Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Pipes and Pipe Related Activities
Eprocure
Opening Date26 Feb 2021
Closing Date26 Mar 2021
Tender Amount₹ 20,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.

-

-

-

... More
All kinds of soil

1

-

188.75

... More
Ordinary rock

1

-

378.35

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.

-

-

-

... More
All kinds of soil

-

-

-

... More
1 meter from cutting edge.

1

-

436

... More
25meter beyond 1 m from cutting edge

1

-

524.4

... More
50meter beyond 1 m from cutting edge

1

-

612.75

... More
Ordinary rock

-

-

-

... More
1 meter from cutting edge.

1

-

967.85

... More
25meter beyond 1 m from cutting edge.

1

-

922.35

... More
50meter beyond 1 m from cutting edge.

1

-

1003.1

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

-

198.7

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :

-

-

-

... More
All kinds of soil

1

-

81.65

... More
Ordinary or hard rock

1

-

146.45

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

-

166.9

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

-

155.55

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level with:

-

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

-

4943.4

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

-

5877.45

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

-

4419.85

... More
DAMP PROOF COURSE: Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete

1

-

310.55

... More
DAMP PROOF COURSE Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete

1

-

372.85

... More
CAST-IN-SITU: Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level

-

-

-

... More
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

-

7091.6

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

-

6344.25

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

-

8552.85

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).

1

-

8953.95

... More
FORM WORK : Centering and shuttering including strutting, propping etc. and removal of form for:

-

-

-

... More
Foundations, footings, bases of columns etc. for mass concrete.

1

-

262.3

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

-

573.85

... More
Suspended floors, roofs, landings, balconies and access platforms.

1

-

635.6

... More
Shelves (cast-in-situ)

1

-

635.6

... More
Lintel, beams, plinth beams, girders, bressumers and cantilevers

1

-

502.85

... More
Columns, pillars, piers, abutments, posts and struts.

1

-

680.15

... More
Edges of slabs and breaks in floors and walls (Under 20 cm wide)

1

-

242.3

... More
Edges of slabs and breaks in floors and walls (Above 20 cm wide)

1

-

1073

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

-

79.25

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :

-

-

-

... More
Cement mortar 1:4 ( 1 cement : 4 coarse sand)

1

-

6501.2

... More
Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

-

6183.75

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

-

1323.65

... More
RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plint including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand)

-

-

-

... More
Quarry

1

-

4435.25

... More
Nallah

1

-

4400.5

... More
Dry random rubble masonry with hard stone in foundation and plinth:

-

-

-

... More
With bond stone.

-

-

-

... More
Quarry

1

-

2497.5

... More
Nallah

1

-

2462.7

... More
Without bond stone

-

-

-

... More
Nallah

1

-

2355.95

... More
Frames and trusses Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately)

-

-

-

... More
First class kail wood

1

-

106894.15

... More
Second class kail wood

1

-

92065.35

... More
Kiln-Dried Wood

1

-

-

... More
Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of: Engineer-in-charge

-

-

-

... More
First class kail wood

-

-

-

1

-

3093.8

1

-

2784.1

... More
Second class kail wood

-

-

-

1

-

2745.9

1

-

2489.75

... More
Kiln-Dried Wood/Silver wood

-

-

-

1

-

-

1

-

-

... More
Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of: Engineer-in-charge

-

-

-

... More
First class kail wood

-

-

-

1

-

3651.65

1

-

3260.7

... More
Second class kail wood

-

-

-

1

-

3307.8

1

-

2966.35

... More
Kiln-Dried Wood/Silver wood

-

-

-

1

-

-

1

-

-

... More
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete.

-

-

-

... More
Fixed to steel windows by welding

1

-

161.25

... More
Fixed to openings / wooden frames with rawl plugs screws etc.

1

-

179.9

... More
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position :

-

-

-

... More
Budloo/ Fire wood

1

-

60102.8

... More
Popular Wood

1

-

-

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

-

82.75

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

-

-

-

... More
Riveted and bolted

1

-

96.15

... More
Welded

1

-

92.85

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.

-

-

-

... More
25mm thick with 12.5 mm nominal size stone aggregate.

1

-

372.8

... More
40mm thick with 20 mm nominal size stone aggregate.

1

-

461.85

... More
50 mm thick with 20mm nominal size stone aggregate.

1

-

505

... More
C.G.I. SHEETS ROOFING Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.

-

-

-

... More
0.63 mm thick with zinc coating not less than 275 gram/m2

1

-

951.8

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

-

830.25

... More
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete.

-

-

-

... More
0.63 mm thick with zinc coating not less than 275 gram/m2

1

-

691.35

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

-

626.7

... More
CIELING Providing and fixing 20mm thick wooden planks ceiling (frame work for base to be paid for separately) with M.S. screws.

-

-

-

... More
1st class kail wood

1

-

2016.3

... More
2nd class kail wood

1

-

1712.85

... More
Popular wood

1

-

-

... More
Kiln-Dried Wood/Silver wood

1

-

-

... More
Budloo / Fir wood

1

-

1271.75

... More
Providing hoisting and fixing trusses/purlins /rafters/posts/ post-plates or like components including cost of screws etc. complete

-

-

-

... More
Second class Kail wood

1

-

161111.8

... More
First class Budloo/Fir wood

1

-

138685.4

... More
Popular wood

1

-

-

... More
CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix:

-

-

-

... More
1 : 4 ( 1 cement : 4 fine sand)

1

-

260.05

... More
1 : 6 ( 1 cement : 6 fine sand)

1

-

241.75

... More
CEMENT PLASTER (IN FINE SAND) 15mm Cement plaster on the rough side of single or half brick wall of mix:

-

-

-

... More
1 : 4 ( 1 cement : 4 fine sand)

1

-

300.45

... More
1 : 6 ( 1 cement : 6 fine sand)

1

-

278.6

... More
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.

1

-

13.2

... More
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.

1

-

17

... More
White washing with lime to give an even shade on New Work (three or more coats)

1

-

27.55

... More
Colour washing such as green blue or buff to give an even shade

-

-

-

... More
New work (two or more coats) with a basecoat of white washing with lime.

1

-

35.45

... More
New work (two or more coats) with basecoat of whiting

1

-

34.9

... More
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade

1

-

115.45

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer

1

-

149.05

... More
Distempering with 1st quality acrylic distemper (ready mixed)having VOC content less than 50 gms/litre, two or more coats on new work of approved manufacturer, of required shade and colour complete as per manufacturer’s specifications

1

-

82.6

... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface.

1

-

59.35

... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)

1

-

91.8

... More
Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10sqm) over priming coat of primer applied @ 0.80 liters/10sqm complete including cost of priming coat.

1

-

86.6

... More
Applying priming coat: With ready mixed aluminum primer of approved brand and manufacture on resinous wood and ply wood

1

-

60.4

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel work (second coat)

1

-

28.9

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

1

-

179.8

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On steel work

1

-

188.8

... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On concrete work

1

-

183.45

... More
Wall Painting with acrylic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work

1

-

127.45

... More
Painting with aluminum paint of approved brand and manufacture to give an even shade. Two or more coats on new work

1

-

119.4

... More
Painting with silicon and acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces: One coa

1

-

80.95

... More
With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ liter

1

-

59.5

... More
With ready mixed red oxide zinc chromatic on steel / iron works having VOC content less than 250 grams/ liter

1

-

50.95

... More
Applying priming coat: With ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood)

1

-

59.5

... More
With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works

1

-

52.75

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work

1

-

121.95

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:

-

-

-

... More
1:3:6 or richer mix (i/c equivalent design mix)

1

-

1569.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

-

983.3

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

-

2289.25

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

-

1583.05

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

-

1326.55

... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) :

-

-

-

... More
From brick work in cement mortar

1

-

4494.3

... More
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead

1

-

35.35

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

-

362.3

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.

-

-

-

... More
150 mm dia. R.C.C. pipe-(6”)

1

-

451.1

... More
250 mm dia. R.C.C. pipe-(9”)

1

-

730.8

... More
300 mm dia. R.C.C. pipe-(12”)

1

-

840.25

... More
450 mm dia. R.C.C. pipe-(18”)

1

-

1348.95

... More
600 mm dia. R.C.C. pipe-(24”)

1

-

1901.1

... More
900 mm dia. R.C.C. pipe-(36”)

1

-

3996.55

... More
1000 mm dia. R.C.C. pipe-(40”)

1

-

4672.25

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

-

1158.15

... More
Dry stone pitching (any thickness) excluding cost of stones.

-

-

-

... More
On Horizontal

1

-

486.8

... More
On Top copings of banks

1

-

612.1

... More
On Slopes

1

-

630.8

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

-

337.45

... More
Dumping stone excluding cost of stones.

-

-

-

... More
in Horizontal on level

1

-

216.4

... More
on Slopes (Behind pitching)

1

-

237.8

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100Sqm on horizontal/side slopes; complete including curing.

1

-

168.75

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.

1

-

277.35

... More
Opening out old wire crates those and re-binding after filling.

1

-

32.35

... More
Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)

1

-

400

... More
Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%)

1

-

1000

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

-

7.1

... More
Unloading sand/earth filled bags from boats

-

-

-

... More
Placing in dry

1

-

8.4

... More
Placing in Water

1

-

16.8

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )

-

-

-

1

-

100.95

1

-

168.25

... More
Shingle clearance from canals.

1

-

134.6

... More
Weed clearance

-

-

-

... More
From lakes(using boats)

1

-

19.25

... More
From canals(including extraction of roots)

1

-

12.25

... More
SLIP CLEARANCE

-

-

-

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

-

140.2

... More
In soils; mixed with moorum/ Kankar/ shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

-

301.15

... More
In soils; mixed with Decomposed Rocks; by blasting or any other means

1

-

374.15

... More
Engagement of Labour

1

-

503

... More
Bullockman with single bullock

1

-

503

... More
Chowkidar

1

-

503

... More
Belder

1

-

503

... More
Coolie

1

-

503

... More
Mali/sewerman

1

-

503

... More
Helper(Technician)

1

-

503

... More
Labour for fabrication of upvc extruded casement/ sliding windows And doors including drilling holes, fixing of fittings & hardware’s, hire Charges of drill machine and electricity charges etc.

1

-

503

... More
Labour for installation of upvc extruded casement/ sliding windows And doors including scaffolding.

1

-

503

... More
Mason (for brick work) 1st class

1

-

733

... More
Mason (for plaster of paris work) 1st class

1

-

733

... More
Fitter (Grade 1)

1

-

733

... More
Carpenter 1st class

1

-

733

... More
Blacksmith 1st class

1

-

733

... More
Mason (for ornamental stone work) 1st class

1

-

733

... More
Driver for Road Roller, Concrete Mixer, Truck etc.

1

-

733

... More
Mistry/ Operator (Pile / Special machines)

1

-

733

... More
Technician

1

-

733

... More
Mason (for brick work) 2nd class

1

-

666

... More
Mason (for plain stone work) 2nd class

1

-

666

... More
Glazier

1

-

666

... More
Assistant Fitter or 2nd class Fitter

1

-

666

... More
Carpenter 2nd class

1

-

666

... More
Blacksmith 2nd class

1

-

666

... More
Painter

1

-

666

... More
Nozzle man/ gun man

1

-

666

... More
Boatman

1

-

569

... More
Boat(Capacity up to 20cum)

1

-

1050

... More
Mason (average)

1

-

700

... More
Carpenter (average)

1

-

700

... More
Hire charges of Pumpset of capacity 4000 litres/hour

1

-

700

... More
Surface Vibrator

1

-

700

... More
Hire charges of Concrete Mixer 0.25 to 0.40 cum with hopper

1

-

1000

... More
Cutting saw machine(wood cutter)

1

-

1350

... More
Supplying and stacking of Good Earth at site including royalty,(earth measured in stacks will be reduced by 20% for payment

1

-

258.25

... More
Empty Cement Bags

1

-

2

... More
Stone dust

1

-

350

... More
Engagement of JCB including POL with driver complete.

1

-

-

... More
Engagement of JCB including poclain with driver complete.

1

-

-

... More
Vibrator

1

-

-

... More
Hire charges of vehicle during day or night alongwith licensed comercial driver for site inspection/ movement of officials within jurisdiction including Driver and POL on need basis only.

1

-

-

... More
Upto 60Km Journey

1

-

-

... More
Upto 120Km Jounney

1

-

-

... More
Upto 250Km Journey

1

-

-

... More
Engagement of Load carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed

1

-

-

... More
Upto 60Km Journey

1

-

-

... More
Upto 120Km Jounney

1

-

-

... More
Disassembling and reassembling of chain saw wood cutter after necessary repairs including all accessories required for repair work with all sorts carriages complete.

1

-

-

... More
Dismantling, Realignment and assembling after repairs of double winch iron gate

1

-

-

... More
Dismantling, Realignment and assembling of single winch iron gate

1

-

-

... More
Repairs to shutter by way of removing dents, kinks and setting of iron gate

1

-

-

... More
Lubricating, greasing after cleaning the machine (complete job)

1

-

-

... More
Repairs to winch rod by removing and setting of dents and bends(double threaded winch rod)

1

-

-

... More
Providing/replacing sill/groove MS steel channel of ISMC 150X75 mm

1

-

-

... More
Repairs to side channels by way of removal of bends and kinks incl.setting and fixing complete

1

-

-

... More
Providing and fixing of pipe sleeves (Rain water pipes) incl.priming coat and two coats of metallic

1

-

-

... More
Providing & fixing of grease lids for winch machines

1

-

-

... More
Providing & fixing of coupling of required sizes

1

-

-

... More
Providing & fixing of rubber seal for shutters

1

-

-

... More
Disassembling and reassembling of water Control gate after necessary repairs including all accessories req. at site with all sorts of carriage complete in all respects to entire satisfaction of Engineer In charge

-

-

-

... More
Double winch Machine

1

-

-

... More
Single winch machine..

1

-

-

... More
Worm Rods

1

-

-

1

-

-

... More
Nut bolts

1

-

-

... More
Electric Welding

1

-

-

... More
operating handles

1

-

-

... More
Rubber seal of standard quality

1

-

-

... More
Providing , Installation , commissioning & testing of Single Winch machine complete set of standard quality of 3 tonne capacity with double threaded 50mm dia Winch rod, Gears , Pedestal Rain Cover ,Grease Lids, MS Sleeves, operating Handle with locking arrangement including greasing & oiling complete Job including all carriages & extra carriages upto site of wor

1

-

-

... More
Providing , Installation , commissioning & testing of Double Winch machine complete set of standard quality of 5 tonne capacity with coupling rod , coupling set double threaded 50mm dia Winch rod, Gears , Pedestal Rain Cover ,Grease Lids, MS Sleeves, operating Handle with locking arrangement including greasing & oiling complete Job including all carriages & extra carriages upto site of work

1

-

-

... More
Fabrication, supply and installation of M.S. water control gate manually operated at site by mechanical arrangements with single winch macine of standard quality and size with winch rods of gun metal 50mm dia of required lengths, 6mm thick gate shutter to be fixed on channels of required/suitable sizes and length's to be properly welded including all accessarioes required at site with all sorts of carriages dully operated tested commissioned at site of work complete job to entire satisfication of Engineer in-Charge.

1

-

-

... More
Fabrication, supply and installation of M.S. water control gate manually operated at site by mechanical arrangements with double winch macine of standard quality and size with winch rods of gun metal 50mm dia of required lengths, 6mm thick gate shutter to be fixed on channels of required/suitable sizes and length's to be properly welded including all accessarioes required at site with all sorts of carriages dully operated tested commissioned at site of work complete job to entire satisfication of Engineer in-Charge.

1

-

-

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

1

-

2193.9

... More
Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same in- All kinds of soil.

1

-

2231.34

... More
Providing refreshment to supervisory staff of the for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu :

-

-

-

... More
Water Bottle One litre.

1

-

-

... More
Water Bottle 500 ml.

1

-

-

... More
Water bollte 250 ml.

1

-

-

... More
Boiled Egg.

1

-

-

... More
Biscuit standard Quality of 50 g.

1

-

-

... More
Dal 50 g Pack.

1

-

-

... More
Banana.

1

-

-

... More
Butter Toastes each pair.

1

-

-

... More
Toastes without Butter each pair.

1

-

-

... More
Tea Sugar each Cup.

1

-

-

... More
Tea Namkeen each Cup.

1

-

-

... More
Normal Chicken Biryani one plate for person.

1

-

-

... More
Rice Plate with Dal , vegetables & curd for each person.

1

-

-

... More
Rice Plate with vegetables, Single piece meat & curd for each person.

1

-

-

... More
Carriage of material from divisional store up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Cement & steel, G.I/C.I pipe avg. lead upto 01 Kms

1

-

105.56

... More
Cement & steel, G.I/C.I pipe avg. lead upto 02 Kms

1

-

119.6

... More
Cement & steel, G.I/C.I pipe avg. lead upto 03 Kms

1

-

133.41

... More
Cement & steel, G.I/C.I pipe avg. lead upto 04 Kms

1

-

146.67

... More
Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms

1

-

159.44

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

-

11.53

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

-

9.39

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km

1

-

7.68

... More
Sand & Agg. 20 mm avg. lead of upto 01 Kms

1

-

118.75

... More
Sand & Agg. 20 mm avg. lead upto 02 Kms

1

-

134.55

... More
Sand & Agg. 20 mm avg. lead upto 03 Kms

1

-

150.08

... More
Sand & Agg. 20 mm avg. lead upto 04 Kms

1

-

165

... More
Sand & Agg. 20 mm avg. lead upto 05 Kms

1

-

179.37

... More
Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

-

12.97

... More
Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

-

10.56

... More
Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

-

8.64

... More
40 mm Agg. avg. lead of upto 01 Km

1

-

129.08

... More
40 mm Agg. avg. lead upto 2 Kms

1

-

146.25

... More
40 mm Agg. avg. lead upto 3 Kms

1

-

163.13

... More
40 mm Agg. avg. lead upto 4 Kms

1

-

179.35

... More
40 mm Agg. avg. lead upto 5 Kms

1

-

194.96

... More
40 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

-

14.1

... More
40 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

-

11.48

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

-

9.39

... More
Stone soiling avg. lead of upto 1 Km

1

-

139.71

... More
Stone soiling avg. lead upto 2 Kms

1

-

158.3

... More
Stone soiling avg. lead upto 3 Kms

1

-

176.57

... More
Stone soiling avg. lead upto 4 Kms

1

-

194.12

... More
Stone soiling avg. lead upto 5 Kms

1

-

211.02

... More
Stone soiling avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

-

15.26

... More
Stone soiling avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

-

12.42

... More
Stone soiling avg. lead beyond 20 Kms per additional Km

1

-

10.17

... More
Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour

-

-

-

... More
Cement for an avg. lead upto 50 mtr.

1

-

105.71

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

-

15.51

... More
Steel for an average lead upto 50Mtr

1

-

227.04

... More
Steel for an every additionaal lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

-

33.32

... More
Pipe for an average lead upto 50Mtr.

1

-

133.26

... More
Pipe for an every additionaal lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

-

19.56

... More
Soling for an avg. lead upto 50 mtr.

1

-

214.73

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

-

46.73

... More
Sand & 20mm Agg for an average lead upto 50Mtr

1

-

182.52

... More
Sand & 20mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

-

39.74

... More
40mm Agg for an average lead upto 50Mtr

1

-

197.32

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

-

42.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.