Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date6 Jun 2024
Closing Date14 Jun 2024
Tender Amount₹ 4,06,862 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (All kinds of soil)

1

89

89.75

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material Ordinary Rock

1

161

161

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Centring and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Centring and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. / Shelves (cast-in-situ)

1

718

718.2

... More
Centring and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, and cantilevers

1

577

577.55

... More
Centring and shuttering including strutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and struts.

1

742

742.55

... More
Edges of slabs and breaks in floors and walls (Under 20 cm wide)

1

262

262.2

... More
Centring and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls (Above 20 cm wide)

1

1145

1145.1

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars

1

115

115.35

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)

1

7877

7877.4

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

1455

1455.65

... More
RANDOM RUBBLE MASONRY:-Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry

1

7677

7677.35

... More
RANDOM RUBBLE MASONRY:-Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah

1

5402

5402.9

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone : quarry

1

5536

5536.55

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone Nallah

1

3262

3262.1

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone without bond stone Nallah

1

2793

2793.8

... More
Frames and trusses ; Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately) Second class kail wood

1

101081

101081.85

... More
KD Imported

1

60000

60000

... More
Popular wood

1

35000

35000

... More
Providing and fixing of sign board displaying salient features as per standard design/ size(1mx0.80m) with angle iron posts embedded in cement concrete block to be approved by Engineer in Charge including painting , lettering and cost of concrete block (complete job)

1

1500

1500

... More
Capturing and printing HD photographs (of size 4”x6”) on good quality standard photo paper

1

50

50

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

120

120.8

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted

1

142

142.9

... More
Welded

1

138

138.2

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete. 25mm thick with 12.5 mm nominal size stone aggregate

1

409

409.25

... More
40mm thick with 20 mm nominal size stone aggregate.

1

510

510.25

... More
50 mm thick with 20mm nominal size stone aggregate.

1

562

562.15

... More
C.G.I. SHEETS ROOFING ; Providing corrugated G. S. Sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gram/m2

1

974

974.05

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

852

852.5

... More
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. Or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete. 0.63 mm thick with zinc coating not less than 275 gram/m2

1

761

761.95

... More
CEMENT PLASTER; (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)

1

690

690.85

... More
1 : 6 ( 1 cement : 6 fine sand)

1

283

283.8

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)

1

569

569.45

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1725

1725.2

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

1064

1064.55

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

2516

2516.85

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

1458

1458.45

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. Complete. 150 mm dia. R.C.C. pipe-(6”)

1

398

398.35

... More
250 mm dia. R.C.C. pipe-(9”)

1

545

545.9

... More
300 mm dia. R.C.C. pipe-(12”)

1

746

746.2

... More
450 mm dia. R.C.C. pipe-(18”)

1

837

837.55

... More
600 mm dia. R.C.C. pipe-(24”)

1

1148

1148.6

... More
900 mm dia. R.C.C. pipe-(36”)

1

1751

1751.8

... More
1000 mm dia. R.C.C. pipe-(40”)

1

2902

2902.25

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

3591

3591.7

... More
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal

1

1622

1622.25

... More
On Top copings of banks

1

535

535.55

... More
On Slopes

1

673

673.8

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

693

693.95

... More
Dumping stone excluding cost of stones. in Horizontal on level

1

371

371.15

... More
on Slopes (Behind pitching)

1

237

237.9

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. Size of aggregates; 20mm nominal) @ 3.65 cum per 100Sqm on horizontal/side slopes; complete including curing.

1

261

261.45

... More
Opening out old wire crates those and re-binding after filling.

1

199

199.3

... More
Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

35

35.6

... More
Supply of Stone boulder (quarry) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

700

700

... More
Supply of Stone for masonry work (quarry) incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

1175

1175

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and

1

2400

2400

... More
Unloading sand/earth filled bags from boats placing in dry

1

7

7.8

... More
Placing in Water

1

9

9.25

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Dry

1

18

18.5

1

111

111

... More
Shingle clearance from canals

1

184

184.95

... More
From canals(including extraction of roots)

1

21

21.15

... More
SLIP CLEARANCE In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

13

13.45

... More
In soils; mixed with moorum / Kankar / shingle / boulders ; disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
In soils; mixed with Decomposed Rocks; by blasting or any other means

1

331

331.15

... More
Engagement of Labour / Bullock man with single bullock / Chowkidar / Belder/ Coolie/ Mali / sewer man / Helper (Technician) {unskilled labour}

1

411

411.4

... More
Mason (1st class), fitter (Grade-I),Carpenter(1st class), Black smith (1st class), Mistry, Technician etc.

1

553

553

... More
Supply of earth for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job, (earth measured in stacks will be reduced by 20% for payment)

1

1350

1350

... More
Supply of sand for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job

1

785

785

... More
Supply of crusher dust for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job,

1

1900

1900

... More
Supply of EC bags incl. Carriage, loading, unloading, etc. Complete job

1

1000

1000

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job ( Tyre type)

1

6

6

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job (Poclain type) Normal Boom

1

1400

1400

... More
Long boom

1

2200

2200

... More
Hire and running charges of light crane

1

3000

3000

... More
Providing of LDPE (Black polythene) to stop/ stop the leakages of canals / khuls/ minors

1

3500

3500

... More
Hire charges of vehicle during day or night along with licensed commercial driver for site inspection/emergency situation/ movement of officials/ carriage of material within divisional jurisdiction including Driver and POL on need basis only. (Upto 30Km Journey)

1

200

200

... More
For every km after 30 km

1

1200

1200

... More
Welding by electric plant wherein required incl. Transfer of welding machine/other equipment’s from plant to site and back.

1

500

500

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth.

1

60000

60000

... More
Beyond 60cm girth upto and including 120cm girth

1

379

379.05

... More
Surface dressing of the ground including removing vegetation and in-equalities, not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

1

1683

1683

... More
Providing & laying PVC (type – B) pipes with all the required accessories and carriages, complete job --- 150mm dia

1

2412

2412

... More
200mm dia

1

400

400

... More
250mm dia

1

500

500

... More
Carriage of material from Source to site of work, including loading, unloading and stacking etc. complete by Mechanical Transport i) Cement & steel, G.I/C.I pipe avg. lead upto 01 Kms

1

600

600

... More
Cement & steel, G.I/C.I pipe avg. lead upto 02 Kms

1

114

114.44

... More
Cement & steel, G.I/C.I pipe avg. lead upto 03 Kms

1

131

131.06

... More
Cement & steel, G.I/C.I pipe avg. lead upto 04 Kms

1

147

147.41

... More
Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms

1

163

163.19

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

178

178.43

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.92

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km

1

11

11.63

... More
Sand & Agg. 20 mm avg. lead of upto 01 Kms

1

9

9.81

... More
Sand & Agg. 20 mm avg. lead upto 02 Kms

1

128

128.75

... More
Sand & Agg. 20 mm avg. lead upto 03 Kms

1

147

147.44

... More
Sand & Agg. 20 mm avg. lead upto 04 Kms

1

165

165.84

... More
Sand & Agg. 20 mm avg. lead upto 05 Kms

1

183

183.58

... More
Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

200

200.74

... More
Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.66

... More
Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

11

11.04

... More
40 mm Agg. avg. lead of upto 01 Km

1

139

139.94

... More
40 mm Agg. avg. lead upto 2 Kms

1

160

160.26

... More
40 mm Agg. avg. lead upto 4 Kms

1

180

180.26

... More
40 mm Agg. avg. lead upto 5 Kms

1

199

199.55

... More
40 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

218

218.19

... More
40 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

17

17.03

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

14

14.23

... More
Stone soling avg. lead of upto 1 Km

1

12

12

... More
Stone soling avg. lead upto 2 Kms

1

151

151.47

... More
Stone soling avg. lead upto 3 Kms

1

173

173.46

... More
Stone soling avg. lead upto 4 Kms

1

195

195.1

... More
Stone soling avg. lead upto 5 Kms

1

215

215.98

... More
Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

236

236.16

... More
Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

18

18.43

... More
Stone soling avg. lead beyond 20 Kms per additional Km

1

15

15.4

... More
Earth avg. lead of upto 1 Km

1

12

12.98

... More
Earth avg. lead of upto 02 Km

1

160

160.93

... More
Earth avg. lead of upto 03 Km

1

184

184.3

... More
Earth avg. lead of upto 04 Km

1

207

207.3

... More
Earth avg. lead of upto 05 Km

1

229

229.48

... More
Earth avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

250

250.92

... More
Earth avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

19

19.58

... More
Earth avg. lead beyond 20 Kms per additional Km

1

16

16.36

... More
Bricks avg. lead of upto 1 Km

1

13

13.8

... More
Bricks avg. lead of upto 02 Km

1

343

343.32

... More
Bricks avg. lead of upto 03 Km

1

393

393.17

... More
Bricks avg. lead of upto 04 Km

1

442

442.23

... More
Bricks avg. lead of upto 05 Km

1

489

489.56

... More
Bricks avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

535

535.3

... More
Bricks avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

41

41.77

... More
Bricks avg. lead beyond 20 Kms per additional Km

1

34

34.9

... More
Carriage of material by manual from road site to actual site of work, including loading, unloading and stacking etc. complete by manual labour Cement for an avg. lead upto 50 mtr.

1

29

29.43

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

116

116.22

... More
Steel for an average lead upto 50 Mtr

1

17

17.05

... More
Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50 Mtrs

1

249

249.61

... More
Soling for an avg. lead upto 50 mtr.

1

36

36.63

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

236

236.08

... More
Sand & 20mm Agg for an average lead upto 50Mtr

1

51

51.4

... More
Sand & 20mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

200

200.67

... More
40mm Agg for an average lead upto 50Mtr

1

43

43.69

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

216

216.94

... More
Earth for an average lead upto 50Mtr

1

47

47.23

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

200

200.67

... More
Bricks for an average lead upto 50Mtr

1

43

43.69

... More
Bricks for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

3

3.75

... More
Note :- (1) If any item/ items not advertised in the above rate list but found necessary to be executed at site. The same shall be paid as per SSR 2022 on Contractors Appreciation / Depreciation.

-

-

-

... More
Note :- (2) Any item either not advertised or not provided in SSR 2022 shall be paid as per actual lowest market rates.

-

-

-

... More
Note :- (3) Any other dia of pipes/ pipe specials if required shall be issued by the department as per prevailing stock rates of the division.

-

-

-

... More
Note :- (4) The material which is issued by the Department, the cost of material shall be deducted as per prevailing stock rates of this Division

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.