Irrigation And Flood Control Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date15 May 2025
Closing Soon21 May 2025
Tender Amount₹ 33,000
Costs
EMD
₹ 660Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Stage Contract For Annual Repairs And Maintenance Of Various Structures Viz Rbm Bunds, Boulder Bunds, Pcc Walls, Channelization, Crates, Buildings And Other Necessary Works As And When Required Of Irrigation And Flood Control Sub-division No. Ans-ii
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IFC_275471_9Tender No
e-NIT No. 01 of 2025-26 dated 08-04-2025Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
50 mtr beyond 1 m from cutting edge
1
673
673.3
... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
1
592
592.9
... More
Earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- Charge. All kinds of soil.
1
187
187.3
... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
1
741
741.05
... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
1
256
256.85
... More
Deduct for not watering the excavated earth for banking.
1
33
33.45
... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
1
467
467.3
... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :
All kinds of soil.
1
89
89.75
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m.
1
218
218.4
... More
Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones
1
371
371.15
... More
Providing BA WIRE crates made from 4.00mm wire (Wires as per IS280) Machine woven both ends bent with the following meshes and nominal sectional weight.Mesh+toi(150x150+6;Sec.wtKg/sqm Size 6mx1.5m x1.5m with lids
1
5500
5500
... More
Dumping stone excluding cost of stones. In Horizontal on level
1
237
237.9
... More
Stone boulder (nallah) nominal size 225 mm
(Stack measurements reduced by 15%)
1
700
700
... More
Crates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire
diameter 2.70/3.70 mm (ID/OD).
1
250
250
... More
Crates made of Mesh type 10x12 (D=100 mm) Zn+10% Al alloy +PVC
coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).
1
315
315
... More
Dismantling old protection work including cutting of crates and stacking
of stones.
1
398
398.35
... More
Constructing vertical bunds with sloping faces, by boulder filling (dry,
hand packed tightly); including cost of stones but excluding cost of wirecrates
1
2732
2732.7
... More
Extraction /collection and stacking of boulders within nallah pheriphery excluding all carriages
1
700
700
... More
Dry stone pitching (any thickness) excluding cost of stones.On Horizontal
1
535
535.55
... More
Dry stone pitching (any thickness) excluding cost of stones.On Slopes
1
693
693.95
... More
Opening out old wire crates those and re-binding after filling.
1
35
35.6
... More
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m
height for hand-packing of stones in wire-crates
1
81
81.4
... More
Making knitted wire crates of approved mesh-size; including weaving,
binding sides and partitions, and binding top after filling; excluding cost
of filling, stones and weaving materials
1
92
92.9
... More
Tipping stone-filled wire crates in position; including equipment
charges.
1
312
312.2
... More
Loading/Unloading sand/ earth filled Geo bags (2.83 cft) in lorries; lead upto 50m.
1
4
4.95
... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah
1
5402
5402.9
... More
Providing and Laying PVC Polythene of special quality(LMR)
1
45
45
... More
Supply of A4 Paper 75 GSM for sub divisional use
1
390
390
... More
Carraige of materials by Mechanical transport: Earth upto 1 km
1
160
160.93
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%