Lakes And Waterways Development Authority Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Lakes And Waterways Development Authority Tender
Eprocure
Opening Date25 Aug 2021
Closing Date18 Sep 2021
Tender Amount₹ 5,45,145
Costs
EMD
Refer DocumentsDocument Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_HAUDD_136262_1Bid Award Id
ViewTender No
NIT NO.LDII/15 of 2021-22Tender Authority
Lakes And Waterways Development Authority ViewPurchaser Address
-Website
http://http://jklda.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removal of old paint from GI fencing with standard paint remover and the like by scrapping by sand papering complete job.
835
-
10.5
... More
Applying priming coat with ready mixed red oxide zinc chromate primer or approved brand and manufacture on steel galvanized iron and steel work.
835
-
52.75
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade one or more coat on old work.
835
-
77.1
... More
Providing and Fixing 12mm thick prelaminated particle board pannels with locking arrangements for doors complete job as per direction of Engineer incharge.
1.12
-
3000
... More
Providing and laying vitrified floor tiles in different sizes ( thickness to be specified by the manufacturer ) with water absorpotion less than 0.08% and confirming to IS 15622 of approved make including all colours and shades to be approved by the incharge Engineer laid on 20mm thick cement mortor 1:4 (1cement : 4 coarse sand) including grouting the joints with while cement and matching pegment etc. complete size of tile 600mmx600mm
6.93
-
1482
... More
Construction of Almirah with 19mm ply board of approved brand 1'-6" deep with maximum shelves inside and fixing of dul mica on face of standard quality (ISI) mark the job also includes fixing of providing and fixing of accessories and locking arrangments complete job as per direction of engineer incharge.Measurements to be taken of the face area of the Almirah..
4.46
-
12000
... More
Earth work in excavation by any means for manholes/sewer in all classification of soil such as loose or soft soil mud /slush/ dense /hard soil/ rocks of all sorts including all leads lifts and job includes removal of hard crust of materials/ bituminous clearance, demolition of lime concrete cement/reinforced cement conc./ RS masonary/ brick masonary ( Dry or any mix) dressing of sides and ramming of bottoms including dewatering on account of all possible factors, such spring, seepages, brocken water mains, rain snow etc including diversion of drain water/ diversion of road etc cutting down of trees of roots of trees of all girths, removal of grass/ vegetation bushes and tree trunks refilling of excavated earth in sides of trenches in layers not exceeding 20cm. consolidating each deposited layer by ramming and watering and disposal of the excavated surplus material as per direction of engineer incharge complete job.
6.48
-
436
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All works upto plinth level. In1:4:8 ( 1 cement:4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Crushed
0.96
-
4419.85
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All works upto plinth level. In1:2:4 ( 1 cement:2 coarse sand :48 graded stone aggregate 20 mm nominal size) Crushed
0.86
-
5877.45
... More
Form work, Centring and shuttering including strutting , propping etc and removal of form work
-
-
-
... More
FOUNDATIONS , footings, bases of columns,etc for mass concrete
5.31
-
262.3
... More
Steel work welded in built up sections/ framed work with plates of 6mm thick including cutting, hoisting fixisng in position and applying a priming coat of approved steel primer using structural steel etc as required in grattings, frames, guard bars, ladders, railings, brackets gates and similar works.
47
-
133.3
... More
Providing and laying of PVC pipe of 100mm dia,Heavy duty ISI mark ( PRINCE make or equivalen),class-B weight as per dia standards including cost of all fittings,additional collars,bends,tees if any rubbers,gaskets,sealing compound ,joint filers,testing and all other connecting job whatso eveinvolved for providing,laying and testing(Complete Job).
12
-
400
... More
Re lettering of sign boards with approved brand of paint and preparation of the surface as per directions of the Engineer incharge complete job.
5000
-
1.9
... More
Carriage of materials by mechanical transport from source to site of work including loading,unloading and stacking.
-
-
-
... More
Stone aggregate 20mm nominal size from Athwajan (Av lead 16 Kilometers)
1.63
-
307.58
... More
Sand from Ganderbal (Av lead 19 Kilometers)
1.53
-
339.26
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements