Jammu And Kashmir State Industrial Development Corporation Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Jammu And Kashmir State Industrial Development Corporation - SIDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date14 Jan 2022
Closing Date22 Jan 2022
Tender Amount₹ 31,95,000
Costs
EMD
Refer DocumentsDocument Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SIDCO_156725_1Tender No
01 of 2021-22Tender Authority
Jammu And Kashmir State Industrial Development Corporation ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing & laying in position specified grade of reinforced cement concrete including cutting but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 ( 1 Cement : 1 ½ coarse sand : 3 graded stone aggregate 20mm nominal size)
3.77
-
-
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding al complete upto plinth level:
339.3
-
-
Providing & laying Damp proof course 40mm thick using cement concrete 1:2:4. (1 Cement: 2 Coarse Sand : 4 graded stone aggregate 12.5mm nominal size)
177
-
-
12mm thick Cement Plaster 1:6 (1cement : 6 coarse sand).
885
-
-
Supplying at site angle iron post and strut of required size including bottom to be split and bent at right angles in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc. complete
3098.25
-
-
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Made of G.I. wire of dia 4 mm
708
-
-
Fencing with Angle Iron Posts placed at required distance embedded in cement concrete blocks every 15 th posts last but one end post and corner post shall be strutted on both sides and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire of weighing 9.38 kg/100 mtr (min) between two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earthwork and concrete work to be paid separately). Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire.
1770
-
-
Centering and shuttering including removal of forms for foundations, footings, bases of columns etc.
1270.86
-
-
Filling available excavated earth in trenches side of foundations etc.
51.23
-
-
Clearing Jungle including uprooting of rank vegetation/grass/trees, brush wood and saplings of girth upto 30 cm at height of 1 mtr above level and removal of rubbish upto a distance of 50 mtr outside the periphery of the area cleared.
5900
-
-
Carriage of material by Mechanical Transport:
-
-
-
Carriage of Sand for 26 Km
147
-
-
Carriage of Aggregate for 23 Km
272.77
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements