Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date9 Apr 2025
Closing Date22 Apr 2025
Tender Amount₹ 33,000 
Notes
Download

Costs

Summary

Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds, Boulder Bunds, Pcc Walls, Channelization, Crates, Buildings And Other Necessary Works As And When Required Of Irrigation And Flood Control Sub-division No. Ans-i O

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
50 mtr beyond 1 m from cutting edge

1

673

673.3

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.

1

592

592.9

... More
Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- Charge. All kinds of soil.

1

187

187.3

... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.

1

741

741.05

... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :

1

256

256.85

... More
Deduct for not watering the excavated earth for banking.

1

33

33.45

... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.

1

467

467.3

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.

1

89

89.75

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m.

1

218

218.4

... More
Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Providing BA WIRE crates made from 4.00mm wire (Wires as per IS280) Machine woven both ends bent with the following meshes and nominal sectional weight.Mesh+toi(150x150+6;Sec.wtKg/sqm Size 6mx1.5m x1.5m with lids

1

5500

5500

... More
Dumping stone excluding cost of stones. In Horizontal on level

1

237

237.9

... More
Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)

1

700

700

... More
Crates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).

1

250

250

... More
Crates made of Mesh type 10x12 (D=100 mm) Zn+10% Al alloy +PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).

1

315

315

... More
Dismantling old protection work including cutting of crates and stacking of stones.

1

398

398.35

... More
Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates

1

2732

2732.7

... More
Extraction /collection and stacking of boulders within nallah pheriphery excluding all carriages

1

700

700

... More
Dry stone pitching (any thickness) excluding cost of stones.On Horizontal

1

535

535.55

... More
Dry stone pitching (any thickness) excluding cost of stones.On Slopes

1

693

693.95

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates

1

81

81.4

... More
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials

1

92

92.9

... More
Tipping stone-filled wire crates in position; including equipment charges.

1

312

312.2

... More
Loading/Unloading sand/ earth filled Geo bags (2.83 cft) in lorries; lead upto 50m.

1

4

4.95

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah

1

5402

5402.9

... More
Providing and Laying PVC Polythene of special quality(LMR)

1

45

45

... More
Supply of A4 Paper 75 GSM for sub divisional use

1

390

390

... More
Carraige of materials by Mechanical transport: Earth upto 1 km

1

160

160.93

1

184

184.3

1

207

207.3

1

229

229.48

1

250

250.92

... More
Beyond 5 Km upto 10 km /km

1

19

19.58

... More
Beyond 10 Km upto 20 km /km

1

16

16.36

... More
Beyond 20 km /every additional Km

1

13

13.8

... More
Crates upto 1 km

1

343

343.32

1

393

393.17

1

442

442.23

1

489

489.56

1

535

535.3

... More
Beyond 5 Km upto 10 km /km

1

41

41.77

... More
Beyond 10 Km upto 20 km /km

1

34

34.9

... More
Beyond 20 km /every additional Km

1

29

29.43

... More
Stone /Boulder upto 1 km

1

151

151.47

1

173

173.46

1

195

195.1

1

215

215.98

1

236

236.16

... More
Beyond 5 Km upto 10 km /km

1

18

18.43

... More
Beyond 10 Km upto 20 km /km

1

15

15.4

... More
Beyond 20 km /every additional Km

1

12

12.98

... More
40 mm & above Agregrate 1 Km

1

139

139.94

1

160

160.26

1

180

180.26

1

199

199.55

1

218

218.19

... More
Beyond 5 Km upto 10 km /km

1

17

17.03

... More
Beyond 10 Km upto 20 km /km

1

14

14.23

... More
Beyond 20 km /every additional Km

1

12

12

... More
below 40mm Aggregate 1 Km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Sand 1 km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Carraige of materials from road site to site of work by manual labour including loading , unloading and stacking (Earth for First 50mtrs)

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
stone/Boulders for first 50 mtrs

1

236

236.08

... More
for every additional 50 mtrs

1

51

51.4

... More
40 mm& above For First 50 Mtrs

1

216

216.94

... More
for every additional 50 mtrs

1

47

47.23

... More
below 40mm For First 50 Mtrs

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Sand For First 50 Mtrs

1

200

200.67

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.