Irrigation And Flood Control Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Machinery and Tools
Eprocure
Opening Date11 Oct 2024
Closing Date24 Oct 2024
Tender Amount₹ 7,37,000
Costs
EMD
₹ 14,740Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Providing And Fitting/modification Of 650 Hp Bhel Make (ht Motor) Including Replacement Of Bearing Assemblies And Fabrication Of New Motor Half Couplings At Lis Ranjan
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IFC_259273_1Bid Award Id
ViewTender No
MID/AN/73Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Modification by way of strengthening of Complete 650 HP stator be VPI procedure. Checking of all the coils from the stator, checking out all the laminations after proper cleaning of core/ slots making it free from oil / grease/ other deposition and replacement of damaged wedges/appropriate preparation of the stator for impregnation. The slot portions are to be wedged at the ends, centre and magnetic putty is to be inserted with adequate pressure to enhance flux linkage. Complete Insulation of all coils with the new “F” class insulation material of high quality such glass fibre or polyester and mica impregnated or glued together with epoxy, polyester amide (polyamide or polyimide), polyurethane or other resins having superior thermal stability, glass tape, fine cotton tape, wedges of mica textile etc. insertion of packing/anti vibration blocks, wedges and locking the same properly. The coil ends must be rigidly supported and adequately braced with binding rings or tapes to prevent their movement and also absorb shocks and vibrations during excessive over-loads, starting inrush currents, and voltage surges. Insulation of all the 54 No. of coils connections after brazing with eutectic brazing rods (14% of silver brazing rods) by applying in layers of glass mica tape reinforced by the varnished glass sleeves. Insulating the connections of the stator coil and also cleaning connections connecting the complete stator with CRC 226/ lectera. Varnishing the stator with class F Epoxy gel/ varnish coat of reputed make and drying out at optimum controlled temp. as permissible in standard practice. Continuing the drying out process till the required IR Value is achieved. Providing/ fitting in position of stator connection leads of actual length and specification. Complete job including the cost of material, labour charges.
1
-
-
Providing and fitting of new bearings at Non driving end
a) 6248/C3 Ball bearing
b) 6228/C3 Ball bearing
c) New Designed thrust ball bearing 7228 at Driving end. Complete job including the cost of material after deduction of rebate on old material/scrap hire charges for tools and tackles required during the execution of job and labour charges.
1
-
-
Cleaning of the top bearing oil chamber with flushing oil & providing and re-filling of fresh lubricating oil of actual specification up to the mark. Complete job
1
-
-
Fabrication of the motor half coupling along with spacer and coupling bolts of mild steel material of proper grade and size as per sample available at LIS Ranjan.
1
-
-
Reassembling of 650 HP BHEL make solid shaft 6.6. KV, 485 KW HT Motor at site & shifting the assembled motor and placing on motor skirt. Coupling the motor with VT pump half coupling, restoration of all electrical connections of motor to LRS, motor panels and slip rings, making proper alignment of motor with pump and adjustment thereof. Testing the motor on load for all connected parameters and commissioning for proper operation. Complete job in all respects.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements