Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Mar 2025
Closing Date4 Apr 2025
Tender Amount₹ 14,00,000 
Notes
Download

Costs

Summary

Fixation Of Stage Contract For Flood Protection Works Including Removal Of Encroachments For Flood Control Sub Division Sumbal And Hajin

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:

1

467

467.3

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

1

276

276.6

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :(All kinds of soil)

1

89

89.75

... More
Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.

1

65

65.9

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
Beyond 30 cm girth upto and including 60 cm girth.

1

379

379.05

... More
Beyond 60 cm girth upto and including 120 cm girth.

1

1683

1683

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

1

12

12.49

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with:

-

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level

-

-

-

... More
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

9395

9395.7

... More
Centering and shuttering including strutting, propping etc. and removal of form for:

-

-

-

... More
Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms. / Shelves (cast-in-situ)

1

718

718.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Mild steel and medium tensile steel bars

1

115

115.35

... More
Capturing and printing HD photographs (of size 4”x6”) on good quality standard photo paper

1

50

50

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 meters lead.

1

26

26.05

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:

-

-

-

... More
1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

2516

2516.85

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

398

398.35

... More
Tipping stone-filled wire crates in position; including equipment charges.

1

312

312.2

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25

... More
Dry stone pitching (any thickness) excluding cost of stones.

-

-

-

... More
On Horizontal

1

535

535.55

... More
On Top copings of banks

1

673

673.8

... More
On Slopes

1

693

693.95

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Dumping stone excluding cost of stones.

-

-

-

... More
in Horizontal on level

1

237

237.9

... More
on Slopes (Behind pitching)

1

261

261.45

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. Size of aggregates; 20mm nominal) @ 3.65 cum per 100Sqm on horizontal/side slopes; complete including curing.

1

199

199.3

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes.

1

700

700

... More
Supply of Stone boulder (quarry) nominal size 225 mm incl. royalty and/or other taxes.

1

1175

1175

... More
Supply of Stone for masonry work (quarry) incl. royalty and/or other taxes.

1

2400

2400

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

6

6.63

... More
Loading/Unloading sand/ earth filled bags in lorries / boats; lead upto 50m.

1

4

4.95

... More
Unloading sand/earth filled bags from boats

-

-

-

... More
Placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Engagement of Labour / Bullock man with single bullock /Chowkidar/ Belder/ Coolie/ Mali/sewer man / Helper {unskilled labour}

1

553

553

... More
Engagement of Skilled labour (1st Class) like Mason, technician, fitter, blacksmith, etc.

1

806

806

... More
Engagement of Skilled labour (2nd Class) like Mason, Painter, Carpenter.

1

734

734

... More
Boatman

1

625

625

... More
Engagement of Boat(Capacity up to 20cum)

1

1050

1050

... More
Petrol for running of departmental chain saw (wood cutter) inclusive of required admixtures

1

102

102

... More
Hire charges for engagement of Chain saw (mechanical wood cutter) incl. Operator, fuel, maintenance, carriage, complete job.

1

1350

1350

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Supply of sand

1

770

770

... More
Supply of crusher dust

1

770

770

... More
Supply of EC bags as and where required, incl. Carriage, loading, unloading, etc. Complete job

1

4

4.5

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job

1

1400

1400

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job

-

-

-

... More
(Poclain type) Normal Boom

1

2200

2200

... More
Long Boom

1

3000

3000

... More
Hire and running charges of light crane

1

3500

3500

... More
Hire charges of vehicle (SUV Type) during day or night along with licensed commercial driver for site inspection/ emergency situation/ movement of officials indluding all sorts of taxes, parking charges, etc and POL on need basis only.

-

-

-

... More
Upto 30Km Journey

1

1500

1500

... More
For every km after 30 km

1

30

30

... More
Hire charges of vehicle (Load Carrier) during day or night along with licensed commercial driver for carriage of materials indluding all sorts of taxes, parking charges, loading/unloading/stacking etc and POL on need basis only.

-

-

-

... More
Upto 30Km Journey

1

1500

1500

... More
For every km after 30 km

1

30

30

... More
Disassembling and reassembling of chain saw wood cutter and making necessary repairs including all accessories required for repair work with all sorts of carriages, complete.

1

1200

1200

... More
Repairs to shutter by way of removing dents, kinks and setting of iron gate Including all sorts of carriages.

1

950

950

... More
Lubricating, greasing after cleaning the machine (complete job)

1

1000

1000

... More
Repairs of worm or gear or screw rod or winch rod incl. Carriage of item involved from site to factory and back to site including Disassembling, Realignment, Greasing and reassembling of winch iron gate

1

2000

2000

... More
Repairs to side channels by way of removal of bends and kinks incl. setting and fixing complete

1

750

750

... More
Providing & fixing of grease lids for winch machines

1

200

200

... More
Providing & fixing of rubber seal of approved quality for checking of leakages in hydraulic gates

1

500

500

... More
Checking of leakages by way of replacing of Rubber seal of standard quality in gates, Complete job

1

500

500

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

120

120.8

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

-

-

-

... More
Riveted and bolted

1

142

142.9

... More
Welded

1

138

138.2

... More
Providing, driving and installing poplar wood piles of standard quality of average girth of not less than 18” after removing bark, of specified length, (including the cost of wood, making of pointed tip, charges of all equipment’s required at site for pile driving, taxes, all sorts of carriages manual / mechanical, loading / unloading, etc.), complete job as per directions/satisfaction of E-in C.

1

600

600

... More
Providing and laying (placing in position in dry/wet) of filled geo bags from approved sources to dumping site / divisional store (including all sorts of carriages, royalty and/or other taxes, cost of sewing & strings using machine/knots, cost of bag, loading, unloading, stacking, etc.) Complete job as per directions/satisfaction of E-in C. (Excluding cost of filling material)

1

241

241.9

... More
Providing and laying (placing in position in dry/wet) of filled mega bags from approved sources to dumping site / divisional store (including all sorts of carriages, royalty and/or other taxes, cost of sewing & strings using machine/knots, cost of bag, loading, unloading, stacking, etc.) Complete job as per directions/satisfaction of E-in C. (Excluding cost of filling material)

1

1254

1254.02

... More
Hire charges for engagement of water master, complete job

1

50000

50000

... More
Supply of B.A wire knitted crates of mech size 100mm x 100 mm with dia of wire 4mm of approved mad e and make including all sorts of carriage upto the actual site of work complete in all respects to the entire satisfaction of engineer in ch

1

20

20

... More
Providing / installation of waterproof tent, as and if required, having a capacity to accommodate at least 10 persons including matting, etc., complete job.

1

1000

1000

... More
Supply of Paper Reams containing 500 Pages, 75 GSM of Spectra/JK Copier including all sorts of carriages

-

-

-

... More
A4 Size

1

280

280

... More
Legal Size

1

380

380

... More
File Covers

1

4

4

... More
Supply of Printer Cartridges of standard quality at divisional office incl. all sorts of carriages

-

-

-

... More
HP Toner 110 A

1

1500

1500

... More
Hp Toner 88 A

1

1400

1400

... More
Toner(Ricoh model MP250ISP)

1

1900

1900

... More
Refilling of Printer Cartriges of standard quality at divisional office incl. all sorts of carriages

-

-

-

... More
HP Toner 110 A

1

400

400

... More
Hp Toner 88 A

1

400

400

... More
Toner (Ricoh model MP250ISP)

1

500

500

... More
Carriage of material from Source/divisional store up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Cement & steel, avg. lead upto 01 Kms

1

114

114.44

... More
Cement & steel, avg. lead upto 02 Kms

1

131

131.06

... More
Cement & steel, avg. lead upto 03 Kms

1

147

147.41

... More
Cement & steel, avg. lead upto 04 Kms

1

163

163.19

... More
Cement & steel, avg. lead upto 05 Kms

1

178

178.43

... More
Cement & steel, avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

13

13.92

... More
Cement & steel, avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

11

11.63

... More
Cement & steel, avg. lead beyond 20 Kms per additional Km

1

9

9.81

... More
Sand &Agg. 20 mm avg. lead of upto 01 Kms

1

128

128.75

... More
Sand &Agg. 20 mm avg. lead upto 02 Kms

1

147

147.44

... More
Sand &Agg. 20 mm avg. lead upto 03 Kms

1

165

165.84

... More
Sand &Agg. 20 mm avg. lead upto 04 Kms

1

183

183.58

... More
Sand &Agg. 20 mm avg. lead upto 05 Kms

1

200

200.74

... More
Sand &Agg. 20 mm avg. lead beyond 5 Kmsupto 10 Kms (per Km)

1

15

15.66

... More
Sand &Agg. 20 mm avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

13

13.09

... More
Sand &Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

11

11.04

... More
40 mm Agg. avg. lead of upto 01 Km

1

139

139.34

... More
40 mm Agg. avg. lead upto 2 Kms

1

160

160.26

... More
40 mm Agg. avg. lead upto 3 Kms

1

180

180.26

... More
40 mm Agg. avg. lead upto 4 Kms

1

199

199.55

... More
40 mm Agg. avg. lead upto 5 Kms

1

218

218.19

... More
40 mm Agg. avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

17

17.03

... More
40 mm Agg. avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

14

14.23

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

12

12

... More
Stone soiling avg. lead of upto 1 Km

1

151

151.47

... More
Stone soiling avg. lead upto 2 Kms

1

173

173.46

... More
Stone soiling avg. lead upto 3 Kms

1

195

195.1

... More
Stone soiling avg. lead upto 4 Kms

1

215

215.98

... More
Stone soiling avg. lead upto 5 Kms

1

236

236.16

... More
Stone soiling avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

18

18.43

... More
Stone soiling avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

15

15.4

... More
Stone soiling avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Earth avg. lead of upto 1 Km

1

160

160.93

... More
Earth avg. lead of upto 02 Km

1

184

184.3

... More
Earth avg. lead of upto 03 Km

1

207

207.3

... More
Earth avg. lead of upto 04 Km

1

229

229.48

... More
Earth avg. lead of upto 05 Km

1

250

250.92

... More
Earth avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

19

19.58

... More
Earth avg. lead beyond 10Kmsupto20Kms (per Km)

1

16

16.36

... More
Earth avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
E.C bags avg. lead of upto 1 Km

1

51

51.5

... More
E.C bags avg. lead of upto 02 Km

1

58

58.98

... More
E.C bags avg. lead of upto 03 Km

1

66

66.33

... More
E.C bags avg. lead of upto 04 Km

1

73

73.43

... More
E.C bags avg. lead of upto 05 Km

1

80

80.3

... More
E.C bags avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

6

6.27

... More
E.C bags avg. lead beyond 10Kms upto20Kms (per Km)

1

5

5.23

... More
E.C bags avg. lead beyond 20 Kms per additional Km

1

4

4.41

... More
Crates, avg. lead upto 01 Kms

1

343

343.32

... More
Crates avg. lead upto 02 Kms

1

393

393.17

... More
Crates, avg. lead upto 03 Kms

1

442

442.23

... More
Crates, avg. lead upto 04 Kms

1

489

489.56

... More
Crates, avg. lead upto 05 Kms

1

535

535.3

... More
Crates, avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Crates, avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Crates, avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour

-

-

-

... More
Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

17

17.05

... More
Steel for an average lead upto 50Mtr

1

249

249.61

... More
Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

36

36.63

... More
Soling for an avg. lead upto 50 mtr.

1

236

236.08

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand & 20mm Agg for an average lead upto 50Mtr

1

200

200.67

... More
Sand & 20mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
40mm Agg for an average lead upto 50Mtr

1

216

216.94

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

47

47.23

... More
Earth for an average lead upto 50Mtr

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Crates for an average lead upto 50Mtrs

1

146

146.51

... More
Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

21

21.5

... More
Empty Cement bags for an average lead upto 50Mtrs

1

37

37.46

... More
Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

8

8.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.