Power Development Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Power Development Department - PDD Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date11 Apr 2025
Closing DateCancelled
Tender Amount₹ 1,46,000
Costs
EMD
₹ 2,920Document Cost
₹ 200Tender Fee
Refer Documents
Summary
Shifting Of Electric Utilities And Construction Of Approach Road To The Staff Quarters Of Forest Department At Dairy Farm Deewanbagh Under Dc Head
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PDD_275580_1Tender No
01Tender Authority
Power Development Department ViewPurchaser Address
-Website
http://http://www.jkpdd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I Channel / Angle / Flat / V - X arms with extension top of sizes including suitable clamps/collars As per REC Standard
38
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV Polymeric composite pin insulators 12kV, 5kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm
6
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Galvanised Nuts & Bolts
3
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Spike earthing rod 20mm 2.5mtr long with G.i strip (25X3)mm
2
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I LT structure mukhi type with shackles
4
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Galvanised stay set with 50X8mm stay clamp, guy insulator (02nos), anchor plate (200X200X6)mm nut bolts, 02nos turn buckle, 1.8m long, 16mm diameter solid GS stay rod & 7/3, 15mm dia GI stranded wire complete
2
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Earthing of Sub Station --Excavation of earth pit dia 650mm & depth 3000mm, installation of earthing pipe of 40mm nominal bore & 4mm wall thickness & length 2.5mtr long as per IS 1239. GI strip for neutral earthing of size 25mmX3mm for connection of transformer body, GO set & lightening arrestors as per IS 2629/85, GI nut & bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover.
3
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
1
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Wedge connector / PG Clamps
6
-
-
... More
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole
2
-
-
... More
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole (Pit 600x600x1433.3 mm) for 8 MTR ST Pole
1
-
-
... More
Poviding and Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand (Nerolac/ Asian) paints) including cost of paint along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc.
2
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Danger Plate with clamps
2
-
-
... More
Supply,Testing,Loading,Transportation,Unloading and Fixing of Anti climbing device with clamps
2
-
-
... More
Dismantalling ST Pole 9mtr. Long (Dismantelled material along with allied material shall be returned by Sub Division to the Divisional store
2
-
-
... More
Dismantalling ST Pole 8mtr. Long (Dismantelled material along with allied material shall be returned by Sub Division to the Divisional store
1
-
-
... More
Dismantalling / Re-location of 63kVA L-2 Substation from one location to another location
1
-
-
... More
Supply,Loading,Transportation,Unloading and fixing of Sign Board (2X2 feet) along with required accessories like clamps, nuts and bolts with all details viz. Name of the Village, Name of the Work,Head,Date of Start,Date of completion, Implementing Agency(KPDCL O&M Division Baramulla), Name of the contractor.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements