Jammu And Kashmir State Power Development Corporation Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Jammu And Kashmir State Power Development Corporation - JKSPDC Tender
Civil And Construction
Eprocure
Opening Date14 Dec 2018
Closing Date31 Dec 2018
Tender Amount₹ 20,96,700
Costs
EMD
₹ 42,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_SPDC_67121_1Bid Award Id
ViewTender No
E-NITNo USHP-II/GD/19of 2018dated12-12-2018Tender Authority
Jammu And Kashmir State Power Development Corporation ViewPurchaser Address
-Website
http://http://www.jkspdc.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling of Adjusting rings of Draft Tube Cone.
1
-
-
... More
Dismantling of Draft Tube Upper and the Lower Cone.
1
-
-
... More
Installation of Bulk Head on Draft Tube Opening. Bulk head to be provided by J&K PDCL.
1
-
-
... More
Dismantling of Permanent Magnetic Generator (PMG), disconnecting and opening of Excitation Leads. Extension Shaft, Slip Rings and the Bush Rocker Assembly.
1
-
-
... More
Opening of all Oil, Water and Air and Grease Pipe lines of Turbine and Generator.
1
-
-
... More
Jacking up of the Generator Rotor assembly and locking of all the Brake/ Jack units.
1
-
-
... More
Dismantling of bearing oil coolers of all bearings, vapour seal, etc.
1
-
-
... More
Opening of Upper Guide Bearing (UGB) Pads followed by the dismantling of UGB cylinder as well.
1
-
-
... More
Dismantling of Thrust Collar assembly andThrust Mirror Disc
1
-
-
... More
Dismantling of the Shaft Seal assembly.
1
-
-
... More
Dismantling of all the Turbine Guide Bearing Pads and storing them safely.
1
-
-
... More
Dismantling of Top Air Guide / Baffles assembly.
1
-
-
... More
Dismantling of Bottom Air Guide/ Baffles, Vapour Seal, etc.
1
-
-
... More
Dismantling of Radial Jacks of Upper Bracket Assembly followed by dismantling of the Upper Bracket Assembly.
1
-
-
... More
Decoupling of Turbine Shaft and the Generator Shaft assembly.
1
-
-
... More
Lifting of Generator Rotor assembly from the Generator pit along with its Generator Shaft and placing it securely in the Service Bay.
1
-
-
... More
Dismantling of damaged Rotor Poles from the Rotor assembly.
1
-
-
... More
Dismantling of Rotor Pole Coil from its Pole assembly.
1
-
-
... More
Repair of the damaged Pole coil by brazing of the new copper strip.
1
-
-
... More
Thorough cleaning of the dismantled & repaired Pole Coil as well as its Pole Shoe assembly using a suitable cleaning agent viz MTO.
1
-
-
... More
Spray Painting of the cleaned repaired Pole Coil by Epoxy Based Red Gel Paint.
1
-
-
... More
Reassembly of the repaired Pole Coil on its Pole Shoe assembly and its packing up properly.
1
-
-
... More
Reassembly of the repaired Rotor Poles in its position on the Rotor Rim assembly after driving their Pole Keys to the proper tightness.
1
-
-
... More
Checking the Insulation Resistance of the Rotor Pole Coil assembly.
1
-
-
... More
Conducting the Impedance measurement of all the Rotor Pole Coils followed by their Polarity testing.
1
-
-
... More
Brazing the joint between the repaired Pole Coil and the Rotor Current Carrying Lead and insulating the same as per the engineered procedure.
1
-
-
... More
Conducting the Dry-Out of the Generator Rotor assembly.
1
-
-
... More
Lowering of Generator Rotor assembly in the generator pit supporting on the jacking pads.
1
-
-
... More
Lowering of Upper Bracket assembly in position with all its fasteners duly tightened.
1
-
-
... More
Re-assembly of Thrust Collar assembly on the Generator Shaft by shrunk fitting method. Checking the vertical movement of Thrust Collar assembly.
1
-
-
... More
Reassembly of Thrust Runner Disc assemblyetc.
1
-
-
... More
Checking of rotational level of Generator Shaft and correcting the same.
1
-
-
... More
Coupling of Generator and Turbine shaft flanges.
1
-
-
... More
Carrying out the combined rotational checks of the Turbine & Generator Shafts and correcting the alignment, leveling & equal load sharing of the Thrust Pads.
1
-
-
... More
Centering of the shaft and setting of Bearing clearances in UGB, LGB & TGB in a concentric manner.
1
-
-
... More
Checking of all oil pipe lines & charging of Governor.
1
-
-
... More
Boxing up all Bearings including their oil & water pipe lines.
1
-
-
... More
Complete assembly of Draft Tube Upper Cone including full tightening of all bolts.
1
-
-
... More
Complete assembly of Lower Cone with full tightening of bolts.
1
-
-
... More
Complete assembly of Adjusting Ring with full tightening of all the bolts.
1
-
-
... More
Complete assembly of Shaft Sealing system including assembly of water pipelines.
1
-
-
... More
Complete assembly of oil bath of Thrust Bearing with full tightening of bolts.
1
-
-
... More
Measurement of Insulation Resistance value of Stator and Rotor winding.
1
-
-
... More
Rendering assistance for spinning of the machine, dry out and then synchronizing/ loading of the unit.
1
-
-
... More
Rendering assistance for carrying out the Dry-out of the Generator with windage loss method till the satisfactory levels of IR & the PI values is achieved.
1
-
-
... More
Rendering assistance for Voltage build-up and subsequent synchronization of the unit followed by loading in steps.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements