Jammu And Kashmir State Power Development Corporation Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Jammu And Kashmir State Power Development Corporation - JKSPDC Tender

Works
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date24 Jul 2024
Closing Date14 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Painting of gauge post 1.8 m long with synthetic enamel of approved brand & manufacture to give an even shade by two or more coats and marking the gauge with Japan paint Red, Black and White with standard metric gradation marking of 5 mm thickness in black & white alternately & red synthetic enamel of width 5 mm at every 50 mm etc complete

-

-

2000

... More
Geodetic Survey of an area on different scales and preparation of topographical maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. On scale of 1:5,000 with 2–3 m contour intervals:In moderate to thick forest cover in flat hilly/mountainous terrain

-

-

61800

... More
Cadastral Survey (Boundary Survey) complete including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge

-

-

21300

... More
Establishment of Temporary Bench Mark of standard specifi cations including its painting, engraving etc complete including cost of manpower, material, labour, etc, as per directions of engineer-in-charge

-

-

1140

... More
Double Levelling Survey for control points In Semi hilly Terrain

-

-

12300

... More
River cross section survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By wading in very shallow reaches River span up to 100 m

-

-

9000

... More
Longitudinal river survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By wading in very shallow or By boat in moderate depth reaches Up to 10 km

-

-

30000

... More
Manufacturing supplying and fixing retro reflective sign boards made up of 2mm thick aluminum sheet, face to be fully covered with high intensity encapsulated type heat activated retro reflective sheeting conforming to type-IV of ASTM-D-4956-01 in blue and silver white or other colour combination including subject matter, message (bi-lingual), symbols and borders etc. as per IRC : 67-2001, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class -2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminum alloy rivets @ 20cm c/c to back support frame of M.S. angle iron of size 25x25x3mm along with theft resistant measures mounted and fixed with 2 nos. M.S. angles of size 35x35x5mm to a vertical post made upto M.S. Tesection ISMT 50x50x6mm welded with base plate of size 100x100x5mm at the bottom end and including making holes in pipes, angle flats, providing and fixing M.S. message plate of required size steel work to be painted with two or more coats of synthetic enamel paint of required shade and of approved brand & manufacture over priming coat of zinc chromate yellow primer (vertical M.S.-Tee support to be painted in black and white colours). Backside of aluminum sheet to be painted with two or more coats of epoxy paint over and including appropriate priming coats including all leads and lifts etc. complete as per drawing, specification and direction of Engineer-in-charge. 6.66.2 Cautionary/warning sign boards of equilateral triangular shape having each side of 900 mm support length of 3650mm.

-

-

5237.85

... More
Hire Charges of Motor Car with Driver including maintenance and repairing of vehicle including POL Non-AC Motor Car (Sumo/ Bolero or equivalent)

-

-

3000

... More
Providing of room accomodation for the survey personnel during night halt during ongoing survey works

-

-

1000

... More
Hire charges of tents, bedding etc for survey camp at actual site

-

-

800

... More
Providing ponies for shifing survey equipment and allied items from road site to actual site and from one camp site to other

-

-

900

... More
Hire Charges for Hydraulic excavator of 1 cum bucket for channelisation of streams at discharge obsrvation sites

-

-

800

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

-

-

1249.1

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as Directed: 50 meter beyond 1 m from cutting edge All kinds of Soil.

-

-

673.3

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size).

-

-

7564.8

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size).

-

-

8422.45

... More
Centring and shuttering including strutting, propping etc. & removal of form work for:-Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets etc.

-

-

288.35

... More
Steel work welded in built-up sections/framed work, including cutting, hoisting fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

-

-

181.6

... More
Providing and construction of temporary diversion bund for diversion of water with filled bags of sand across the Gauge Post including the cost of empty bags, filling material (course sand) including filling same in empty cement bags, carriage, sewing & strings , water proofing polythene sheet of good quality for checking of leakage of water across the bund, and dismantling the same after completion of concrete work. Dimensions 1m x 1m x 10m (In case of change of dimensions, same shall be paid proportionately)

-

-

22990

... More
Composing/Making of all Drawings for Preparation of Pre – Feasibility Report (AutoCAD Charges):

-

-

-

... More
Contour Plan.

-

-

3500

... More
Site Plan.

-

-

1800

... More
L-Sections

-

-

2500

... More
X-Sections of Nallah at Head Works, Tail Race & Weir/Barrage Gate.

-

-

600

... More
Composing of Photographs including Front Page.

-

-

70

... More
Editing Charges of all Drawings

-

-

1500

... More
Printing Charges of all Drawings & Computer Typing including Printouts of Pages for Preparation of Pre – Feasibility Report:

-

-

-

... More
A3 Printouts (Site Plan, Contour Plan, & Geological Map)

-

-

60

... More
A0 Printouts (L-Section)

-

-

600

... More
Carriage for items applicable as per JKSOR 2022 (Unit rate is in percentile corresponding to unit rate as per JKSOR 2022)

-

-

100

... More
Any Other item listed in JKSOR-2022 required to be executed during survey, investigation, identification of new power potential sites and allied works (Unit rate is in percentile corresponding to unit rate as per JKSOR 2022)

-

-

100

... More
Any other item as per CWC SOR 2012 (Unit rate is in percentile corresponding to unit rate as per CWC SOR 2012 with 50% price appreciation)

-

-

150

... More
Any other item not listed in JKSOR-2022/ CWC SOR 2012 but required to be executed during survey, investigation, identification of new power potential sites and allied works (Unit rate is in percentile corresponding to unit rate as per Rate Analysis considering all applicable taxes & 15 % CPOH)

-

-

100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.