Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date15 Mar 2025
Closing Soon4 Apr 2025
Tender Amount₹ 11,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:

1

467

467.3

... More
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.

1

276

276.6

... More
Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer-in-charge.

1

65

65.9

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :(All kinds of soil)

1

89

89.75

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with:

-

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level

-

-

-

... More
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Centering and shuttering including strutting, propping etc. and removal of form for:

-

-

-

... More
Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms. / Shelves (cast-in-situ)

1

718

718.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Mild steel and medium tensile steel bars

1

115

115.35

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :

-

-

-

... More
Cement mortar 1:4 ( 1 cement : 4 coarse sand)

1

7877

7877.4

... More
Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

1455

1455.65

... More
RANDOM RUBBLE MASONRY : Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand)

-

-

-

... More
Quarry

1

7677

7677.35

... More
Nallah

1

5402

5402.9

... More
Dry random rubble masonry with hard stone in foundation and plinth:

-

-

-

... More
With bond stone.

-

-

-

... More
Quarry

1

5536

5536.55

... More
Nallah

1

3262

3262.1

... More
Without bond stone

-

-

-

... More
Nallah

1

2793

2793.8

... More
Frames and trusses ; Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately)

-

-

-

... More
Second class kail wood

1

101081

101081.85

... More
KD imported

1

60000

60000

... More
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position or in flumes:

-

-

-

... More
Budloo / Fir wood

1

40509

40509.4

... More
Poplar Wood

1

25000

25000

... More
Providing/Fixing/Fabrication of Sign Board of M.S sheet size (3’x2’) of 2mm thickness to be fixed on angle iron frame of angle size 40x40x5mm thick of height 5’ above ground,fixed in plain cement concrete of mix 1:2:4 including painting, lettering/printing, All complete to the entire satisfaction of the Engineer in Charge.

1

1600

1600

... More
Capturing and printing HD photographs (of size 4”x6”) on good quality standard photo paper

1

50

50

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

120

120.8

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

-

-

-

... More
Riveted and bolted

1

142

142.9

... More
Welded

1

138

138.2

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete.

-

-

-

... More
25mm thick with 12.5 mm nominal size stone aggregate.

1

409

409.25

... More
40mm thick with 20 mm nominal size stone aggregate.

1

510

510.25

... More
50 mm thick with 20mm nominal size stone aggregate.

1

562

562.15

... More
C.G.I. SHEETS ROOFING ; Providing corrugated G. S. Sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.

-

-

-

... More
0.63 mm thick with zinc coating not less than 275 gram/m2

1

974

974.05

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

852

852.5

... More
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. Or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete.

-

-

-

... More
0.63 mm thick with zinc coating not less than 275 gram/m2

1

761

761.95

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

690

690.85

... More
CEMENT PLASTER; (IN FINE SAND) : 12mm Cement plaster of mix:

-

-

-

... More
1 : 4 ( 1 cement : 4 fine sand)

1

283

283.8

... More
1 : 6 ( 1 cement : 6 fine sand)

1

266

266.2

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:

-

-

-

... More
1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

2516

2516.85

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1458

1458.45

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

398

398.35

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 meters lead.

1

26

26.05

... More
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead.

1

38

38.9

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. Complete.

-

-

-

... More
150 mm dia. R.C.C. pipe-(6”)

1

545

545.9

... More
250 mm dia. R.C.C. pipe-(9”)

1

746

746.2

... More
300 mm dia. R.C.C. pipe-(12”)

1

837

837.55

... More
450 mm dia. R.C.C. pipe-(18”)

1

1148

1148.6

... More
600 mm dia. R.C.C. pipe-(24”)

1

1751

1751.8

... More
900 mm dia. R.C.C. pipe-(36”)

1

2902

2902.25

... More
1000 mm dia. R.C.C. pipe-(40”)

1

3591

3591.7

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25

... More
Dry stone pitching (any thickness) excluding cost of stones.

-

-

-

... More
On Horizontal

1

535

535.55

... More
On Top copings of banks

1

673

673.8

... More
On Slopes

1

693

693.95

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Dumping stone excluding cost of stones.

-

-

-

... More
in Horizontal on level

1

237

237.9

... More
on Slopes (Behind pitching)

1

261

261.45

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. Size of aggregates; 20mm nominal) @ 3.65 cum per 100Sqm on horizontal/side slopes; complete including curing.

1

199

199.3

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes. (Stack measurements reduced by 15%)

1

700

700

... More
Supply of Stone boulder (quarry) nominal size 225 mm incl. royalty and/or other taxes. (Stack measurements reduced by 15%)

1

1175

1175

... More
Supply of Stone for masonry work (quarry) incl. royalty and/or other taxes.

1

2400

2400

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

6

6.63

... More
Unloading sand/earth filled bags from boats

-

-

-

... More
Placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )

-

-

-

1

111

111

1

184

184.95

... More
Silt clearance from canals by mechanical means (hydraulic Excavator) Inclusive of initial lead and lift ( 50m & 1.5m respectively )

-

-

-

1

85

85

1

99

99

... More
Weed clearence

-

-

-

... More
From lakes(using boats)

1

21

21.15

... More
From canals(including extraction of roots)

1

13

13.45

... More
Slip Clearance

-

-

-

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
Engagement of Labour / Bullock man with single bullock /Chowkidar/Belder/ Coolie/ Mali/sewer man / Helper {unskilled labour}

1

553

553

... More
Engagement of Skilled labour(1st Class) like Mason, Technician, fitter, Blacksmith etc.

1

806

806

... More
Engagement of Skilled labour (2nd Class) like Mason, Painter, Carpenter.

1

734

734

... More
Boatman

1

625

625

... More
Engagement of Boat(Capacity up to 20cum)

1

1050

1050

... More
Petrol for running of departmental chain saw (wood cutter) inclusive of required admixtures

1

102

102

... More
Hire charges of Pump set of capacity 4000 litres/hour

1

700

700

... More
Vibrator (Needle type 40 mm)

1

350

350

... More
Hire charges for engagement of Chain saw (mechanical wood cutter) incl. Operator, fuel, maintenance, carriage, complete job.

1

1350

1350

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Supply of sand

1

770

770

... More
Supply of crusher dust

1

770

770

... More
Supply of EC bags as and where required, incl. all sorts of Carriage, loading, unloading, and stacking etc. Complete job

1

4

4.5

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job ( Tyre type)

1

1400

1400

... More
Hire charges for engagement of mech. Excavator incl. Operator, fuel, maintenance & transportation of excavator to & fro from site to source, complete job

-

-

-

... More
(Poclain type) Normal Boom

1

2200

2200

... More
Long Boom

1

3000

3000

... More
Hire and running charges of light crane

1

3500

3500

... More
Hire charges of vehicle (SUV Type) during day or night along with licensed commercial driver for site inspection/ emergency situation/ movement of officials indluding all sorts of taxes, parking charges, etc and POL on need basis only.

-

-

-

... More
Upto 30Km Journey

1

1500

1500

... More
For every km after 30 km

1

30

30

... More
Hire charges of vehicle (Load Carrier) during day or night along with licensed commercial driver for carriage of materials indluding all sorts of taxes, parking charges, loading/unloading/stacking etc and POL on need basis only.

-

-

-

... More
Upto 30Km Journey

1

1500

1500

... More
For every km after 30 km

1

30

30

... More
Disassembling and reassembling of chain saw wood cutter and making necessary repairs including all accessories required for repair work with all sorts of carriages, complete.

1

1200

1200

... More
Repairs to shutter by way of removing dents, kinks and setting of iron gate

1

950

950

... More
Lubricating, Greasing & oiling of winch machines after cleaning the machine including Disassembling, Realignment and reassembling of hydraulic gate (complete job)

1

1050

1050

... More
Repairs of worm or gear or screw rod or winch rod incl. Carriage of item involved from site to factory and back to site including Disassembling, Realignment, Greasing and reassembling of hydraulic gate

1

2000

2000

... More
Providing and fixing check nut of required dia and specification.

-

-

-

1

5000

5000

... More
Gun Metal

1

9000

9000

... More
Providing and fixing of threaded winch/sluice rod of required dia and specification including all sorts of carriages. Complete job.

-

-

-

1

400

400

... More
Gun Metal

1

750

750

... More
Repairs to side channels by way of removal of bends and kinks incl. Setting and fixing complete

1

750

750

... More
Providing & fixing of grease lids for winch machines

1

200

200

... More
Providing & fixing of coupling of required sizes

1

3000

3000

... More
Providing & fixing of rubber seal of approved quality for checking of leakages in hydraulic gates

1

500

500

... More
Welding by electric plant wherein required incl. Transfer of welding machine/other equipment’s from plant to site and back.

1

750

750

... More
Providing , Installation , commissioning of Single Winch machine complete set of standard quality of 3 tonne capacity with double threaded 50mm dia Winch rod, Gears , Pedestal Rain Cover ,Grease Lids, MS Sleeves, operating Handle with locking arrangement including greasing & oiling complete Job including all carriages & extra carriages upto site of work

1

40000

40000

... More
Providing , Installation , commissioning of Double Winch machine complete set of standard quality of 5 tonne capacity with coupling rod , coupling set double threaded 50mm dia Winch rod, Gears , Pedestal Rain Cover ,Grease Lids, MS Sleeves, operating Handle with locking arrangement including greasing & oiling complete Job including all carriages & extra carriages upto site of work

1

60000

60000

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
Beyond 30 cm girth upto and including 60 cm girth.

1

379

379.05

... More
Beyond 60 cm girth upto and including 120 cm girth.

1

1683

1683

... More
Providing/spreading and fixing of LDPE to check/stop the leakages of canals/khuls/minors including fixing/locking arrangements by any means through the entire length /breadth as per the requirement at site of work and desired by ENC complete in all respects

1

200

200

... More
Surface dressing of the ground including removing vegetation and in-equalities, not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

1

24

24.12

... More
Providing & laying PVC (type – B) pipes with all the required accessories and carriages, complete job

-

-

-

... More
150 mm dia

1

400

400

... More
200 mm dia

1

500

500

... More
250 mm dia

1

600

600

... More
Providing of 12mm thick marine plywood conforming to IS:710 with nails and screws etc, including all sorts of carriages upto the site of work as per the direction and to the entire satisfaction of the Engineer in Charge (Complete Job)

1

1049

1049.6

... More
Providing and serving hygienic pack of Non - veg biryani including sealed mineral water using one litre bottle,tissue paper etc.

1

230

230

... More
Providing and serving high quality hundred gram dry fruit packs in fresh bone china bowls at the site of service complete job

1

130

130

... More
Providing and serving superior quality Kehwa/tea including P/S of superior quality biscuits/cakes etc at the site of service complete job

1

50

50

... More
Providing and serving hygienic pack of veg lunch with one mineral water, tissue papers etc using/serving high quality bone china serving cups/saucers,plates, spoons , trays,etc including maintenance of hygiene at the site of service. Complete Job

1

300

300

... More
Supply of Paper Rims containing 500 Pages, 75 GSM of Spectra/JK Copier at Divisional office including all sorts of carriages

-

-

-

... More
A4 size

1

280

280

... More
Legal size

1

380

380

... More
File Cover

1

4

4

... More
Supply of Cartridges of standard quality at divisional office incl. all sorts of carriages

-

-

-

... More
HP Toner 110 A

1

1500

1500

... More
Hp Toner 88 A

1

1400

1400

... More
Toner(Ricoh model MP250ISP)

1

1900

1900

... More
Refilling of Cartriges of standard quality at divisional office incl. all sorts of carriages

-

-

-

... More
HP Tonner 110 A

1

400

400

... More
Hp Tonner 88 A

1

400

400

... More
Toner(Ricoh model MP250ISP)

1

500

500

... More
Carriage of material from Source/divisional store up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Cement & steel, G.I/C.I pipe avg. lead upto 01 Kms

1

114

114.44

... More
Cement & steel, G.I/C.I pipe avg. lead upto 02 Kms

1

131

131.06

... More
Cement & steel, G.I/C.I pipe avg. lead upto 03 Kms

1

147

147.41

... More
Cement & steel, G.I/C.I pipe avg. lead upto 04 Kms

1

163

163.19

... More
Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms

1

178

178.43

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kmsupto 10 Kms (per Km)

1

13

13.92

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

11

11.63

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km

1

9

9.81

... More
Sand &Agg. 20 mm avg. lead of upto 01 Kms

1

128

128.75

... More
Sand &Agg. 20 mm avg. lead upto 02 Kms

1

147

147.44

... More
Sand &Agg. 20 mm avg. lead upto 03 Kms

1

165

165.84

... More
Sand &Agg. 20 mm avg. lead upto 04 Kms

1

183

183.58

... More
Sand &Agg. 20 mm avg. lead upto 05 Kms

1

200

200.74

... More
Sand &Agg. 20 mm avg. lead beyond 5 Kmsupto 10 Kms (per Km)

1

15

15.66

... More
Sand &Agg. 20 mm avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

13

13.09

... More
Sand &Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

11

11.04

... More
40 mm Agg. avg. lead of upto 01 Km

1

139

139.34

... More
40 mm Agg. avg. lead upto 2 Kms

1

160

160.26

... More
40 mm Agg. avg. lead upto 3 Kms

1

180

180.26

... More
40 mm Agg. avg. lead upto 4 Kms

1

199

199.55

... More
40 mm Agg. avg. lead upto 5 Kms

1

218

218.19

... More
40 mm Agg. avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

17

17.03

... More
40 mm Agg. avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

14

14.23

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

12

12

... More
Stone soiling avg. lead of upto 1 Km

1

151

151.47

... More
Stone soiling avg. lead upto 2 Kms

1

173

173.46

... More
Stone soiling avg. lead upto 3 Kms

1

195

195.1

... More
Stone soiling avg. lead upto 4 Kms

1

215

215.98

... More
Stone soiling avg. lead upto 5 Kms

1

236

236.16

... More
Stone soiling avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

18

18.43

... More
Stone soiling avg. lead beyond 10 Kmsupto 20 Kms (per Km)

1

15

15.4

... More
Stone soiling avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Earth avg. lead of upto 1 Km

1

160

160.93

... More
Earth avg. lead of upto 02 Km

1

184

184.3

... More
Earth avg. lead of upto 03 Km

1

207

207.3

... More
Earth avg. lead of upto 04 Km

1

229

229.48

... More
Earth avg. lead of upto 05 Km

1

250

250.92

... More
Earth avg. lead beyond 05 Kmsupto 10 Kms (per Km)

1

19

19.58

... More
Earth avg. lead beyond 10Kmsupto20Kms (per Km)

1

16

16.36

... More
Earth avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
E.C bags avg. lead of upto 1 Km

1

51

51.5

... More
E.C bags avg. lead of upto 02 Km

1

58

58.98

... More
E.C bags avg. lead of upto 03 Km

1

66

66.33

... More
E.C bags avg. lead of upto 04 Km

1

73

73.43

... More
E.C bags avg. lead of upto 05 Km

1

80

80.3

... More
E.C bags avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

6

6.27

... More
E.C bags avg. lead beyond 10Kms upto20Kms (per Km)

1

5

5.23

... More
E.C bags avg. lead beyond 20 Kms per additional Km

1

4

4.41

... More
Crates, avg. lead upto 01 Kms

1

343

343.32

... More
Crates avg. lead upto 02 Kms

1

393

393.17

... More
Crates, avg. lead upto 03 Kms

1

442

442.23

... More
Crates, avg. lead upto 04 Kms

1

489

489.56

... More
Crates, avg. lead upto 05 Kms

1

535

535.3

... More
Crates, avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Crates, avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Crates, avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour

-

-

-

... More
Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

17

17.05

... More
Steel for an average lead upto 50Mtr

1

249

249.61

... More
Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50Mtrs

1

36

36.63

... More
Stone Soling for an avg. lead upto 50 mtr.

1

236

236.08

... More
Stone Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand & 20mm Agg for an average lead upto 50Mtr

1

200

200.67

... More
Sand & 20mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
40mm Agg for an average lead upto 50Mtr

1

216

216.94

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

47

47.23

... More
Earth for an average lead upto 50Mtr

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Crates for an average lead upto 50Mtrs

1

146

146.51

... More
Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

21

21.5

... More
Empty Cement bags for an average lead upto 50Mtrs

1

37

37.46

... More
Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

8

8.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.