Irrigation And Flood Control Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date11 Apr 2025
Closing Date19 Apr 2025
Tender Amount₹ 52,708.15 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 5,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Stage Contract For Urgent Improvement Repair /restoration Of Works For Kastigarh Canal For The Year 2025-26.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IFC_275582_9Tender No
e-NIT No 01 of 2025-26 dated 11.04.2025 64-80 dated 11.04.2025Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Stage contract for urgent Improvement Repair /Restoration of works for Kastigarh canal for the year 2025-26.
BOQ Items
... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
1
24
24.12
... More
Lettering with black Japan Paint if approved brand and manufacture per letter (Guage writing).
1
5
5
... More
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.
1
6
6.35
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
1
5733
5733.6
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
1
5202
5202.9
... More
Centering and shuttering including strutting, propping etc. and removal of form work for suspended floors, roofs, lendings, balconies and shelves.
1
718
718.2
... More
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete
1
346
346.7
... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
1
7104
7104.35
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
1
123
123.2
... More
Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)Nallah stone
1
5402
5402.9
... More
Dry random rubble masonry with hard stone in foundation and plinth:.2 Without bond stone Using nallah stone
1
2793
2793.8
... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 40mm thick with 20 mm nominal size stone aggregate.
1
510
510.25
... More
Supply of B. A wire create of size 4 x 4 of 4 mm dia wire
1
19
19
... More
Supply of HDEP pipe 160 mm including cost and all sort of carraige
1
880
880
... More
P/F of Gi union 63/50 mm Nominal bore of approved quality.
1
492
492.3
... More
Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix)
1
1725
1725.2
... More
Demolishing stone rubble masonry manually/by mechanical meansincluding stacking of serviceable material and disposal of unserviceablematerial within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
1
1740
1740.45
... More
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. Nallah stone
1
335
335.6
... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
1
1622
1622.25
... More
Dry stone pitching (any thickness) excluding cost of stones. 1 On Horizontal
1
535
535.55
... More
Dry stone pitching (any thickness) excluding cost of stones On Slopes
1
693
693.95
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones
1
371
371.15
... More
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates
1
81
81.4
... More
Dumping stone excluding cost of stones.in Horizontal on level
1
237
237.9
... More
Dumping stone excluding cost of stones. on Slopes (Behind pitching)
1
261
261.45
... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
1
7
7.8
... More
Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m.
1
4
4.95
... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
1
111
111
... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
1
184
184.95
... More
Shingle clearance from canals.
1
148
148
... More
Weed clearance From canals(including extraction of roots)
1
13
13.45
... More
Slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
1
154
154.15
... More
Slip clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
1
331
331.15
... More
Slip clearance In soils; mixed with Decomposed Rocks; by blasting or any other means
1
411
411.4
... More
Carriage of cement by H/L for 1st 50 mtr
1
116
116.22
... More
Next 50 Mtr
1
17
17.05
... More
Carriage of sand and Bajri Ist 50 Mtrs by H/L
1
200
200.67
... More
Next 50 Mtrs
1
43
43.69
... More
Carriage of stone Ist 50 Mtrs by H/L
1
236
236.08
... More
Next 50 Mtrs
1
51
51.4
... More
Carriage of steel Ist 50 Mtrs by H/L
1
249
249.61
... More
Carriage of steel for every next 50 Mtrs by H/L
1
36
36.63
... More
Carriage of stone by M/T for 1st 1 km
1
151
151.47
... More
Carriage of stone by M/T for every next 1 km
1
15
15.4
... More
Carriage of sand and bajri by M/T for 1st 1 km
1
128
128.75
... More
Carriage of sand and bajri by M/T for every next 1 km
1
13
13.09
... More
Carriage of cement by M/T for 1st 1 km
1
114
114.44
... More
Carriage of cement by M/T for every next 1 km
1
11
11.63
... More
Mason fitter first class
1
806
806
... More
Labour fitter second class
1
734
734
... More
Supply of stone
1
700
700
... More
Earthwork in excavation by mechanical hydraulic excavator means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1.5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) All kinds of soil.
1
256
256.85
... More
Cost of crates
1
5500
5500
... More
Providing and laying of PVC pipes 150mm dia.
1
550
550
... More
Providing and laying of PVC pipes 200mm dia.
1
840
840
... More
M.S. socket 150mm dia
1
205
205
... More
Clearing Jungle including uprooting of rank vegetation, grass, bruss wood, trees and saplings of girth upto 30 cm mesaured at the height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1
12
12.49
... More
Steel reinforcement for R.C.C work ready to use "cut and bend" rebars of approved make from factory/ workshop to construction site including placing in position and binding all complete above plinth level. Thermo-mechanically treated bars of grades FE500D or more.
1
116
116.25
... More
M.S. socket 200mm dia
1
265
265
... More
Carriage of crates for first 1 Km by MT
1
343
343.32
... More
Carriage of crates for every next 1 Km by MT
1
29
29.43
... More
Carriage of crates for first 50 m by HL
1
146
146.51
... More
Carriage of crates for every next 50 m by HL
1
21
21.5
... More
labour for stone shiseling, Removal of trees, boulders from canal of khuls and its surrounding
1
625
625
... More
Laying and fitting of HDEP pipes 160 mm A) Cost of pipe 160 mm to be paid as per stock rate.
1
75
75
... More
Laying and fitting of HDEP pipes 160 mm B) Cost of HDEP Collors 160mm to be paid as per stock rate.
1
50
50
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements