Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department Tender

Civil And Construction
Irrigation Work
Eprocure
Opening Date4 Apr 2022
Closing Date11 Apr 2022
Tender Amount₹ 2,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Felling of trees of girth (measured at height of 1 mtr above ground) including cutting of trunk and branches, removing of roots and stacking of seviceable material and disposal of unserviceable material beyond a) Beyond 3-cm girth upto and including 60 cm girth

1

-

344.8

... More
b)beyond 60cm girth upto and including 120cm girtth

1

-

1530.8

... More
Providing Hydraulic excavator for emrgency works at site of work during flood or heavy rains and when required including cost of fuel and other allied charges,including haltage complete job.

1

-

1300

... More
Supply of earth during floods /heavy rains as and when required

1

-

258.25

... More
Dumping stone excI cost of stone in Horizontal on level.

1

-

216.4

... More
Hand packed stones into wire crates including cost of stones.

1

-

337.45

... More
Supply of stone boulders (nallah) during floods /heavy rains as and when required

1

-

400

... More
Filling e/c bags with availalble earth including cost of strings and sewing

1

-

7.1

... More
Placing of earth filled bags in position(Dry)

1

-

8.4

... More
Placing of earth filled bags in position(Wet)

1

-

16.8

... More
Laying of poythene sheets to prevent leakages

1

-

40

... More
Laying of Non presured NP2 class light duty RCC spun pipes with collors jointed with stiff mixture of cement mortar in proportion of 1:2 including testing of joints complete Job.a) (250mm )

1

-

380.8

... More
b) 12" (300 mm)

1

-

395.25

... More
c)18"(450mm)

1

-

575

... More
d)24"(600mm)

1

-

769

... More
e)36" (900mm)

1

-

1436.68

... More
Providing and fixing of corrugated HDPE pipes including all sorts of carriages upto site of work. a) 8"

1

-

2000

... More
b)12"

1

-

3800

... More
Silt Clearance from canals in Wet

1

-

168.25

... More
Silt Clearance from canals in Dry

1

-

100.95

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive

1

-

166.9

... More
Slip Clearance n ordinary soils disposal lead upto 50m and lift upto 1.5m

1

-

140.2

... More
b) In soils;mixed with moorum/Kankar/shingle/boulders;disposal lead upto 50m and lift upto 1.5m

1

-

301.15

... More
Supply of Labours

1

-

503

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)

1

-

1569.2

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

-

2289.25

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In Cement Motar

1

-

1326.55

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:in Cement Motar

1

-

1583.05

... More
Dismantling wooden ballies in posts and struts including stacking within 50 meters lead.

1

-

13.5

... More
Dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of rcc

1

-

179.9

... More
Providing & fixing of popular sawed wood in the form of josts, planks, structs etc for providing of wooden flume on canals in case or emergency including all accessories materials like nails etc and all sorts of carriages . Complete job as per direction of engineer incharge.

1

-

820

... More
Providing & fixing of plain GI tin sheets over flumes for cheaing leaks including accessories material and all sorts of carraiges.

1

-

95

... More
Cost of Geo Tagged Photographs ( both Soft and Hard Copy) size 4"x6"

1

-

60

... More
Deployement of JCB from transit camp to site of work incl. all charges applicable(halting hour).

1

-

900

... More
Construction of muthu bunds,comprising boulders and wood bushes in alternate layers;including working in water situations

1

-

1158.15

... More
Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking a1)earth 1km

1

-

148.44

... More
a for every additional km (actual as per site)

1

-

10.8

... More
c1) stone boulder 1km

1

-

139.71

... More
C2) for every additional km (actual as per site)

1

-

0.05

... More
f1)E/C bags from Divisional store av 1Km

1

-

0.05

... More
for every additional km (actual as per site)

1

-

-

... More
g1) crate mesh 1km

1

-

316.67

... More
g2) for every additional km (actual as per site)

1

-

23.05

... More
h1)Polythene 1km

1

-

0.02

... More
for every additional km (actual as per site)

1

-

0.01

... More
i) RCC spun pipes 12" 1km

1

-

12.36

... More
ii) for every additional km (actual as per site)

1

-

8.99

... More
i)RCC spun pipe 18" 1km

1

-

28.84

... More
ii) for every additional km (actual as per site)

1

-

20.98

... More
i) RCC spun pipes 24" 1km

1

-

43.26

... More
ii) for every additional km (actual as per site)

1

-

31.48

... More
i)RCC spun pipe 36" 1km

1

-

47.22

... More
ii) for every additional km (actual as per site)

1

-

64.89

... More
Carraige of Un-hygenic Material/ Sludge (Wet) 1st km (1st Km)

1

-

129.08

... More
for every additional km (actual as per site)

1

-

9.39

... More
Extra carriage of Materials from road site to site of work by Mannual labour/ponies Including loading unloading and stacking earth additional 50m

1

-

39.74

... More
b)E.C bags 1st 50m

1

-

0.03

... More
b2) for every additional 50m (actual as per site)

1

-

0.01

... More
c)crate mesh 1st 50m

1

-

133.26

... More
c2) for every additional 50m (actual as per site)

1

-

19.56

... More
d)poythene 1st 50m

1

-

0.01

... More
d2) for every additional 50m (actual as per site)

1

-

0.02

... More
i) RCC spun pipes 12" 1km

1

-

16.74

... More
ii) for every additional 50m (actual as per site)

1

-

2.45

... More
i) RCC spun pipes 18" 1km Ist 50mtrs

1

-

37.15

... More
ii) for every additional 50m (actual as per site)

1

-

5.45

... More
i) RCC spun pipes 24" Ist 50 mtr

1

-

40.86

... More
ii) for every additional 50m (actual as per site)

1

-

5.99

... More
i) RCC spun pipes 36" Ist 50mtr

1

-

64.89

... More
for every additional km (actual as per site)1.00

1

-

4.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.