Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date16 Aug 2024
Closing Date12 Sep 2024
Tender Amount₹ 14,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for every additional lift of earth .(All kinds of soil) 1st Lift

2721.44

244249

89.75

... More
Extra for every additional lift of earth .(All kinds of soil) 2nd Lift

1541.4

276681

179.5

... More
Extra for earth work in excavation in or under water/liquid mud including pumping out water as required.

1348.56

50517

37.46

... More
Dumping stones excluding cost of stones in horizontal i.e on level

2504.99

595937

237.9

... More
Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered). Depth exceeding 1.5 m but not exceeding 3 m

3174

722878

227.75

... More
Providing and laying in position cement concrete of specified grade excluding cost of centring and shuttering All work upto plinth level- 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate (40mm nominal size) crushed.

173.34

901870

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level i 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

2521.26

17911913

7104.35

... More
Centering and shuttering including strutting, propping etc. and removal of form work

7951.8

2276997

286.35

... More
Reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete TMT bars.

113456

13977779

123.2

... More
Dry stone pitching (any thickness) excluding cost of stones.On slopes

645.43

447896

693.95

... More
Grouting of stone pitching using M-10 nominal mix conc. (max. size of agg. 20mm nominal) @ 3.65 cum per 100 sqm on horizontal/ side slopes, complete incl. curing. (cruhsed)

3375

672637

199.3

... More
Supply of Quarry Stones

645.43

1061732

1645

... More
Supply of Nallah Stones

2504.99

1753493

700

... More
Extra for laying concrete in or underwater and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete job.

661.44

521380

788.25

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering.

2517.05

549723

218.4

... More
Cement plaster of fine sand 12mm plaster of mix 1:6

1537

409149

266.2

... More
Carriage of materials from source to road site by mechanical transport including loading, unloading and stacking. Quarry Stones from Baramulla Avg. 40 KM

645.43

478850

741.91

... More
Nallah Stones from Ganderbal Avg. 20 KM

2504.99

1208181

482.31

... More
40 mm Agg. 10 KM

154.25

46790

303.34

... More
20 mm Agg. 10 KM

2308.45

644149

279.04

... More
Sand 10 KM

1286.27

358920

279.04

... More
Toe Wall Hajin Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil

6525.7

1222263

187.3

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil)

1631.42

967268

592.9

... More
Extra for every additional lift of earth .(All kinds of soil) 1st Lift

2488.42

223335

89.75

... More
Extra for every additional lift of earth .(All kinds of soil) 2nd Lift

584.37

104894

179.5

... More
Extra for earth work in excavation in or under water/liquid mud including pumping out water as required.

1631.42

61112

37.46

... More
Dumping stones excluding cost of stones in horizontal i.e on level

1996.82

475043

237.9

... More
Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.50 m

3912.5

948390

242.4

... More
Providing and laying in position cement concrete of specified grade excluding cost of centring and shuttering All work upto plinth level- 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate (40mm nominal size) crushed.

140.13

729082

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level i 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

2299.7

16337873

7104.35

... More
Centering and shuttering including strutting, propping etc. and removal of form work

6478.89

1855230

286.35

... More
Reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete TMT bars.

108699.4

13391766

123.2

... More
Dry stone pitching (any thickness) excluding cost of stones.On slopes

790.25

548393

693.95

... More
Grouting of stone pitching using M-10 nominal mix conc. (max. size of agg. 20mm nominal) @ 3.65 cum per 100 sqm on horizontal/ side slopes, complete incl. curing. (cruhsed)

3099

617630

199.3

... More
Supply of Nallah Stones

1996.82

1397774

700

... More
Supply of Quarry Stones

790.25

1299961

1645

... More
Extra for laying concrete in or underwater and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete job.

1415.58

1115830

788.25

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering.

2776.1

606300

218.4

... More
Carriage of materials from source to road site by mechanical transport including loading, unloading and stacking. Stones from Baramulla --avg.45 KM

2787.07

2248635

806.81

... More
40 mm Agg. 13 KM

100.87

34904

346.03

... More
40 mm Agg. 17 KM

24.03

9682

402.95

... More
20 mm Agg. 13 KM

1752.71

557905

318.31

... More
20 mm Agg. 17 KM

380.46

141025

370.67

... More
Sand 5 KM

1141.6

229164

200.74

... More
Carriage of materials by headload upto 200 Mtrs Stones

384.17

149933

390.28

... More
40 mm Agg.

16.82

6032

358.63

... More
20 mm Agg.

297.22

98599

331.74

... More
Sand

158.78

52578

331.14

... More
SPURS Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil

803

150401

187.3

... More
Extra for earth work in excavation in or under water/liquid mud including pumping out water as required.

160.6

6016

37.46

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

388.68

144258

371.15

... More
Supply of Quarry Stones

388.68

639378

1645

... More
Providing, drilling and installing Poplar wooden ballies of standard quality of average girth not less than 18 inches measured after removing bark, of specified length, including the cost of wood, making of pointed tip, charges of all equipments required for driving, taxes, loading/unloading and removal of same after completion and same to be stored in the divisional store, including all sorts of carriages (manual/mechanical), (Complete job as per the directions/satisfaction of E-in-C)

198.6

119160

600

... More
Providing and laying (Placing in position in dry/wet) of filled EC bags with filled capacity of 0.85 Cft per bag including cost of bags, filling, sewing and strings, filling material, placing in position in dry/wet including all sorts of carriages (manual/mechanical), loading/unloading and stacking and removal of the same after completion of the work, etc complete job as per the satisfaction of the E-in-Charge

4236

105900

25

... More
Supply and fixing of B.A Wire knitted Crates mesh size 100mm x 100mm) dia of wire 4mm of approved made and make, including all sorts of carriages upto the actual site of work, all sorts of carriages, loading/unloading and stacking, etc upto the actual site of work, complete in all respects to the entire satisfaction of the E-in-C

17233.1

344662

20

... More
Carriage of Quarry Stones from Baramulla avg.--45km

388.68

313590

806.81

... More
REVETMENT Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil

1126.63

211017

187.3

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil)

4505.37

2671233

592.9

... More
Extra for earthwork in excavation in or under water/ liquid mud including pumping out of water as required

1126.3

42191

37.46

... More
Extra for every additional lift of earth .(All kinds of soil) 1st Lift

393.46

35313

89.75

... More
Dumping stones excluding cost of stones in horizontal i.e on level

390.12

92809

237.9

... More
Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered)., depth exceeding 3 m but not exceeding 4.5 m) .

867.6

210306

242.4

... More
Providing and laying in position cement concrete of specified grade excluding cost of centring and shuttering All work upto plinth level- 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate (40mm nominal size) crushed.

32.4

168573

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level i 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

367.2

2608919

7104.9

... More
Centering and shuttering including strutting, propping etc. and removal of form work

890.4

254966

286.35

... More
Reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete TMT bars.

18360

2261952

123.2

... More
Supply of Nallah Stones

390.12

273084

700

... More
Extra for laying concrete in or underwater and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete job.

188.4

148506

788.25

... More
Providing and Laying of specified soil (40% sand and 60% good earth) carriage from source to site and filling in designated places in slopes or plain as per directions to make the proper slope or ground formation including all carriages, headload, labour etc. Slope filling for acheiving reqd profile for geo-textile.

910.11

650728

715

... More
Filling available excavated earth (excluding rock) (over the Geobags for formation of bund top) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. Complete job as per the direction/satisfaction of Engineer-in-Charge

1756.97

383722

218.4

... More
Providing and Laying of Geo-textile fabric of specified make Txt-(400 gsm-ppmf-f) including cost of Textile and Labour (complete job).

22059.85

4411970

200

... More
Supply and apply/laying of GEOCOMPOSITE 430pp (complete job) .

7923.8

7892104

996

... More
Providing and laying in position Megabags (filled capacity of 0.95 Cum per bag, filled with 60% earth and 40% sand), including cost of bags, filling of bags, sewing and strings, filling material , placing in position (dry/wet), all sorts of carriages (manual/mechanical), loading/unloading and stacking, etc. Complete job as per the directions/satisfaction of Engineer-in-Charge

2313.84

5150607

2226

... More
Providing and laying in position Geobags (filled capacity of 0.075 Cum per bag, filled with 60% earth and 40% sand), including cost of bags, filling of bags, sewing and strings, filling material , placing in position (dry/wet), all sorts of carriages (manual/mechanical), loading/unloading and stacking, etc. Complete job as per the directions/satisfaction of Engineer-in-Charge

45804

16227441

354.28

... More
Providing and laying in position Geobags (filled capacity of 0.075 Cum per bag, filled with 60% earth i.e, available and 40% sand), including cost of bags, filling of bags, sewing and strings, filling material (only sand), placing in position (dry/wet), all sorts of carriages (manual/mechanical), loading/unloading and stacking, etc. Complete job as per the directions/satisfaction of Engineer-in-Charge (Excluding cost of earth)

6710.4

2133907

318

... More
Carriage of materials from source to road site by mechanical transport including loading, unloading and stacking. Nallah Stones Avg. 45 KM

390.12

314752

806.81

... More
40 mm Agg. Avg. 13 KM

28.83

9976

346.03

... More
20 mm Agg. Avg. 13 KM

326.8

104023

318.31

... More
Sand Avg. 05 KM

179.82

36097

200.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.