Jammu And Kashmir State Power Development Corporation Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Jammu And Kashmir State Power Development Corporation - JKSPDC Tender
Civil And Construction
Excavation
Eprocure
Opening Date2 Mar 2023
Closing Date22 Mar 2023
Tender AmountRefer Documents
Costs
EMD
₹ 20,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Survey And Investigation Including Channelization Of New And Existing Gauge Sites Of Cid Division.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SPDC_206525_1Bid Award Id
ViewTender No
CID/PDC/Sgr/09 of 2022 23 dt 28.02.2023Tender Authority
Jammu And Kashmir State Power Development Corporation ViewPurchaser Address
-Website
http://http://www.jkspdc.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Painting of gauge post 1.8 m long with synthetic enamel of approved brand & manufacture to give an even shade by two or more coats and marking the gauge with Japan paint Red, Black and White with standard metric gradation marking of 5 mm thickness in black & white alternately & red synthetic enamel of width 5 mm at every 50 mm etc complete
1
1500
1500
Geodetic Survey of an area on different scales and preparation of topographical maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. On scale of 1:5,000 with 2–3 m contour intervals: In moderate to thick forest cover in flat hilly/mountainous terrain
1
61800
61800
Cadastral Survey (Boundary Survey) complete including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge
1
21300
21300
Establishment of Temporary Bench Mark of standard specifi cations including its painting, engraving etc complete including cost of manpower, material, labour, etc, as per directions of engineer-in-charge
1
1140
1140
Double Levelling Survey for control points In Semi hilly Terrain
1
12300
12300
River cross section survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By wading in very shallow reaches River span up to 100 m
1
9000
9000
River cross section survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By boat in moderate depths River span up to 100 m
1
12000
12000
Longitudinal river survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By wading in very shallow or By boat in moderate depth reaches Up to 10 km
1
30000
30000
Design & Supply of Banners on good quality front lit 12 Oz. Star/LG Flex with one side Multi color solvent based printing [minimum 6 pass] with suitable hanging arrangement at four ends as per the direction of Engineer in Charge.
1
3200
3200
Hire Charges of Motor Car with Driver in uniform including maintenance and repairing of vehicle including POL Non-AC Motor Car (Sumo/ Bolero or equivalent)
1
2500
2500
Providing of room accomodation for the survey personnel during night halt during ongoing survey works
1
500
500
Hire charges of tents, bedding etc for survey camp at actual site
1
800
800
Providing ponies for shifing survey equipment and allied items from road site to actual site and from one camp site to other
1
900
900
Hire Charges for Hydraulic excavator of 1 cum bucket for channelisation of streams at discharge obsrvation sites
1
800
800
Hire charges of Differential Global Positioning System (DGPS), for establishing bench marks on Global Coordinates Complete Job for a location (including Operator)
1
10000
10000
Providing of Unskilled Labor for removal of boulders manually for channelisation of streams at discharge observation sites
1
625
625
Deployment of Multi Tasking Worker for diff erent office and site works with weekly rest (Matriculate)
1
20000
20000
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1
1249
1249.1
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as Directed: 50 meter beyond 1 m from cutting edge All kinds of Soil.
1
673
673.3
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size).
1
7564
7564.8
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, sunken floors fillets etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size).
1
8422
8422.45
Centring and shuttering including strutting, propping etc. & removal of form work for:-
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets etc.
1
288
288.35
Steel work welded in built-up sections/framed work, including cutting, hoisting fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
1
181
181.6
Providing and construction of temporary diversion bund for diversion of water with filled bags of sand across the Gauge Post including the cost of empty bags, filling material (course sand) including filling same in empty cement bags, carriage, sewing & strings , water proofing polythene sheet of good quality for checking of leakage of water across the bund, and dismantling the same after completion of concrete work. Dimensions 1m x 1m x 10m (In case of change of dimensions, same shall be paid proportionately)
1
22990
22990
Composing/Making of all Drawings for Preparation of Pre – Feasibility Report (AutoCAD Charges):
-
-
-
Contour Plan.
1
3500
3500
Site Plan.
1
1800
1800
L-Sections
1
2500
2500
X-Sections of Nallah at Head Works, Tail Race & Weir/Barrage Gate.
1
600
600
X-Sections of Water Conductor/Power Canal.
1
180
180
Composing of Photographs including Front Page.
1
70
70
Index Map
1
600
600
Aerial Map
1
1000
1000
Editing Charges of all Drawings
1
1500
1500
Printing Charges of all Drawings & Computer Typing including Printouts of Pages for Preparation of Pre – Feasibility Report:
-
-
-
A3 Printouts (Site Plan, Contour Plan, & Geological Map)
1
60
60
A0 Printouts (L-Section)
1
600
600
A4 Printouts (X-Sections of Nallah, Weir/Barrage Gate, Water Conductor & Index
1
25
25
A3 Solid Printouts (Aerial View Map).
1
180
180
Computer Typing Charges including Printouts.
1
20
20
Laser Printing/Photostat charges
1
2
2
Spiral Binding of PFR Copies
1
60
60
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements