Irrigation And Flood Control Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date6 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 19,72,000
Costs
EMD
₹ 39,440Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IFC_263552_1Bid Award Id
ViewTender No
e-NIT no. 09 of 2024-25Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
0.45
1725
-
... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
6.4
592
-
... More
Extra over item no. 02 for additional 8 lifts
231
718
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
3
218
-
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
0.85
5733
-
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
2.4
9821
-
... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or
drains and the like.
77
167
-
... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil :
600
91
-
... More
Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
7.05
7104
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Cold twisted bars
857
123
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
13
286
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms
9
718
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls Under 20 cm wide
27
262
-
... More
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters
87
1535
-
... More
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
52
535
-
... More
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
95
693
-
... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
976
327
-
... More
Supply of Nallaha Stone
108
700
-
... More
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete
83
276
-
... More
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.
338
187
-
... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand
7125
7
-
... More
Unloading sand/earth filled bags from boats
Placing in Water
7125
18
-
... More
Supply of Empty Cement Bagas
7125
2
-
... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
81
703
-
... More
Supply of Sand
203
770
-
... More
Supply of knitted BA wire crates of Size 6mX1.2mX1.2m , mesh size 6"x6", thickness of wire 4mm including carriage upto to site of work complete Job
8
4200
-
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones
69
371
-
... More
Carriage of earth 100M by H/L
66
244
-
... More
Carriage of Stone Av. 05 Km by MT ncl. loading unloading and stacking complete.
108
236
-
... More
Carriage of Stone Agg. Av. 25 Km by MT Incl. loading unloading and stacking complete.
64
465
-
... More
Carriage of Sand Av. 25 Km by MT L Incl. loading unloading and stacking complete.
235
465
-
... More
Carriage of Stone Av. 100M by H/L Incl. loading unloading and stacking complete.
32
287
-
... More
Carriage of Stone Agg. Av. 100M by H/L Incl. loading unloading and stacking complete.
19
244
-
... More
Carriage of Sand Av. 100M by H/L Incl. loading unloading and stacking complete.
71
244
-
... More
Disposal of earth Av. 100M by H/L
58
244
-
... More
Disposal of sand Av. 100M by H/L
142
244
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements