethar Transmission Line of TLMD-II Pampore

-

-

-

... More
Jungle clearanced by way of cutting of bushes/thorns/plant etc

0.9

635

571.5

... More
Earthwork in excavation by manual means in trenchs for foundations , drains , pipes , cables etc ( exceeding 1.5 m in width ) and for shafts , wells ,cesspits and the like not exceeding 10 sqm on plan , depth upto 1m from cutting edge ,disposed earth to be levelled and neatly dressed

27

592

16008.3

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Quarry

9

5202

46826.1

... More
Random Rubble masonry with ~ard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

150

7677

1151602.5

... More
Random Rubble Masonry laid dry well bonded and faced with selected stones with bond stones (Quarry)

20

5536

110731

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

6

6591

39547.5

... More
Carriage of of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead uo to 20 Km

59.43

409

24362.73

... More
Stone aggregate average lead upto 20 Km

13.35

409

5472.7

... More
Stone soling average lead 20 Km

170

482

81992.7

... More
Cement & steel average lead 20 Kms

15.83

364

5767.34

... More
Carriage of different construction material from road side to actual work site by manual labours/ponnies

-

-

-

... More
Crushed Stone Aggregate ove a lead of 500 meters

13.35

593

7928.3

... More
Sand over a lead of 500 meters

59.43

593

35294.29

... More
Stones over a lead of 500 meters

170

642

109141.7

... More
Cement over a lead of 500 meters

15.83

269

4268.88

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

8000

8000

... More
(f) Construction of Breast wall/Protection wall/jacketing wall of tower location No. 316 of 132 Kv Mirbazar Tethar Transmission Line of TLMD-II Pampore

-

-

-

... More
Jungle clearanced by way of cutting of bushes/thorns/plant etc

0.9

635

571.5

... More
Earthwork in excavation by manual means in trenchs for foundations , drains , pipes , cables etc ( exceeding 1.5 m in width ) and for shafts , wells ,cesspits and the like not exceeding 10 sqm on plan , depth upto 1m from cutting edge ,disposed earth to be levelled and neatly dressed

27

592

16008.3

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Quarry

9

5202

46826.1

... More
Random Rubble masonry with ~ard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)

150

7677

1151602.5

... More
Random Rubble Masonry laid dry well bonded and faced with selected stones with bond stones (Quarry)

25

5536

138413.75

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering (above plinth) 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Quarry)

6

6591

39547.5

... More
Carriage of of materials by mechanical transport from source upto road site

-

-

-

... More
Sand average lead uo to 20 Km

73.43

409

30101.89

... More
Stone aggregate average lead upto 20 Km

13.35

409

5472.7

... More
Stone soling average lead 20 Km

140

482

67523.4

... More
Cement & steel average lead 20 Kms

19.15

364

6976.92

... More
Carriage of different construction material from road side to actual work site by manual labours/ponnies

-

-

-

... More
Crushed Stone Aggregate ove a lead of 500 meters

13.35

593

7928.3

... More
Sand over a lead of 500 meters

73.43

593

43608.61

... More
Stones over a lead of 500 meters

140

642

89881.4

... More
Cement over a lead of 500 meters

19.15

269

5164.18

... More
Manual Carriage of water from near by source upto site of work by ponnies

1

7000

7000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.