Irrigation And Flood Control Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department Tender
Civil And Construction
Eprocure
Opening Date26 Apr 2025
Closing Date7 May 2025
Tender Amount₹ 7,90,000
Costs
EMD
₹ 15,800Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IFC_276210_1Tender No
e-NIT NO. 04 OF 2025-26Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply of labour for all sorts of works as per requirements for the item work not in the purview of SSR of 2022
1
553
-
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones
1
371
-
... More
Tipping of stone filled crates wired in position including equipment charges
1
312
-
... More
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates
1
81
-
... More
Dry stone pitching (any thickness) excluding cost of stones ( hortizontal)
1
535
-
... More
Dry stone pitching (any thickness) excluding cost of stones ( On slopes)
1
693
-
... More
Supply of stones
1
700
-
... More
Carriage of Stones avg 10 Km by MT
1
328
-
... More
Supply of mason grade one.
1
806
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
1
218
-
... More
Supply of empty cement bags
1
3
-
... More
Filling of empty cement bags with sand/earth including cost of sewing and strings excluding cost of bags and earth/sand
1
7
-
... More
Loading/ unloading of sand/earth filled bags in lorries lead upto 50 m
1
4
-
... More
Placing of bags filled with earth/sand in dry
1
9
-
... More
Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.50mx1.50m with lids (15cm x 15cm Mesh)
1
5500
-
... More
Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.20mx1.20m with lids (15cm x 15cm Mesh)
1
4500
-
... More
Carriage of Stones for an av. Distance 500M by H.L.
1
698
-
... More
Opening out old wire crates those and re-binding after filling.
1
35
-
... More
Dumping stone excluding cost of stones.
24.6.1 in Horizontal on level
1
237
-
... More
Dumping stone excluding cost of stones.
24.6.2 on Slopes (Behind pitching)
1
261
-
... More
Supply of B.A. Wire
1
85
-
... More
Carriage of material from Source to site of work, including loading, unloading and stacking etc. complete by Mechanical Transport i) Cement & steel, G.I/C.I pipe avg. lead upto 01 Kms
1
114
-
... More
Cement & steel, G.I/C.I pipe avg. lead upto 02 Kms
1
131
-
... More
Cement & steel, G.I/C.I pipe avg. lead upto 03 Kms
1
147
-
... More
Cement & steel, G.I/C.I pipe avg. lead upto 04 Kms
1
163
-
... More
Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms
1
178
-
... More
Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km)
1
178
-
... More
Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km)
1
13
-
... More
Stone soling avg. lead of upto 1 Km
1
151
-
... More
Stone soling avg. lead upto 2 Kms
1
173
-
... More
Stone soling avg. lead upto 3 Kms
1
195
-
... More
Stone soling avg. lead upto 4 Kms
1
215
-
... More
Stone soling avg. lead upto 5 Kms
1
236
-
... More
Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)
1
18
-
... More
Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)
1
15
-
... More
Stone soling avg. lead beyond 20 Kms per additional Km
1
12
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%