Ministry Of Road Transport And Highways Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Ministry Of Road Transport And Highways - MORTH Tender

Services
Civil And Architectural Services
Eprocure
Opening Date28 Oct 2024
Closing Date12 Dec 2024
Tender Amount₹ 30,00,00,000 
Notes
Download

Costs

  • EMD

    0
  • Document Cost

    ₹ 5,900
  • Tender Fee

    ₹ 5,900

Summary

Pmc Services For Fs, Preparation Of Dpr, Providing Pre-construction Services And Construction Supervision Of Construction For 2 Lane With Ps Of Nh 701a For

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Highway cum Pavement Engineer

5

-

-

... More
Meterial cum Geotechnical Engineer - Geologist

6

-

-

... More
Senior Survey Engineer

13

-

-

... More
Road/Traffic Safety Expert

4

-

-

... More
Environmental Specilist

6

-

-

... More
Quantity Surveyor / Documentation Expert

6

-

-

... More
Land Acquistion Expert

14

-

-

... More
Utility Expert

12

-

-

... More
Sub-Total-1

-

-

-

... More
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)

-

-

-

... More
Sub-Professional-1

-

-

-

... More
Sub-Professional-2

-

-

-

... More
Sub-Professional-3

-

-

-

... More
Sub-Professional-4

-

-

-

... More
Sub-Professional-5

-

-

-

... More
Sub-Professional-6

-

-

-

... More
Sub-Professional-7

-

-

-

... More
Sub-Total-2

-

-

-

... More
Total(Sub Total 1 + Sub Total 2)

-

-

-

... More
SUPPORT STAFF(inclusive of per diem allowance)

-

-

-

... More
Office Manager

18

-

-

... More
Typist

18

-

-

... More
Office Boy

18

-

-

... More
Night Watch ment

18

-

-

... More
Total:

-

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
Innova/Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (2*18) Rate per month

36

-

-

... More
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*18) Rate per month

18

-

-

... More
Total:

-

-

-

... More
Duty Travel to Site(Fixed Costs): Trips

-

-

-

... More
Employers HQ

18

-

-

... More
Other Trips

18

-

-

... More
Total:

-

-

-

... More
Office Rent (Fixed Costs) The rent includes maintenance, cleaning, repairing etc. (Rate per Month)

-

-

-

... More
During DPR & Pre-construction

18

-

-

... More
Total:

-

-

-

... More
OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)

-

-

-

... More
Office Supplies

18

-

-

... More
Drafting Supplies

18

-

-

... More
Computer Running Costs

18

-

-

... More
Domestic and International Communication

18

-

-

... More
Total:

-

-

-

... More
OFFICE FURNITURE AND EQUIPMENT (Rental)

-

-

-

... More
Office Furniture and Ecquipment (LS)

-

-

-

... More
Total:

-

-

-

... More
REPORTS & DOCUMENTS PRINTING ( For Clubbed Projects)

-

-

-

... More
Monthly report (3 copies per Month)

3

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with LA Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment Report & RAP

4

-

-

... More
Final Environmental Assessment Report and RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

6

-

-

... More
Final EMP.

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Total:

-

-

-

... More
Survey and Investigation: A. Topographical Survey (Fixed Rate)

-

-

-

... More
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.

-

-

-

... More
Detailed topographic surveys using mobile / aerial LiDAR or better Technology

-

-

-

... More
B. Investigation (Fixed Cost)

-

-

-

... More
Road and Bridge Inventory

-

-

-

... More
FWD Test and Pavement Evaluation

-

-

-

... More
Roughness Survey

-

-

-

... More
Axle Load Survey

-

-

-

... More
Material Survey and Investigation

-

-

-

... More
Sub-grade Investigation

-

-

-

... More
Traffice Survey

-

-

-

... More
Socio-economic & Census Survey/Studies

-

-

-

... More
Land Acquisition Studies

-

-

-

... More
Any other Investigations/Surveys

-

-

-

... More
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.

-

-

-

... More
a) Boring in all type of soils (other than hard rock)

1500

-

-

... More
b) Boring in hard rock

200

-

-

... More
Total:

-

-

-

... More
C. Network Survey and GPR

-

-

-

... More
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Total:

-

-

-

... More
Cost of Supply and Fixing Boundary pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )

1

-

-

... More
Total:

-

-

-

... More
Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :

-

-

-

... More
Ex-Land Revenue Inspector/ Officer or equivalent (1*8)

8

-

-

... More
Ex-Kanoogo/Girdwar or equivalent (1*8)

8

-

-

... More
Ex-Patwari or Equivalent (1*8)

8

-

-

... More
Typist (2*8)

16

-

-

... More
Peon (1*8)

8

-

-

... More
Number of Land acquisition Teams (One Only)

-

-

-

... More
Grand Total for All Land acquisition Teams(A)

-

-

-

... More
B. Logistics for Land Acquisition Team

-

-

-

... More
Computer including necessary peripherals (2*8)

16

-

-

... More
Printers (2*8)

16

-

-

... More
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*8)

8

-

-

... More
Number of Land acquisition Teams (One Only)

-

-

-

... More
Grand Total (B)

-

-

-

... More
Grand Total for All Land acquisition Teams and Logistics (A) + (B)

-

-

-

... More
Estimate of Local Currency costs B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) . REMUNERATION FOR LOCAL PROFESSIONAL STAFF For Normal Highway Project Construction Period 24 months+DLP 60months

-

-

-

... More
Team Leader cum Senior Highway Engineer

39

-

-

... More
Resident cum Highway Engineer (2 nos)

108

-

-

... More
Bridge/Structural Engineer

39

-

-

... More
Senior Pavement Specialists

24

-

-

... More
Senior Quality cum Material Expert

24

-

-

... More
Road Safety expert

23

-

-

... More
Sub-Total(A)

-

-

-

... More
B: Sub Professional Staff Construction Period 24 months+DLP 60months

-

-

-

... More
Survey Engineer (2 nos)

58

-

-

... More
Assistant Highway Engineer (3 nos)

132

-

-

... More
CAD Expert

12

-

-

... More
Environmental Engineer

6

-

-

... More
Assistant Bridge Engineer (2 nos) (number may be increased to 3 if no. of bridges and structures are more and total man-month are accordingly corrected.

48

-

-

... More
Assistant Quality cum Material Engineer (3 nos)

72

-

-

... More
Electrical Engineer

7

-

-

... More
HTMS/Toll Expert

3

-

-

... More
Quantity Surveyor

32

-

-

... More
Horticulture cum Landscaping Expert

36

-

-

... More
Lab Technician (4 Nos)

96

-

-

... More
Document/Data Entry Operator

24

-

-

... More
Sub-Total (B)

-

-

-

... More
Total (A+B)

-

-

-

... More
Support Staff

-

-

-

... More
Office Manager

84

-

-

... More
Accountant cum cashier

84

-

-

... More
Steno cum Computer Operator

84

-

-

... More
Office Boy (1 no)

84

-

-

... More
Total

-

-

-

... More
Transportation (Fixed rate on rental basis) The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc., for all complete approx 4000km/month run

-

-

-

... More
Description of Vehicles

-

-

-

... More
Innova/Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (3 nos during Construction Period and 1 nos During Development and O&M Period), (3*24+1*30) Rate per month

102

-

-

... More
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1 nos during Construction Period and 1 nos During Development and O&M Period), (1*24+1*60) Rate per month

84

-

-

... More
Total

-

-

-

... More
Duty Travel to Site(Fixed Costs) (for all lengths of projects): Professional and Sub-Professional Staff. *Rate quoted includes Hotel charges, travel cost etc, complete (Trips)

-

-

-

... More
For 40 round trips to Employers HQ

40

-

-

... More
For 40 round trips to Other Trips

40

-

-

... More
Total

-

-

-

... More
Office Rent (Fixed Costs)- Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)

-

-

-

... More
200 sqm (During Construction)

24

-

-

... More
50 sqm (During Maintenance)

60

-

-

... More
Total

-

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month

-

-

-

... More
Office Supplies

84

-

-

... More
Drafting Supplies

84

-

-

... More
Computer Running Costs

84

-

-

... More
Domestic and International Communication

84

-

-

... More
Total

-

-

-

... More
Office Furniture and Equipment (Rental) The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.

-

-

-

... More
During Construction

24

-

-

... More
During Maintenance

60

-

-

... More
Total

-

-

-

... More
Reports and Document Printing ( rate as per copy)

-

-

-

... More
Monthly reports (Design and Construction) ((24+60)*3)

252

-

-

... More
Half yearly Reports (8*3)

24

-

-

... More
Various others reports as provided in the Concession Agreement such as Completion Report (4*3)

12

-

-

... More
Total

-

-

-

... More
Road Survey Equipment (Rate per Km) The cost shall include carrying out survey using equipment, manpower, software and report processing.

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle. Kms - 75 No. of times survey to be conducted - 8 (75*8)

600

-

-

... More
Pavement strength measurement using FWD Kms - 75 No. of times survey to be conducted - 4 (75*4)

300

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit or Drone technology Kms - 75 No. of times survey to be conducted - 8 (75*8)

600

-

-

... More
Road signs inspection using Retro Reflectometer Kms - 75 No. of times survey to be conducted - 8 (75*8)

600

-

-

... More
Total

-

-

-

... More
Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.

-

-

-

... More
Staff

-

-

-

... More
Sub-Professional-1

-

-

-

... More
Sub-Professional-2

-

-

-

... More
Sub-Professional-3

-

-

-

... More
Sub-Professional-4

-

-

-

... More
Sub-Professional-5

-

-

-

... More
Sub-Professional-6

-

-

-

... More
Sub-Total-I

-

-

-

... More
II. Mobiliation and Demobilization

-

-

-

... More
A. International Airfares (Fixed costs)

1

-

-

... More
B. Inland Travel in Home Country (Fixed costs)

1

-

-

... More
C. Other Missc expenses (like DA, internal travel expenses other incidentals)

1

-

-

... More
Sub-Total-II

-

-

-

... More
Total (I+II)

-

-

-

... More
Contigencies

-

-

-

... More
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of contingency shall be operated with the specific approval from the Competent Authority in agency (Fixed as Rs. 10,00,000) to be entered by bidder.

1

-

-

... More
Grand Total:

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.