Jammu And Kashmir State Power Development Corporation Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Jammu And Kashmir State Power Development Corporation - JKSPDC Tender
Civil And Construction
Eprocure
Opening Date16 Aug 2024
Closing Date6 Sep 2024
Tender Amount₹ 82,900
Costs
EMD
₹ 1,660Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SPDC_257008_1Tender No
enit 02 of 2024-25 dt 12-08-2024Tender Authority
Jammu And Kashmir State Power Development Corporation ViewPurchaser Address
-Website
http://http://www.jkspdc.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply of empty Cement bags
288
-
2
Supply of coarse sand
10.08
-
770
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
288
-
7.8
Loading /unloading sand/ earth filled bags in lorries; lead upto 50m.
288
-
4.95
Unloading sand/ earth filled bags in lorries; placing in water
288
-
18.5
Dismantling of temporary diversion bund of sand filled bags after completion of all work and carriage to outside of water
288
-
18.5
Proving and fixing water proofing polythene sheet of good quality for checking of leakage of water across the bundof filled bags of sand for smooth running of concrete work
30
-
50
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
0.4
-
6591.25
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size)
1.99
-
7275.25
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
7.92
-
286.35
steel work welded in built up section, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
53.87
-
181.6
Providing and fixing of caliberated Gauge Plate150mm wide and 3mm thick of good quality sheet to be welded with gauge post steel channel including cost of welding, nut & bolts and making of holes for fixing with the gauge post steel channel complete (2X2m)
2
-
1500
Paroviding & fixing of 6mm mild steel wire / ropee to be fixed with guage post across nallah and with cable post on both sides of nallah.Guage post +cable post + water way
60
-
90
Carriage of material from source to the site by mechanical transport including loading and unloading complete
-
-
-
cement 1KM
0.72
-
114.44
Carriage of material from source to the site by manual lobour (Head load) including loading and unloading complete
-
-
-
Cement 300m
0.72
-
201.47
Crushed aggregate 500m
2.15
-
593.88
Sand 500m
1.08
-
593.88
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements