Irrigation And Flood Control Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date23 Mar 2023
Closing Date10 Apr 2023
Tender Amount₹ 11,00,000
Costs
EMD
₹ 22,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IFC_208698_3Bid Award Id
ViewTender No
eNIT 13 of 2022-23 dt 23.03.2023 (Stage Contract)Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Silt clearance from canals inclusive of intitial lead and lift ( 50 mtrs and 1.5 mtrs) respctively wet.
1
168
168.25
... More
Silt clearance from canals inclusive of intitial lead and lift ( 50 mtrs and 1.5 mtrs) respctively Dry.
1
100
100.95
... More
Random Rubber Masonry with hard stone in foundation and plinth including levelling up with cement concrate 1:6:12 (1 cement 6 coarse sand 12 graded stone aggregate 20 mm nominal size ) upto plinth level. Cement mortar 1:6 ( 1 cement 6 coase sand). Full Rate
1
4400
4400.5
... More
Random Rubber Masonry with hard stone in foundation and plinth including levelling up with cement concrate 1:6:12 ( 1 cement 6 coarse sand 12 graded stone aggregate 20 mm nominal size ) upto plinth level. Cement mortar 1:6 ( 1 cement 6 coase sand). Labour Rate
1
4031
4031.62
... More
Dry Random Rubber Masonry with hard stone in foundation and plinth ( without bond stone)
Full Rate
1
2355
2355.95
... More
Dry Random Rubber Masonry with hard stone in foundation and plinth ( without bond stone)
Labour Rate
1
1987
1987.07
... More
Providing and laying in position cement concrate of specified grade including curing but including the cost of centring and shuttering. All work upto plinth level with. 1:3:6 ( 1 cement 3 coarse sand 6 graded stone aggregrate 20 mm nominal size).
1
4943
4943.4
... More
Providing and Laying cement concrete in retaining walls, Return Walls, Walls (any thickness) including attached pilasters, columns, pires, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, copings, bed blocks, enchor blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centering, shuttering and finishing with: 1:3:6 (1 cement 3 coarse sand 6 graded stone aggregrate 20 mm nominal size).
1
6608
6608.35
... More
Providing and laying in position cement concrate of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with. 1:4:8 (1 cement 4 coarse sand 8 graded stone aggregate 40 mm nominal size).
1
4419
4419.85
... More
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (maximum size of aggregrete 20 mm nominal size) in beds
1
4536
4536.05
... More
constructing Muthu bunds, comprising boulders and wood bushes in alternate layers including working in water situations.
1
1158
1158.15
... More
20 mm cement plaster of mix. 1:4 (1cement :4 sand)
1
357
357.7
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with. 1:2:4 (1 cement 2 coarse sand 4 graded stone 20 mm nominal size).
1
5877
5877.45
... More
Providing and laying in position cement concrete of specified grade of reinforced cement conc. Including curring but excluding cost of centring and shuttering finishing and reinforcement. All works up to plinth level. 1:2:4 (1 cement 2 coarse sand 4 graded stone agg. 20 mm nominal size.
1
6344
6344.25
... More
Centering and shuttering including strutting, propping etc. and removal of form for foundation footings , bases of columns etc. for mass concrete.
1
262
262.3
... More
Walls (any thicknes) including plasters, butteres, plinth & string courses etc
1
573
573.85
... More
Filling empty cement bags with sand / earth, including cost of sewing and sting , including cost of bags and earth/ sand.
1
7
7.1
... More
Hand packing stones in wire crates including supply of stone, but excluding cost of crates.
1
655
655.45
... More
Steel reinforcement for RCC work including straingtening, cutting, bending, placing in position and bending all complete up to plinth level mild steel and medium tensile bars.
1
78
78.55
... More
Providing of polythene sheets for plugging of seepages.
1
18
18
... More
Demolishing cement concrete manually or by Mechanical means including disposal of material within 50 mtrs lead as per directions of engineer incharge: 1:3:6 or richer mix
1
1569
1569.2
... More
Demolishing cement concrete manually or by Mechanical means including disposal of material within 50 mtrs lead as per directions of engineer incharge: 1:4:8 or leaner mix
1
968
968.3
... More
Demolishing stone rubble masonry manually/ by Mechanical means including stacking of serviceable material and disposal of unserviceable material within 50M lead as per direction of engineer Incharge, in cement Mortar
1
1583
1583.05
... More
Labour engaged for dismantaling of dry stone masonary including stacking of serviceable material and disposal of unserviceable material 01 Number labour for 2.83 Cubic Metre (complete job as directed by Engineer Incharge)
1
503
503
... More
Providing and laying HDEP pipes 110 mm dia
1
511
511.15
... More
Providing and laying HDEP pipes 125 mm dia
1
665
665.5
... More
Providing and laying HDEP pipes 140 mm dia
1
920
920.9
... More
Providing and laying HDEP pipes 160 mm dia
1
1188
1188
... More
Providing of CGI sheets 0.50 mm thick with zinc coating for crossing water through breaches portion.
1
830
830.25
... More
supply of carpenter for cutting and making proper shape and fitting for canals/khuls section of plywood sheets/ C.G.I sheets etc.
1
700
700
... More
Supply of labour for laying and fitting of G.I sheets and pipes etc
1
503
503
... More
Supply of plyboard sheets ) i) 40 mm thick
1
800
800
... More
Supply of plyboard sheets ) i) 19 mm thick
1
600
600
... More
Weed clearence from canal/khuls section including extraction of roots
1
12
12.25
... More
Providing and fixing 20mm thick wooden planks ( for construction of temporary channel of canal section) (Fir wood )
1
1271
1271.75
... More
Providing and fixing (150mm x 75mm x 75mm ) vertical post for supporting of temporary channel canal section (Second class kail wood)
1
9206
9206.35
... More
Providing/laying and fitting of flume pipe of 1000mm dia. Including carriage
1
8200
8200
... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete a) welded
1
92
92.85
... More
Dumping stones excluding cost of stones (in Horizontal on level)
1
216
216.4
... More
Supply of stones
1
318
318
... More
Supply of crates.
1
6000
6000
... More
Carriage of material from nearest Crusher to site of work including loading , unloading , stacking complete by Av. 05 Km by MT . ( to be paid as per actual distance involved at site)
a) Sand
1
179
179.37
... More
b) Stone Agg. below 20mm
1
179
179.37
... More
Stone Agg. 20 mm and above upto 40 mm
1
194
194.96
... More
d) Earth
1
224
224.21
... More
h) Stone
1
211
211.02
... More
Carriage of material by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Beyond 5.00 Km upto 10.00 Km/km a) Sand
1
12
12.97
... More
b) Stone Agg. below 20mm
1
12
12.97
... More
Stone Agg. 20 mm and above upto 40 mm
1
14
14.1
... More
d) Earth
1
16
16.21
... More
h) Stone
1
15
15.26
... More
Carriage of material by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Beyond 10.00 Km upto 20.00 Km/km a) Sand
1
10
10.56
... More
b) Stone Agg. below 20mm
1
10
10.56
... More
Stone Agg. 20 mm and above upto 40 mm
1
11
11.48
... More
d) Earth
1
13
13.2
... More
h) Stone
1
12
12.42
... More
Carriage of material by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Additional lead above 20.00 KM a) Sand
1
8
8.64
... More
b) Stone Agg. below 20mm
1
8
8.64
... More
Stone Agg. 20 mm and above upto 40 mm
1
9
9.39
... More
d) Earth
1
10
10.8
... More
h) Stone
1
10
10.17
... More
Carriage of material from source to site of work Av. 50m by H/L . ( to be paid as per actual distance involved at site) a) Sand
1
182
182.52
... More
b) Stone Agg. below 20mm
1
182
182.52
... More
Stone Agg. 20 mm and above upto 40 mm
1
197
197.32
... More
d) stone
1
214
214.73
... More
d) Earth
1
182
182.52
... More
Carriage of material by H/L for subsequent additional 50m Lead. ( to be paid as per actual distance involved at site) a) Sand
1
39
39.74
... More
b) Stone Agg. below 20mm
1
39
39.74
... More
Stone Agg. 20 mm and above upto 40 mm
1
42
42.96
... More
d) stone
1
46
46.75
... More
d) Earth
1
39
39.74