Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date17 Apr 2024
Closing Soon24 Apr 2025
Tender Amount₹ 26,00,000 
Notes
Download

Costs

Summary

Annual Maintenance Repairs And Other Emergent Works Of Various Water Supply Schemes Including All Headworks Raw Water Mains Supply Mains Sub Mains And Distributions System Under Jurisdiction Of Phe Sub Division Tangmarg Fbi Division Tangmarg

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary rock

1

392

392.8

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :

1

592

592.9

... More
Ordinary Rock

1

940

940.3

... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil

1

256

256.85

... More
Ordinary rock

1

493

493.5

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.

1

24

24.12

... More
Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge

1

65

65.9

... More
Laying and fitting of G.I/Q.C pipes (all classes) complete excluding cost of pipes, fittings and Earth work.100 mm dia GI pipes

1

118

118.45

... More
80 mm dia GI pipes

1

80

80.3

... More
65 mm dia GI pipes

1

80

80.3

... More
50 mm dia GI pipes

1

44

44.85

... More
40 mm dia GI pipes

1

44

44.85

... More
25 mm dia GI pipes

1

33

33.7

... More
20 mm dia GI pipes

1

22

22.25

... More
Q.C Pipes (New/Retreived for 50 mm dia incl. carriage)

1

30

30

... More
50 mm dia excl carriage

1

25

25

... More
65 mm dia incl. carrriage

1

45

45

... More
65 mm dia excl. carriage

1

40

40

... More
76.4 mm dia incl. carriage

1

65

65

... More
76.4 mm dia excl. carriage

1

50

50

... More
101.2 mm dia incl. carrriage

1

80

80

... More
101.2 mm dia excl. carriage

1

65

65

... More
152.4 mm dia incl. carriage

1

85

85

... More
152.4 mm dia excl. carriage

1

70

70

... More
202.4 mm dia incl. carriage

1

90

90

... More
202.4 mm dia excl. carriage

1

75

75

... More
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work)15 mm dia nominal bore light

1

179

179.2

... More
20 mm dia nominal bore light

1

227

227.9

... More
25 mm dia nominal bore light

1

311

311.95

... More
32 mm dia nominal bore light

1

384

384

... More
40 mm dia nominal bore light

1

434

434.65

... More
50 mm dia nominal bore light

1

532

532.8

... More
65 mm dia nominal bore light

1

745

745.1

... More
80 mm dia nominal bore light

1

878

878.25

... More
100 mm dia nominal bore light

1

1255

1255.15

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations

1

1622

1622.25

... More
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank

1

8

8.75

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Dismantling G.I./D.I pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :Above 40 mm nominal bore

1

121

121.65

... More
15 - 40 mm nominal bore

1

109

109.65

... More
Laying in position centrifugally cast (spun) iron S&S or flanged pipes (excluding cost of pipe)

1

270

270.1

... More
Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket. 100 mm dia pipes

1

94

94.8

... More
150 mm dia pipes

1

150

150.35

... More
200 mm dia pipes

1

221

221.9

... More
250 mm dia pipes

1

270

270.65

... More
300 mm dia pipes

1

346

346.2

... More
Stabilization of existing system by way of rectification of leakages from the damaged sockete joints including earth work in excavation ,dewatering ,spun yarn ,refilling with all carriages and head load upto actual site all complete From 15 mm upto 40 mm nominal dia

1

300

300

... More
From 50 mm upto 125mm nominal dia and

1

500

500

... More
Dismantling of spindle / rod and check nuts of flanged type sluice valves by way of manufacturing of new spindle / rod made out of mild steel & new check nut made out of gun metal material. The job includes dismantling of sluice valve reassembling after fixing of spindle & check nut duly manufactures and threaded in workshop including cost of welding, packing, carriage to & fro upto the workshop and back to site of work (Complete job) from 100 mm dia sluice valve upto 350 mm dia sluice valve including cost of salvaged material.

1

6000

6000

... More
Providing and fixing ISI Mark of approved double flanged sluice valve incl. tail pieces incl. all carriages upto site of work 200 mm sluice valve

1

31698

31698

... More
150 mm

1

20243

20243

... More
125 mm

1

15961

15961

... More
100 mm

1

13164

13164

... More
Dismantling of spindle / rod and check nuts of flanged type sluice valves by way of manufacturing of new spindle / rod made out of mild steel only . The job includes dismantling of sluice valve reassembling after fixing of spindle & check nut duly manufactures and threaded in workshop including cost of welding, packing, carriage to & fro upto the workshop and back to site of work (Complete job) from 100 mm dia sluice valve upto 350 mm dia sluice valve including cost of salvaged material.

1

3500

3500

... More
Dismantling of spindle / rod and check nuts of flanged type sluice valves by way of manufacturing of new check nut made out of gun metal material. The job includes dismantling of sluice valve reassembling after fixing of spindle & check nut duly manufactures and threaded in workshop including cost of welding, packing, carriage to & fro upto the workshop and back to site of work (Complete job) from 100 mm dia sluice valve upto 350 mm dia sluice valve including cost of salvaged material..

1

2400

2400

... More
Decamping of main cable at Filtration Plants from LT poles, cutting of main cable by Hexa blades, providing / fixing of bone china insulators, thimbles, cost of PVC tape rolls, fuse wire, engagement of skilled/ non skilled labours, cost of rope, hire charges of long stair etc. complete job

1

2500

2500

... More
Providing / fixing of M.S double collers/ arresting of leakages by way of welding including all sorts of carriages 1.00 metre in length80 mm dia

1

1650

1650

... More
100 mm dia

1

2250

2250

... More
150 mm dia

1

2375

2375

... More
200 mm dia

1

2600

2600

... More
Providing / fixing of double collers, G.I./ M.S. for rectification of leakages by using spun yarn incld. earthwork excavation,dewatering, refilling etc. including testing of joint all sorts of carriages (length verying from 0.60 to 1 Mtr.) 40 mm dia

1

1800

1800

... More
50 mm dia

1

2300

2300

... More
65 mm dia

1

2500

2500

... More
80 mm dia

1

2900

2900

... More
100 mm dia

1

4000

4000

... More
150 mm dia

1

5000

5000

... More
200 mm dia

1

6500

6500

... More
Providing and fixing including testing, commissioning & fabricating at site M.S pipe Specials incld. M.S flanges made out of 4 to 6mm mm thick M.S sheet including cost of flanges 12/10mm thick Nuts, Bolts, washers , earth work, dewatering and testing etc & all sorts of carriages upto site of work, as per requirement at site complete job.

1

165

165

... More
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)

1

7275

7275.25

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)

1

9106

9106.5

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

7564

7564.8

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses , plinth and string courses, fillets, columns, pillars, piers, abutments, posts andstruts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

9395

9395.7

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

9821

9821.85

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms.

1

718

718.2

... More
Lintel, beams, plinth beams, girders, bressumers and cantilevers.

1

577

577.55

... More
Columns, pillars, piers, abutments, posts and struts.

1

742

742.55

... More
Stairs (excluding landings) except spiral staircases.

1

851

851.15

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more

1

123

123.2

... More
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead.

1

38

38.9

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In lime mortar

1

820

820.4

... More
In cement mortar

1

1740

1740.45

... More
12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand)

1

283

283.8

... More
1 : 6 ( 1 cement : 6 fine sand)

1

266

266.2

... More
12mm Cement plaster finished with a floating coat of neat cement of mix:1 : 3 ( 1 cement : 3 fine sand)

1

370

370.75

... More
1 : 4 ( 1 cement : 4 fine sand)

1

353

353.1

... More
Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement)

1

67

67

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

1455

1455.65

... More
Providing and fixing German Pine wood wall panelling 12 mm thick tongued incl. base making of wooden frames with necessary screws etc. complete job

1

2500

2500

... More
Repair to office furmiture chairs by way of replacing damaged parts incl. replacement of seat cushion and back with 50 mm thick cushion and covered with cloth and other allied charges

1

900

900

... More
Providing and fixing of Ply boards complete job incl. all carriages 18 mm

1

70

70

1

80

80

1

45

45

1

30

30

... More
Providing and fixing of Electrical points (heating and lighting) incld. cost of wire switches, necessary MCB’s switch boards, ceiling roses reputed make ISI mark screws, casing / conduit materials of allsorts of carriage and labour charges required for the job. Lighting points

1

1000

1000

... More
Heating points

1

1500

1500

... More
Supply/ fixing of pipe specials from open market, if not available in the Divisional stores of ISI marked standard make. 100 mm dia G.I Union

1

900

900

... More
80 mm dia G.I Union

1

850

850

... More
65 mm dia G.I. Union

1

800

800

... More
50 mm dia G.I. Union

1

700

700

... More
40 mm dia G.I. Union

1

600

600

... More
25 mm dia G.I. Union

1

250

250

... More
20 mm dia G.I. Union

1

160

160

... More
80 mm dia G.I. Elbow

1

390

390

... More
65 mm dia G.I. Elbow

1

310

310

... More
50 mm dia G.I. Elbow

1

230

230

... More
40 mm dia G.I. Elbow

1

175

175

... More
25 mm dia G.I. Elbow

1

120

120

... More
20 mm dia G.I. Elbow

1

80

80

... More
80 mm dia G.I. Socket

1

200

200

... More
65 mm dia G.I. Socket

1

180

180

... More
50 mm dia G.I. Socket

1

140

140

... More
40 mm dia G.I. Socket

1

100

100

... More
25 mm dia G.I. Socket

1

65

65

... More
20 mm dia G.I. Socket

1

45

45

... More
80 mm dia G.I. Nipple upto 10"

1

170

170

... More
65 mm dia G.I. Nipple upto 10"

1

150

150

... More
50 mm dia G.I. Nipple upto 10"

1

150

150

... More
40 mm dia G.I. Nipple upto 10"

1

130

130

... More
25 mm dia G.I. Nipple upto 10"

1

100

100

... More
20 mm dia G.I. Nipple upto 10"

1

75

75

... More
15 mm dia G.I. Nipple upto 10"

1

40

40

... More
25x25x20 mm dia G.I. Equal Tee

1

100

100

... More
40x40x25 mm dia G.I. Equal Tee

1

135

135

... More
50x50x40 mm dia G.I. Equal Tee

1

200

200

... More
65x65x50 mm dia G.I. Equal Tee

1

250

250

... More
80x80x65 mm dia G.I. Equal Tee

1

280

280

... More
25x20 mm dia Socket/ Reducer

1

70

70

... More
40x25 mm dia Socket/ Reducer

1

120

120

... More
50x40 mm dia Socket/ Reducer

1

140

140

... More
65x50 mm dia Socket/ Reducer

1

156

156

... More
80x65 mm dia Socket/ Reducer

1

154

154

... More
25x20 mm dia Elbow/ Reducer

1

80

80

... More
40x25 mm dia Elbow/ Reducer

1

130

130

... More
50x40 mm dia Elbow/ Reducer

1

200

200

... More
65x50 mm dia Elbow/ Reducer

1

250

250

... More
80x65 mm dia Elbow/ Reducer

1

300

300

... More
100mm dia Elbow

1

650

650

... More
100mm dia Equal Tee

1

750

750

... More
100 mm dia G.I. Bend

1

1200

1200

... More
80 mm dia G.I. Bend

1

750

750

... More
65 mm dia G.I. Bend

1

650

650

... More
50 mm dia G.I. Bend

1

500

500

... More
40 mm dia G.I. Bend

1

400

400

... More
Supply of Kerosene

1

80

80

... More
Re-threading of damaged pipe ends including carriage from site to workshop and back. 20 mm dia

1

30

30

... More
25 mm dia

1

35

35

... More
40 mm dia

1

40

40

... More
50 mm dia

1

50

50

... More
65 mm dia

1

65

65

... More
80 mm dia

1

80

80

... More
Dismentalling of backwash motors/ Alum motors/ bleaching motors of filtration plants by way of rewinding of core made out of copper metal fiber superior type of required thickness and guage. The job includes replacing of bearings, water seal, nuts, bolts, rubber washers and painting of instruments. The job also includes all sorts of carriage from site to work upto workshop to & fro including testing & commissioning of following capacity. For 0.50 HP to 2.00 HP

1

3300

3300

... More
For 3.00 HP to 5.00 HP

1

7300

7300

... More
For 5.00 HP to 10.00 HP

1

11500

11500

... More
Dismentalling of complete reduction gear unit of de-sludge bridges for repairs by way of providing & manufacuring of complete reduction gear with hub. The job includes costing of brass material, grinding & finishing of virme in order to make the new teeth, replacement of damaged oil seals by way of new one, replacemnet of ball bearings, pouring of required specific gravity ear oil in order to run the reduction gear in smooth order, refixing of same at the site of work incld. all sorts of carriage fro site of work upto workshop and back to site of work including testing & successful commissioning (complete job)

1

10000

10000

... More
Hire charges of commercial vehicle including POL alongwith comercial driver licensed.upto 60 Km per day

1

1800

1800

... More
Beyond 60 km upto 120 Km per day

1

2500

2500

... More
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.

1

14

14.5

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works

1

53

53.6

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel work (second coat)

1

28

28.85

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work

1

131

131.85

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

1

194

194.65

... More
Overhauling voltage stabilizers installed at site. The job includes pouring / filling of transformer oil of required specified gravity, replacement of driven rotars (automatic), replacement of voltage meters, Amp meters, indicators, thimbles etc. complete job, making the unit complete functional for bearing of required load. The job also includes labour charges, cost of wiring, pin sockets and all sorts of carriages from site of work upto the workshop & back to actual site of work incld. installation at site & testing, successful commissioning complete job. 5 KV to 10 KV

1

8000

8000

... More
11 KV to 20 KV

1

10000

10000

... More
21 KV to 30 KV

1

15000

15000

... More
Desilting of various structures incld. Disposal of desilted material from site premises with all carriages lead & lifts etc. The job also includes, washing and cleaning of walls, beds, drains and floor etc with bleaching powder solution complete job.

1

300

300

... More
Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 25 to 40 mm nominal bore

1

730

730.25

... More
50 to 80 mm nominal bore

1

1387

1387.25

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Replacement / supply of PVC gate valves for bleaching / alum tanks/ Foot valves and PVC pipes of ISI marked standard make. 20 mm dia Gate valve

1

300

300

... More
25 mm dia Gate valve

1

450

450

... More
32 mm dia Gate valve

1

650

650

... More
40 mm dia Gate valve

1

850

850

... More
50 mm dia Gate valve

1

1000

1000

... More
20 mm dia PVC pipe (B-class)

1

90

90

... More
25 mm dia PVC pipe (B-class)

1

100

100

... More
32 mm dia PVC pipe (B-class)

1

150

150

... More
40 mm dia PVC pipe (B-class)

1

160

160

... More
50 mm dia PVC pipe (B-class)

1

180

180

... More
80 mm dia PVC pipe (B-class)

1

300

300

... More
100 mm dia PVC pipe (B-class)

1

350

350

... More
Replacement of old damaged G.I. Gate valves/ Sluice valve by providing / fixing of new Gate valves/ Sluice valve including cost of nuts, bolts, rubber insulations of ISI marked standard make all carriages upto site of works, complete .100 mm dia Gate valve

1

4000

4000

... More
80 mm dia Gate valve

1

3000

3000

... More
65 mm dia Gate valve

1

2500

2500

... More
50 mm dia Gate valve

1

2000

2000

... More
40 mm dia Gate valve

1

1500

1500

... More
25 mm dia Gate valve

1

1000

1000

... More
20 mm dia Gate valve

1

800

800

... More
300 mm dia Sluice valve

1

30000

30000

... More
250 mm dia Sluice valve

1

24000

24000

... More
200 mm dia Sluice valve

1

20000

20000

... More
150 mm dia Sluice valve

1

18000

18000

... More
100 mm dia Sluice valve

1

16000

16000

... More
80 mm dia Sluice valve

1

10000

10000

... More
65 mm dia Sluice valve

1

6000

6000

... More
50 mm dia Sluice valve

1

5500

5500

... More
Supply of CFL Bulbs for filtration plant sites etc.20W CFL

1

300

300

... More
15W CFL

1

250

250

... More
12W CFL

1

200

200

... More
9W CFL

1

150

150

... More
Welding, including transportation of plant at site etc. complete By gas plant

1

12

12.85

... More
By electric plant

1

6

6.15

... More
Providing / fixing of M.S. step collers from 100 mm to 450 mm dia including earthwork excavation, refilling, dewatering etc. including all sorts of carriages, head load with fixtures and fasteners all complete

1

180

180

... More
Cutting road and making good the same including supply of extra quantities of material i.e. crushed aggregate, moorum screening, red bajri and labour required. BItuminous portion

1

2500

2500

... More
water bound macadam

1

2236

2236.2

... More
Renewing glass panes and re-fixing existing wooden fillets: Float glass panes of thickness 4.0 mm (weight not less than 10kg/sqm)

1

1407

1407.05

... More
Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same in- All kinds of soil.

1

24

24.52

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

120

120.8

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

138

138.2

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

1

181

181.6

... More
Supply of unskilled labours

1

500

500

... More
Supply of skilled labour

1

600

600

... More
Providing and Fixing of M.C.C.B.of ISI marked standard make the job includes dismantling of damaged/non functional Amp. M.C.C.B. and fixing of new one including all sorts carriage from source to workshop including carriages of salvaged material from filtration plant upto Divisional Stores including testing, installing and commissioning complete job 03 Pole 200 Amp.

1

2700

2700

... More
03 Pole 100 Amp.

1

2500

2500

... More
04 Pole 100 Amp.

1

2200

2200

... More
04 Pole 32 Amp.

1

2700

2700

... More
Providing and Fixing of 5-10 H.P. Starter of of ISI marked standard Make, the job includes dismantling of damaged /non functional starter and fixing of new one incl. all sorts of carriages from source to workshop including carriages of salvaged materials from filtration plant upto Divisional Stores, including testing, installing and commissioning complete job.

1

4500

4500

... More
Providing and Fixing of running V-Belt of groove type for air blower, the job includes dismantling damages ones and fixing of new ones incl. successful testing, commissioning. All types of carriage complete

1

1200

1200

... More
Providing fixing & commissioning of LED Flood Lights of 50 Watts with stand including all accessories required at site complete job inclusive all carriages.

1

1700

1700

... More
Providing fixing & commissioning of LED Flood Lights of 30 Watts with stand including all accessories required at site complete job inclusive all carriages.

1

1500

1500

... More
Providing fixing & commissioning of LED Flood Lights of 15 Watts with stand including all accessories required at site complete job

1

1000

1000

... More
Providing fixing & commissioning of 10/12 mm thick Flanges in pairs including welding, cutting of threaded portion, washers including cost of Flanges with Nuts and Bolts including making joint leak proof including all sorts of labours whatsoever required 400mm dia

1

4000

4000

... More
350mm dia

1

3500

3500

... More
300mm dia

1

3200

3200

... More
250mm dia

1

3000

3000

... More
200mm dia

1

2500

2500

... More
150mm dia

1

1800

1800

... More
100mm dia

1

1500

1500

... More
80mm dia

1

1200

1200

... More
65mm dia

1

1000

1000

... More
50mm dia

1

850

850

... More
40mm dia

1

600

600

... More
Restoration of damaged pipes due to frost / frozen including earth works excavation /dismantling /refilling / making good the same complete job in all respects. Upto 20mm to 100mm dia (by using blue lamp including cost of K.oil)

1

50

50

... More
P/F of Air Releasing Valves (single acting) including cutting of bore hole , welding of the pedestal rod and providing laying of cement concrete 1:3:6 mix with shuttering box PGI 9”X9”x12” around the pedestal rod with all carriages and head load upto actual site of work25mm dia Air Valve

1

4000

4000

... More
20mm dia Air Valve

1

3500

3500

... More
Double acting 50mm air valve

1

8500

8500

... More
80mm air valve

1

9500

9500

... More
Laying & fixing of HDPE Pipes complete excluding earth work, but including all carriages upto site of work 25mm dia

1

4

4

... More
32mm dia

1

5

5

... More
50mm dia

1

7

7

... More
110mm dia

1

10

10

... More
125mm dia

1

15

15

... More
Fixing charges of Sluice Valves including Testing, Commissioning and carriages from divisional store to actual site of work including dismantling of old (in case of replacement) and carriage of same to divisional store, Complete job200 mm dia

1

2000

2000

... More
150 mm dia

1

1800

1800

... More
100mm dia

1

1700

1700

... More
80mm dia

1

1500

1500

... More
50mm dia

1

1000

1000

... More
Hire charges of JCB incl. fuel, driver and crawling charges etc., complete job (idle charges)

1

800

800

... More
Hire charges of JCB incl. fuel, driver and crawling charges etc., complete job (running charges)

1

1450

1450

... More
Hire charges of Load carrier incl. fuel, driver and crawling charges etc., complete job (idle charges)

1

200

200

... More
Supplying and Laying of polythene sheets (Black) at off take points during lean dscharge / Freezing

1

50

50

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Filling empty cement bags with sand/ earth including cost of bags and earth / sand (Earth or sand to be locally excavated) including all sorts of carriages upto actual site of work

1

50

50

... More
Slip clearance in ordinary soils disposal lead upto 50 m and lift upto 1.5 m

1

154

154.15

... More
Silp clearance in soils; mixed with moorum/ Kankar/ shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m

1

331

331.15

... More
Supplying Laying of filter media as per specifications including all carriages

1

6000

6000

... More
Removing, washing of old filter media including washing of filter beds and laying of same in position complete job.

1

400

400

... More
Supplying & fixing as per site requirement of Nylon rope on 10 mm dia of Standartd make including all carriages comp job

1

12

12

... More
Repairing of Damaged 100KVA / 63 KVA oil filled transformers installed at site including replacement of worn out / damaged accessories. The job also includes Skilled / unskilled labour charges and all sorts of carriages from site of work upto the workshop & back to actual site of work including uninstallation & installation at site & testing, successful commissioning complete job

1

15000

15000

... More
Providing and fixing including all sorts of carriages complete :-HV Coils

1

380

380

... More
LV Coils

1

410

410

... More
Lethoride Paper

1

240

240

... More
HT Insulation Paper

1

220

220

... More
Hard Card Board

1

86

86

... More
Glass Sleeves

1

20

20

... More
Fiber Tubes

1

19

19

... More
LT Bush Rods

1

185

185

... More
HT Bush Rods

1

215

215

... More
HT Bush

1

173

173

... More
LT Bush

1

39

39

... More
AI Thimble

1

65

65

... More
Cotton tape/ Nawar

1

80

80

... More
cork washers

1

20

20

... More
Oil Seals

1

12

12

... More
Cork Sheet

1

395

395

... More
Insulating gum

1

120

120

... More
Nuts & bolts

1

140

140

1

125

125

... More
Clamps

1

210

210

... More
Insulated cable 10mm ( Service line)

1

60

60

... More
Insulated cable 16mm ( Service line)

1

95

95

... More
Providing and fixing of 11 kv Bush Rod with insulator complete.

1

650

650

... More
Providing and fixing of LT Bush Rod with insulator complete.

1

600

600

... More
Providing and fixing of HT 3-core 35-50 mm cable termination kit along with other vallied works ,complete job

1

6000

6000

... More
Providing and fixing of HT AB 35-50 mm cable termination kit along with other vallied works ,complete job

1

5500

5500

... More
Providing and fixing of HT 3-core 35-50 mm Straight Through kit along with other vallied works ,complete job

1

14500

14500

... More
Providing and fixing of HT AB 35-50 mm Straight through kit along with other vallied works ,complete job

1

13000

13000

... More
Providing and fixing of 11 kv linkset complete job

1

5500

5500

... More
Providing and fixing of 11 kv dropout set inluding of connectimg fuse etc,complete

1

5500

5500

... More
Providing and fixing of 11 kv polymer type pin insulator,complete det

1

450

450

... More
Dismantling of spindle / rod and check nuts of flanged type sluice valves by way of manufacturing of new spindle / rod made out of mild steel & new check nut made out of gun metal material. The job includes dismantling of sluice valve reassembling after fixing of spindle & check nut duly manufactures and threaded in workshop including cost of welding, packing, carriage to & fro upto the workshop and back to site of work (Complete job) from 50 mm dia sluice valve upto 80 mm dia sluice valve including cost of salvaged material.

1

3000

3000

... More
Dismantling of spindle / rod and check nuts of flanged type sluice valves by way of manufacturing of new spindle / rod made out of mild steel only . The job includes dismantling of sluice valve reassembling after fixing of spindle & check nut duly manufactures and threaded in workshop including cost of welding, packing, carriage to & fro upto the workshop and back to site of work (Complete job) from 100 mm dia sluice valve upto 150 mm dia sluice valve including cost of salvaged material.

1

4500

4500

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing of refreshment during winter for the staff to be deployed for clearance of snow for smooth running of water supply to the genral public which comprises of morning and everning tea with local bread and lunch and dinner (once in a week chiken and mutton).

1

400

400

... More
Carriage of chemicals from Divisional store to various plant sites by mechanical transport including head load, loading, unloading and stacking complete under the jurisdiction of PHE Sub Division Tangmarg

1

150

150

... More
Providing / fixing of slip ring complete set with cliffs, bushes all accessories for clarifloculator bridge. The job includes disassembling of the damaged slipring returned back to store and fixing of new one, including all carriages.

1

7500

7500

... More
POL Charges for hired vehicles including the POL to be used for heating and lighting system in divisional office and departmental Huts Diesel

1

90

90

... More
Petrol

1

100

100

... More
Supply of Salt for de-freezing H/W ,bwls, chemicals etc

1

1500

1500

... More
Welding charges of leaking Spots/ Sockets /Tee's/Bends forD.I/MS/ G.I Pipes including carriage of welding machine & D.G Set upto site of work including H/L including steel strips etc complete job, excluding excavation for making the leaking spot leak proof 150mm dia G.I Pipes (Two sides of Socket)

1

1400

1400

... More
100mm dia G.I Pipes (Two sides of Socket)

1

1200

1200

... More
80mm dia G.I Pipes (Two sides of Socket)

1

1000

1000

... More
65mm dia G.I Pipes (Two sides of Socket)

1

900

900

... More
50mm dia G.I Pipes (Two sides of Socket)

1

700

700

... More
40mm dia G.I Pipes (Two sides of Socket)

1

600

600

... More
25mm dia G.I Pipes (Two sides of Socket)

1

500

500

... More
20mm dia G.I Pipes (Two sides of Socket)

1

500

500

... More
300 mm dia MS

1

2700

2700

... More
250mm dia MS

1

2500

2500

... More
200 mm dia MS

1

2000

2000

... More
100mm dia DI

1

800

800

... More
150mm dia DI

1

1000

1000

... More
200 mm dia DI

1

1200

1200

... More
250mm dia DI

1

1500

1500

... More
300mm dia DI

1

2000

2000

... More
Hire charges of water tanker to combat during emergency /drought/floods etc including charges of driver/conductor and including Break down charges if POL will be paid seperatley as per the mileage of vehicle and actual mileage travelled during the hire period at the rates in vogue at the time of engagement of the vehicle .Actual mileage run by the vehicle will be monitored / verified by Asstt .Executive Engineer concerned . 3000 Lit Capacity

1

2200

2200

... More
6000 Lit Capacity

1

2500

2500

... More
7000 Lit capacity

1

5000

5000

... More
9000Lit capacity

1

6000

6000

... More
12000 Lit capacity

1

7000

7000

... More
Hire charges of Sumo/ Scarpio including charges of driver , break down charges , POL charges will be paid separtley as per the mileage of vehicle and actual mileage travelled during the hire period at the rates in vogue at the time of engagement of the vehicle .Actual mileage run by the vehicle will be monitored and verified by Asstt .Executive Engineer concerned .

1

2000

2000

... More
Hire charges of Sumo / Scarpio mounted with loud speaker including charges of driver , loud speaker , break down charges , POL charges will be paid separtely as per the mileage of vehicle and actual mileage travelled during the hire period at the rates in vogue at the time of engagement of the vehicle .Actual mileage run by the vehicle will be monitored and verified by Asstt .Executive Engineer concerned .

1

2500

2500

... More
Hire charges of tipper of 13.50 Ton capacity including charges of driver /conducter /Break down charges POL charges will be paid separtely as per the mileage of vehicle and actual mileage travelled during the hire period at the rates in vogue at the time of engagement of the vehicle .Actual mileage run by the vehicle will be monitored and verified by Asstt .Executive Engineer concerned .

1

4000

4000

... More
Hire charges of TATA Mobile of 1.5 Ton Capacity including charges of driver/ Conducter and Break down charges, POL charges will be paid separtley as per the mileage of vehicle and actual mileage travelled during the hire period at the rates in vogue at the time of engagement of the vehicle .Actual mileage run by the vehicle will be monitored and verified by Asstt .Executive Engineer concerned .

1

2000

2000

... More
Providing /fixing of crewel flower carved fency type curtains of double woven cloth standard size (Do soot fabric) with white back lining of white clour of standard material including all fixtures like hooks/ring/rods curtain rocd etc (complete job) as approved by Engineer incharge

1

500

500

... More
Bed sheet's for Double Bed (White ) as approved by Engineer incharge

1

500

500

... More
Bed Cover for Double Bed (fency type) as approved by Engineer incharge

1

1000

1000

... More
Sofa Cover for full set of 3 seates + 2 sealr+ one seats) as approved by Engineer incharge

1

2000

2000

... More
Quilt for Winter standard Brand as approved by Engineer incharge

1

1500

1500

... More
Matress (Size standrad as approved by Engineer incharge

1

2000

2000

... More
Table cloth(White )standard Brand as approved by Engineer incharge

1

500

500

... More
Providing fixing of standard quality washbasin (white clour ) with pedastal including all carriages upto site of work (complete job) as approved by Engineer incharge

1

2000

2000

... More
Providing of Table(wall net) 2.5'x4'(2 Nos with glasstop with wood carrving as approved by Engineer incharge

1

3000

3000

... More
Wooden Tea poy standard size as approved by Engineer incharge

1

500

500

... More
Providing of standard quality fire wood bukharies (to be used on higher reaches) as approved by Engineer incharge

1

1200

1200

... More
Emergent repairs to Tanker Tyri Puncture

1

150

150

... More
Self repairs/Clutch repairs

1

1500

1500

... More
Side mirror (New ones)

1

200

200

... More
Suction pipe

1

300

300

... More
Providing and fixing of standard quality 50 liter capasity electric geyser with all the aceassarioes (complete job) as approved by site Engineer

1

10000

10000

... More
Hand packing boulders into wire crates including cost of boulder and crates create mesh of size 4'x4' of 4mm dia BA wire including all carriages complete job .

1

2000

2000

... More
Providing and fixing Budloo eaves boading complete including dismentling of existing damaged eves boarding including of all carriages leads and lifts upto site of work including cost of nuts bolts, nails etc 250x25mm

1

450

450

... More
300x25mm

1

500

500

... More
Supply of winter uniform for employees working in higher reaches incl. socks,trousers with fur, sweater, cap, gloves and jacket with fur of approved brand complete job as per direction of Engineer incharge including all carriages upto divisional store.

1

4000

4000

... More
Supply of ankle height shoes with fur of all sizes complete job as per the direction of Engineer incharge incl. all carriages upto site of work

1

1500

1500

... More
Supply and filling of Nallah Muck including all carriages complete job

1

1000

1000

... More
Unloading and stacking of GI (IDI,MS pipe etc Below 100 mm dia

1

18

18

... More
100 mm dia

1

3

3.95

... More
125mm dia

1

4

4.84

... More
150mm dia

1

5

5.57

... More
200mm dia

1

8

8.37

... More
250mm dia

1

14

14.71

... More
300 mm dia

1

18

18.44

... More
350mm dia

1

26

26.32

... More
400 mm dia

1

30

30.63

... More
400 mm dia & 500mm dia

1

40

40.84

... More
Above 50mm dia

1

44

44.93

... More
Supply and stacking of good earth at site including royalty (earth measured in stacking will be reduced by 20% for payment .

1

281

281.3

... More
Supply of Blankets single woven

1

500

500

... More
Double woven

1

1000

1000

... More
Shovels

1

300

300

... More
Steel Jabels

1

200

200

... More
Rain Coats

1

1000

1000

... More
Long boots

1

600

600

... More
Spun Yarn

1

70

70

... More
Chain tongue

1

1500

1500

... More
Pipe culter/Hexx frames

1

1000

1000

... More
Blow Lamps

1

800

800

... More
Ands Light

1

1000

1000

... More
Torches

1

150

150

... More
Hiking tents on hiring basis of standard quality per day

1

500

500

... More
Pick Axes

1

250

250

... More
P/L of DI Machine made tail piece specials of 250 mm dia one end collar and other end flanged incl. nuts and bolts, fixing charges, welding charges and all types of transport charges complete job as directed by Engineer in charge

1

6000

6000

... More
P/L of DI Machine made tail piece specials of 200 mm dia one end collar and other end flanged incl. nuts and bolts, fixing charges, welding charges and all types of transport charges complete job as directed by Engineer in charge

1

4500

4500

... More
P/L of DI Machine made tail piece specials of 150 mm dia one end collar and other end flanged incl. nuts and bolts, fixing charges, welding charges and all types of transport charges complete job as directed by Engineer in charge

1

4000

4000

... More
P/L of DI Machine made tail piece specials of 125 mm dia one end collar and other end flanged incl. nuts and bolts, fixing charges, welding charges and all types of transport charges complete job as directed by Engineer in charge

1

3500

3500

... More
P/L of DI Machine made tail piece specials of 100 mm dia one end collar and other end flanged incl. nuts and bolts, fixing charges, welding charges and all types of transport charges complete job as directed by Engineer in charge

1

3300

3300

... More
P/F of DI Pipe specials of class K12 suitable for push on jointing upto 600 mm dia

1

171

171.02

... More
Refreshment of participants in events/functions comprising of water bootle(500ml), 2No. Bananas, 200 ml Juice tin, 1 No. Biscuit packet

1

100

100

... More
Providing Tea/Kehwa with shirmal/traditional bread to field staff/participants

1

40

40

... More
P/F MS Rippats for DI/GI pipes all complete job

1

1000

1000

... More
Supplying of heavy duty cushion chairs of approved brand and quality as directed by Engineer incharge

1

1800

1800

... More
Engagement of folk dancers minimum 6 Nos (band pather, cultural programmes) on various ocassions i.e., 15th August, 26th January or as when required incl. to and fro transportation/refreshment charges.

1

18000

18000

... More
Hiring charges of tractor fixed with tank (for a capacity from 2000-3000 litres) to counter water scarcity incl. POL Charges

1

1200

1200

... More
P/F of 7/20 copper wire 4 sqmm in size

1

50

50

... More
Hand packing boulders into wire crates including collection of boulder and cost of crates crates create mesh of size 4'x4' of 4mm dia BA wire including all carriages complete job .

1

1500

1500

... More
Supply of DUCKBACK raincoat with FBI Logo incl. carriages upto divisional store

1

500

500

... More
Supply of long gum boots Duck Back incl. all carriages upto Divisional store

1

400

400

... More
Supply of Duck Back waterproof gloves with fur with FBI Logo incl. all carriages upto divisional store

1

200

200

... More
Hire charges of water pumping motor of 2 H.P

1

250

250

... More
Supply of A4 Paper GSM for sub-divisional use

1

400

400

... More
Supply of A5 Paper GSM for sub-divisional use

1

500

500

... More
Supply of ink all colors for printer

1

3000

3000

... More
Repair charges of all type of printers

1

2000

2000

... More
Carriage of materials by MT GI,CI.AC including loading and stacking 1 km ( below 100mm dia)

1

114

114.44

1

131

131.06

1

147

147.41

1

163

163.19

1

178

178.43

... More
Beyound 5 km up to 10 km/km

1

13

13.92

... More
Beyound 10 km up to 20 km/km

1

11

11.63

... More
Beyound 20 km /every add.km

1

9

9.81

... More
1 km ( 100mm dia)

1

2

2.81

1

3

3.22

1

3

3.62

1

4

4.01

1

4

4.38

... More
Beyound 5 km up to 10 km/km

1

-

0.34

... More
Beyound 10 km up to 20 km/km

1

-

0.28

... More
Beyound 20 km /every add.km

1

-

0.24

... More
1 km ( 125mm dia)

1

3

3.75

1

4

4.3

1

4

4.84

1

5

5.36

1

5

5.86

... More
Beyound 5 km up to 10 km/km

1

-

0.45

... More
Beyound 10 km up to 20 km/km

1

-

0.38

... More
Beyound 20 km /every add.km

1

-

0.32

... More
1 km ( 150mm dia)

1

4

4.69

1

5

5.37

1

6

6.04

1

6

6.68

1

7

7.31

... More
Beyound 5 km up to 10 km/km

1

-

0.57

... More
Beyound 10 km up to 20 km/km

1

-

0.47

... More
Beyound 20 km /every add.km

1

-

0.4

... More
1 km ( 200mm dia)

1

7

7.62

1

8

8.73

1

9

9.82

1

10

10.87

1

11

11.89

... More
Beyound 5 km up to 10 km/km

1

-

0.92

... More
Beyound 10 km up to 20 km/km

1

-

0.77

... More
Beyound 20 km /every add.km

1

-

0.65

... More
1 km ( 250mm dia)

1

10

10.84

1

12

12.41

1

13

13.96

1

15

15.45

1

16

16.9

... More
Beyound 5 km up to 10 km/km

1

1

1.31

... More
Beyound 10 km up to 20 km/km

1

1

1.1

... More
Beyound 20 km /every add.km

1

-

0.92

... More
1 km ( 300mm dia)

1

13

13.4

1

15

15.34

1

17

17.26

1

19

19.1

1

20

20.89

... More
Beyound 5 km up to 10 km/km

1

1

1.63

... More
Beyound 10 km up to 20 km/km

1

1

1.36

... More
Beyound 20 km /every add.km

1

1

1.14

... More
1 km ( 350mm dia)

1

18

18.76

1

21

21.48

1

24

24.16

1

26

26.75

1

29

29.25

... More
Beyound 5 km up to 10 km/km

1

2

2.28

... More
Beyound 10 km up to 20 km/km

1

1

1.9

... More
Beyound 20 km /every add.km

1

1

1.6

... More
1 km ( 400mm dia)

1

25

25.58

1

29

29.29

1

32

32.95

1

36

36.47

1

39

39.88

... More
Beyound 5 km up to 10 km/km

1

3

3.11

... More
Beyound 10 km up to 20 km/km

1

2

2.6

... More
Beyound 20 km /every add.km

1

2

2.19

... More
1 km ( 450mm dia &500 mm dia )

1

31

31.26

1

35

35.8

1

40

40.27

1

44

44.58

1

48

48.75

... More
Beyound 5 km up to 10 km/km

1

3

3.8

... More
Beyound 10 km up to 20 km/km

1

3

3.17

... More
Beyound 20 km /every add.km

1

2

2.68

... More
1 km ( 600mm dia 700 mm dia 750 mm dia & 800 mm dia )

1

46

46.9

1

53

53.71

1

60

60.41

1

66

66.87

1

73

73.12

... More
Beyound 5 km up to 10 km/km

1

5

5.7

... More
Beyound 10 km up to 20 km/km

1

4

4.76

... More
Beyound 20 km /every add.km

1

4

4.02

... More
1 km ( 900mm dia )

1

70

70.35

1

80

80.56

1

90

90.62

1

100

100.31

1

109

109.69

... More
Beyound 5 km up to 10 km/km

1

8

8.55

... More
Beyound 10 km up to 20 km/km

1

7

7.15

... More
Beyound 20 km /every add.km

1

6

6.03

... More
Carriage of materials by manual means including loading ,unloading and stacking of GI CI AC pipes below 100 mm dia for Ist 50 mtrs

1

146

146.51

... More
For every additional 50 mtrs

1

21

21.5

... More
100mm dia Ist 50 mtrs

1

3

3.95

... More
For every additional 50 mtrs

1

-

0.58

... More
125mm dia Ist 50 mtrs

1

4

4.84

... More
For every additional 50 mtrs

1

-

0.71

... More
150mm dia Ist 50 mtrs

1

5

5.57

... More
For every additional 50 mtrs

1

-

0.81

... More
200mm dia Ist 50 mtrs

1

8

8.37

... More
For every additional 50 mtrs

1

1

1.22

... More
250mm dia Ist 50 mtrs

1

14

14.71

... More
For every additional 50 mtrs

1

2

2.15

... More
300mm dia Ist 50 mtrs

1

18

18.41

... More
For every additional 50 mtrs

1

2

2.7

... More
350mm dia Ist 50 mtrs

1

26

26.32

... More
For every additional 50 mtrs

1

3

3.86

... More
400mm dia Ist 50 mtrs

1

30

30.63

... More
For every additional 50 mtrs

1

4

4.49

... More
450mm dia & 500 mm dia Ist 50 mtrs

1

40

40.84

... More
For every additional 50 mtrs

1

5

5.99

... More
600mm dia ,700 mm dia,750mm dia & 800 mm dia Ist 50 mtrs

1

44

44.93

... More
For every additional 50 mtrs

1

6

6.59

... More
Carraige of materials by Mechanical transport Earth upto 1 km

1

160

160.93

1

184

184.3

1

207

207.3

1

229

229.48

1

250

250.92

... More
Beyond 5 Km upto 10 km /km

1

19

19.58

... More
Beyond 10 Km upto 20 km /km

1

16

16.36

... More
Beyond 20 km /every additional Km

1

13

13.8

... More
Crates upto 1 km

1

343

343.32

1

393

393.17

1

442

442.23

1

489

489.56

1

535

535.3

... More
Beyond 5 Km upto 10 km /km

1

41

41.77

... More
Beyond 10 Km upto 20 km /km

1

34

34.9

... More
Beyond 20 km /every additional Km

1

29

29.43

... More
Stone/ Boulders upto 1 km

1

151

151.47

1

173

173.46

1

195

195.1

1

215

215.98

1

236

236.16

... More
Beyond 5 Km upto 10 km /km

1

18

18.43

... More
Beyond 10 Km upto 20 km /km

1

15

15.4

... More
Beyond 20 km /every additional Km

1

12

12.98

... More
EC Bags upto 1 kms

1

-

0.05

1

-

0.06

1

-

0.07

1

-

0.07

1

-

0.08

... More
Beyond 5 Km upto 10 km /km

1

-

0.01

... More
Beyond 10 Km upto 20 km /km

1

-

0.01

... More
Beyond 20 km /every additional Km

1

-

-

... More
40 mm Agregrate Km

1

139

139.94

1

160

160.26

1

180

180.26

1

199

199.55

1

218

218.19

... More
Beyond 5 Km upto 10 km /km

1

17

17.03

... More
Beyond 10 Km upto 20 km /km

1

14

14.23

... More
Beyond 20 km /every additional Km

1

12

12

... More
20 mm Agregrate 1 Km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Sand 1 km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Timber 1km

1

147

147.14

1

168

168.5

1

189

189.53

1

209

209.81

1

229

229.41

... More
Beyond 5 Km upto 10 km /km

1

17

17.9

... More
Beyond 10 Km upto 20 km /km

1

14

14.96

... More
Beyond 20 km /every additional Km

1

12

12.61

... More
R.C.C spun pipes/DI pipes 600 mm 1 km

1

4690

4690.2

1

5371

5371.19

1

6041

6041.39

1

6687

6687.97

1

7312

7312.86

... More
Beyond 5 km upto 10 km per km

1

570

570.65

... More
Beyond 10 km upto 20 km per km 450 mm

1

476

476.77

1

3126

3126.8

1

3500

3500.79

1

4027

4027.59

1

4458

4458.65

1

4875

4875.24

... More
Beyond 5 km upto 10 km per km

1

380

380.43

... More
Beyond 10km upto 20 km per km 300 mm

1

317

317.85

1

1340

1340.06

1

1534

1534.63

1

1726

1726.11

1

1910

1910.85

1

2089

2089.39

... More
Beyond 5 km upto 10 km per km

1

163

163.04

... More
Beyond 10 km upto 20 km per km 250 mm

1

136

136.22

1

1084

1084.18

1

1241

1241.59

1

1396

1396.51

1

1548

1548.98

1

1690

1690.43

... More
Beyond 5 km upto 10 km per km

1

131

131.91

... More
Beyond 10 km upto 20 km per km

1

110

110.21

... More
D.I pipes 200 mm 1 km

1

762

762.94

1

873

873.91

1

982

982.73

1

1087

1087.91

1

1189

1189.56

... More
Beyond 5 km upto 10 km per km

1

92

92.83

... More
Beyond 10 km upto 20 km per km

1

77

77.55

... More
150 mm1 km

1

469

469.02

1

537

537.22

1

604

604.14

1

668

668.8

1

731

731.29

... More
Beyond 5 km upto 10 km per km

1

57

57.06

... More
Beyond 10 km upto 20 km per km

1

47

47.68

... More
Carriage of cement/steel by mechanical means1 km

1

114

114.44

1

131

131.06

1

147

147.41

1

163

163.19

1

178

178.43

... More
Beyond 5 km upto 10 km per km

1

13

13.92

... More
Beyond 10 km upto 20 km per km

1

11

11.63

... More
Carriage of bricks by MT means1 km

1

-

0.34

1

-

0.39

1

-

0.44

1

-

0.49

1

-

0.54

... More
Beyond 5 km upto 10 km per km

1

-

0.04

... More
Beyond 10 km upto 20 km per km

1

-

0.04

... More
Beyond additional 20 km per km

1

-

0.03

... More
Carraige of materials by Manual Means Earth for first 50 mtrs.

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Crates for first 50 mtrs.

1

146

146.51

... More
for every additional 50 mtrs

1

21

21.5

... More
Boulders for first 50 mtrs.

1

236

236.08

... More
for every additional 50 mtrs

1

51

51.4

... More
Bags for first 50 mtrs.

1

37

37.46

... More
for every additional 50 mtrs

1

8

8.16

... More
Carriage of material by Manual Means from dumping site to actual site of work including loading, unloading, stacking etc First 50 metres 600mm R.C.C spun pipes

1

4493

4493

1

4084

4084.54

1

1841

1841.39

1

1471

1471.5

... More
Additional (50 metres) 600mm

1

659

659.3

1

599

599.36

1

270

270.2

1

215

215.93

... More
D.I pipes First 50 metres 200 mm

1

837

837.2

1

557

557.91

... More
Additional (50 metres) 200 mm

1

122

122.85

... More
150 mm

1

81

81.82

... More
Stone For First 50 Mtrs

1

236

236.08

... More
for every additional 50 mtrs

1

51

51.4

... More
40 mm For First 50 Mtrs

1

216

216.94

... More
for every additional 50 mtrs

1

47

47.23

... More
20 mm For First 50 Mtrs

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Sand For First 50 Mtrs

1

200

200.69

... More
for every additional 50 mtrs

1

43

43.69

... More
Timber Ist 50m

1

160

160.46

... More
Beyond 50m

1

23

23.55

... More
Carriage of Cement by Manual MeannsFirst 50 mtrs

1

116

116.22

... More
Every additional lead of 50 mtrs

1

17

17.05

... More
Carriage of Steel by Manual MeannsFirst 50 mtrs

1

249

249.61

... More
Every additional lead of 50 mtrs

1

36

36.63

... More
Carriage of Bricks by Manual MeannsFirst 50 mtrs

1

-

0.37

... More
Every additional lead of 50 mtrs

1

-

0.08



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.