National Highways And Infrastructure Development Corporation Limited Tender

... More
The NHIDCL has issued a formal invitation for competitive bids for the National Highways And Infrastructure Development Corporation Limited project, for Nhidcl/jk/dpr /srinagar-leh/m-k/ Nh-01/2020-21 in Srinagar, Jammu & Kashmir. The bid opening date for this tender is 04-11-2020 and the last date for bid submission is 14-12-2020. Interested bidders for National Highways And Infrastructure Development Corporation Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Consultancy Services
Eprocure
Opening Date4 Nov 2020
Closing Date14 Dec 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/jk/dpr /srinagar-leh/m-k/ Nh-01/2020-21

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transportation (Fixed costs)

-

-

-

... More
Office Rent (Fixed Costs)

-

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
LA & Clearances II Report

6

-

-

... More
A. Land acquisition Team including support staff

-

-

-

... More
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, etc.

1

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Remuneration for Local Staff (including per diem allowance)

-

-

-

6

-

-

... More
Office Manager (1 No.)

8

-

-

... More
Typist (1 No.)

8

-

-

... More
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication

8

-

-

... More
Draft EMP

4

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Inception Report & QAP

3

-

-

... More
Duty Travel to Site (Fixed Costs)

-

-

-

... More
Land Acquistion Expert

4

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km

4

-

-

... More
Night Watchman (1 No.)

8

-

-

... More
Office Furniture and Equipment

1

-

-

... More
Sub-soil Investigation & Other Works

-

-

-

... More
Ex-Patwari or equivalent

4

-

-

... More
Senior Bridge Engineer

8

-

-

... More
B. Investigation (Fixed cost)

-

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Monthly Report (03 sets)

24

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

6

-

-

... More
Traffic and Safety Expert

4

-

-

... More
Senior Survey Engineer

6

-

-

... More
Draft Feasibility Report

4

-

-

... More
Typist

4

-

-

... More
Reports and Document (Fixed costs)

-

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Support Staff (Fixed Rates)

-

-

-

... More
A. Topographical Survey (Fixed Rate)

-

-

-

6

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.

1

-

-

... More
Final EMP

6

-

-

... More
Net Work Survey and GPR

-

-

-

... More
Utility Expert

4

-

-

... More
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.

8

-

-

... More
Environmental Specialist

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Sub-Soil Investigation

-

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

4

-

-

... More
Team Leader cum Senior Highway Engineer

8

-

-

... More
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment out of which 3 nos. sub-professional having 3 years experience and 2 nos. sub-professional be a fresh graduate)

-

-

-

... More
Final Feasibility Report

6

-

-

... More
Draft Bidding Documents

4

-

-

... More
Cost of supply and fixing Boundary Pillars

-

-

-

... More
Ex-Kanoongo/ Girdawar or equivalent

4

-

-

4

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)

9

-

-

6

-

-

... More
Grand Total

-

-

-

... More
Quantity Surveyor/Documentation Expert

6

-

-

... More
B. Logistics for Land acquisition Team

-

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Printers

4

-

-

6

-

-

... More
Survey and Investigation

-

-

-

... More
Land Acquisition Team including support staff and logistics/transportation

-

-

-

... More
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (2 Vehicle for 8months each)

16

-

-

... More
b) Boring in hard rock

300

-

-

... More
Office Boy (1 No.)

8

-

-

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Material cum Geotechnical Engineer cum Geologist

8

-

-

... More
Office Furniture and Equipment (Fixed costs)

-

-

-

... More
Final Environmental Assessment report & RAP

6

-

-

... More
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.

1

-

-

... More
Computer including necessary peripherals

4

-

-

... More
All Trips

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.