Irrigation And Flood Control Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date17 Oct 2024
Closing Date28 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 5,957Document Cost
₹ 100Tender Fee
Refer Documents
Summary
Repairs To 1.0 Mva 33kv/420v Distribution Transformer For Lis Sheeri Narwah Stage Ist.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IFC_260414_1Bid Award Id
ViewTender No
Enit 36 of 2024 of MISD Baramulla M and RTender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and fitting of 02 No. fresh HT legs in appropriate size of copper wire as per sampler.( weight of one leg= 90 Kg)
180
-
-
Re-tapping of three no’s LT legs by way o9f using skilled labours, latheroid paper, cork sheet, cotton tape, fibre glass sleeves, insulation gum and varnishing of the coils and heating in the heating chamber.
110
-
-
Cleaning all the carbon smoke accumulated on HT/LT bush rod/bush cup with the help of liquid cleaner and soft cotton cloth, then fitted it one by one carefully in their own place without any damage. The job involves replacement of damaged silica gel breather with new one to absorb moisture /dust from air entering into transformer
1
-
-
Filtration of old existing T-oil .
800
-
-
Providing and Filling of fresh T-oil sealed barrel of Apar/Gulf make along with test certificate and the test valve of breakdown voltage should be 74.
210
-
-
Reassembling of Transformer by way of fitment of HT /LT Coils, core after proper cleaning, clamping channels, nuts/bolts heat treatment of the Assembled transformer, and fitting top lid of the transformer.
1
-
-
Loading of the transformer in a private Truck with the help of crane, skilled labour after proper repairs at workshop and unloading at site, tested on full load.
1
-
-
Deduction cost of old scrap as 85% of weight of item no. 03. As per actual measurement of scrap.
153
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements