Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Municipal Corporation - HAUDD Tender
Agriculture or Forestry Works
Eprocure
Opening Date18 Jul 2024
Closing Date23 Jul 2024
Tender Amount₹ 56,25,000
Costs
EMD
₹ 1,12,500Document Cost
₹ 1,600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HAUDD_253435_1Bid Award Id
ViewTender No
NIET 06 e-tendering /2024-25 LRWDTender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing & laying /Black cutting / Nallah Muck / GSB filling got by lorries including Loading, unloading. Ramming, dressing, and watering in layers and , including all sorts of carriages complete job.
137.14
123426
900
Providing and laying in position cement concrete of specified grade excluding to the cost of centering and shuttering. All work upto plinth level 1:4:8 (1: cement : 4 Sand; 8 Graded stone agg. 40 mm nominal size. Crushed including carriages by all means of transport up to site of work complete job.
78.05
443714
5685
Providing and laying 60mm thick rubber moulded coloured interlocked tiles of required shade laid over 50mm sand cushion including all carriages complete job as directed at site by engineer incharge.
11000
1595000
145
Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc
1087
311262
286.35
12mm thick cement plaster on walls in 1:6 mix including all carriages by all means of transport upto site of work complete job.
1050.19
287752
274
Providing & Laying in position cement concrete.1:1:5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm N.S crushed),reinforced cement concrete excluding the cost of centering, shuttering, finishing & reinforcement. All work upto plinth level, including all carriages by all means of transport upto site of work complete job
31.2
257556
8255
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level complete job including all carriages complete job.(TMT Bars)
1716
211411
123.2
Providing and laying in position cement concrete of specified grade excluding to the cost of centring and shuttering. All work upto plinth level. 1:3:6 (1: Cement: 3 Sand: 6 Graded stone agg. 20 mm nominal size) crushed including all carriages by all means of transport upto site of work complete job.
256.79
1592098
6200
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) overand including priming coat with water thinnable cement primer
613.38
98386
160.4
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
41.42
5345
129.05
Earth filling got by lorries including loading unloading,ramming dressing watering royality, (Sweet Earth ) as per directions of enginner incharge (earth stack measured will be reduced by 20% for payment ) including all carriges upto site of work complete job
198.19
158552
800
Refilling the excvated availible earth including levelling, watering, dressing and ramming etc complete job as per directions of engineer incharge
200.5
43789
218.4
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
288
45201
156.95
Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.)
a) In rows 5cm apart in either direction
671.47
12086
18
Supplying and Planting of Ginko Biloba of Collar grith 25 mm 30 mm & height 6' feet in pits of size (1.x5x1x1.5 feet) grown in polybags
115
46000
400
Maintenance first year: Maintenance BWO cleaning deweeding and removal of unwanted material around the pit with a minimum area 2'x2'. Regular maintence watering /prunning of tress as per site requirement. Appliction of 10kg vermicompost to be utilized in two quarters per plant (, June-August & September -November ) NKP-( N=90gm, K =60gm, P=40gm) after every Quaeter.
115
16100
140
Maintenance second year: Maintenance BWO cleaning deweeding and removal of unwanted material around the pit with a minimum area 2'x2. Regular maintence watering /prunning of tress as per site requirement. Appliction of 20kg vermicompost to be utilized in three quarters per plant (March-May, June-August & September -November ) NKP-( N=90gm, K =60gm, P=40gm) after every Quaeter.
115
29900
260
Maintenance Third year: Maintenance BWO cleaning deweeding and removal of unwanted material around the pit with a minimum aera 2'x2'. Regular maintence / watering /prunning of tress as per site requirement. Appliction of 20kg vermicompost to be utilized in two quarters per plant March - May, June - August & September -November ) NKP-( N=90gm, K =60gm, P=40 gm) after every Quaeter.
115
34500
300
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements