National Bank For Agriculture And Rural Development Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
National Bank For Agriculture And Rural Development - NABARD Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Jan 2025
Closing Date13 Feb 2025
Tender AmountRefer Documents
Costs
EMD
₹ 23,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NABA_845980_1Bid Award Id
ViewTender No
131805Tender Authority
National Bank For Agriculture And Rural Development ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour charges for the complete repair of all electrical points in one 2 BHK flat in Block No.4/5 , including dismantling, plastering, and restoration of walls as necessary, in accordance with the technical specifications of model/reference flat (Flat No. 01 in Block No.03) or as per the instructions of the Bank. (Cost of all necessary equipment, material & labour required for plastering/restoration of walls, which shall also be provided by the contractor, is included in this item)
Note: The number of electrical points (e.g., light points, fan points, power points, etc.) may be increased or decreased from the existing count based on the directions provided by NABARD.
1
-
-
... More
Labour charges for the complete repair of all electrical points in one 2/3 BHK flat in Block No.3, (WITHOUT dismantling, plastering, laying of conduits inside walls, restoration of walls), in accordance with the technical specifications of model/reference flat (Flat No. 01 in Block No.03) or as per the instructions of the Bank. Note: The number of electrical points (e.g., light points, fan points, power points, etc.) may be increased or decreased from the existing count based on the directions provided by NABARD.
1
-
-
... More
Labour charges for the complete repair of all electrical points in 2 BHK flat in Block No.4, (WITHOUT dismantling, plastering, laying of conduits inside walls, restoration of walls), in accordance with the technical specifications of model/reference flat (Flat No. 01 in Block No.03) or as per the instructions of the Bank. Note: The number of electrical points (e.g., light points, fan points, power points, etc.) may be increased or decreased from the existing count based on the directions provided by NABARD.
1
-
-
... More
Labour charges for the complete repair of all electrical points in 1BHK flat in Block No.6/7/8, including dismantling, laying cables/conduits, plastering, and restoration of walls as necessary, in accordance with the technical specifications of model/reference flat (Flat No. 09 in Block No.06) or as per the instructions of the Bank. (Cost of all necessary equipment, material & labour required for plastering/restoration of walls, which shall also be provided by the contractor, is included in this item)
Note: The number of electrical points (e.g., light points, fan points, power points, etc.) may be increased or decreased from the existing count based on the directions provided by NABARD.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements