Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date16 Mar 2024
Closing Date21 Mar 2024
Tender Amount₹ 3,00,000
Costs
EMD
₹ 6,040Document Cost
₹ 300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IFC_247449_12Tender No
NIT 42 of 2023-24Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth.
1
4
4.4
Deduct for not watering the excavated earth for banking.
1
33
33.45
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:
1
467
467.3
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
1
89
89.75
Hand-packing stones in wire-crates; excluding cost of crates and stones
1
371
371.15
Slip Clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
1
331
331.15
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
1
167
167.8
Supply of Diesel
1
87
87
Supply of Petrol
1
102
102
Supply of Kerosence
1
100
100
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
1
1622
1622.25
Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)
1
700
700
Supply of Empty Cement Bags from Divisional Store
1
4
4
Filling empty cement bags with sand/ earth including cost of sewing and strings; excluding cost of bags and earth / sand.
1
7
7.8
Loading/unloading sand/earth filled bags in Lorries lead upto 50 mtrs.
1
4
4.95
Unloading sand/earth filled bags from boats Placing in dry
1
9
9.25
Unloading sand/earth filled bags from boats Placing in Water
1
18
18.5
Supplying and stacking at site Good Earth
1
281
281.25
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1
12
12.5
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
1
189
189.2
Engagement of labour/ Beildar, Mazdoor
1
553
553
Engagement of Fitter ( Grade Ist)
1
806
806
Engagement of Black Smith 2nd Class
1
734
734
Engagement of Painter
1
734
734
Welding By gas Plant
1
9
9
Hiring Charges of JCB including Fuel, Driver and Crawling charges. Etc. in all complete job as per direaction in Charge at Site.
1
1200
1200
Hydraulic excavator (3D L&T) for emergent nature of works with driver and fuel including Crawling Charges and other works as per Direction In Charge at Site.
1
2500
2500
Hire and running charges of tractor with trolley including fuel and driver in all complete job as per direction of In charge at Site.
1
2500
2500
Hire and running charges of Tipper including fuel and driver in all complete job as per direction of In charge at Site.
1
5500
5500
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material
(1) Beyond 30 cm girth upto and including 60 cm girth.
1
379
379.05
(2) Beyond 60 cm girth upto and including 120 cm girth
1
1683
1683
Providing and Laying Special PVC Polythene
1
35
35
Repairs of canal Headworks gates by way of removing of Dents, Fixing/Installing of Bolts, Fixtures, Channels, Angle Iron, Welding Handles and maintenance of Elcteo-Mechanical Break down Etc.In all Complete Job As Per direaction In Charge At Site
1
45
45
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600 mm dia. R.C.C. pipe
1
1751
1751.8
250 mm dia. R.C.C. pipe
1
746
746.2
300 mm dia. R.C.C. pipe
1
837
837.51
450 mm dia. R.C.C. pipe
1
1145
1145.6
Hire and running charges of Cutting Saw machine including operator & fuel charges
1
2000
2000
Making pile poits for pile of dia upto 300mm (labours only)
1
37
37.22
Fixing steel rings to pile heads( by labours only)
1
44
44.18
Fixing pile shoe to piles by labours only
1
44
44.18
Driving piles of dia over 100mm but upto 150mm,depthupto 2.5m,manual driving,exluding cost of pile
1
115
115.6
Supply of C.I pile shoe of approved dimension
1
53
53
Supply of MS clamps for pile shoe and head
1
55
55
Supply of Kikar wooden poles of approved specifications of dia 100mm to 150mm(RTQ by contractor)
1
1500
1500
Carriage of Matetials from Source to Dumping Site By Means of Mechanical Transport including Staking, Loading, Unloading and other taxes Etc. In all complete job as per direaction In Charge at site.
(A) Earh from Avg. 1 Kms
1
160
160.93
2km
1
184
184.3
3km
1
207
207.3
4km
1
229
229.48
5km
1
250
250.92
beyond 5km upto 10km
1
19
19.58
beyond 10km upto 20km
1
16
16.39
beyond 20km /every additional km
1
13
13.8
Stone from Avg. 1 Kms
1
151
151.4
2km
1
173
173.46
3km
1
195
195.1
4km
1
215
215.98
5km
1
236
236.16
beyond 5km upto 10km
1
18
18.43
beyond 10km upto 20km
1
15
15.4
beyond 20km /every additional km
1
12
12.98
Empty cement bags from Avg. 1 Kms
1
-
0.05
2km
1
-
0.06
3km
1
-
0.04
4km
1
-
0.08
5km
1
-
0.08
beyond 5km upto 10km
1
-
0.01
beyond 10km upto 20km
1
-
-
beyond 20km /every additional km
1
-
-
R.C.C 600 mm dia Pipe from Avg. 12 Kms
1
106
106.5
Extra Carriage of Matetials from Dumping Site To Actual Site Of work By manual Means including Staking, Loading, Unloading and other taxes upto Avg. Lead of 500 Mtrs Etc. In all complete job as per direaction In Charge at site.
1
578
578.9
Taking, Editing & Printinng HD Photographs Size (6"x4"). Geotagged Before, During, After work
1
50
50
Evaluation Notes How It Works ?