Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date5 Jun 2024
Closing Date13 Jun 2024
Tender Amount₹ 7,59,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (All kinds of soil)

1

89

89.75

... More
Ordinary Rock

1

161

161

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

9821

9821.85

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms. / Shelves (cast-in-situ)

1

718

718.2

... More
Lintel, beams, plinth beams, girders, and cantilevers

1

577

577.55

... More
Columns, pillars, piers, abutments, posts and struts.

1

742

742.55

... More
Edges of slabs and breaks in floors and walls (Under 20 cm wide)

1

262

262.2

... More
Edges of slabs and breaks in floors and walls (Above 20 cm wide)

1

1145

1145.1

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Mild steel and medium tensile steel bars

1

115

115.35

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)

1

7877

7877.4

... More
Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

1455

1455.65

... More
RANDOM RUBBLE MASONRY:-Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry

1

7677

7677.35

... More
RANDOM RUBBLE MASONRY:-Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand) nallah

1

5402

5402.9

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone : quarry

1

5536

5536.55

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone : Nallah

1

3262

3262.1

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With out bond stone Nallah

1

2793

2793.8

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1

120

120.8

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted

1

142

142.9

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded

1

138

138.2

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete. 25mm thick with 12.5 mm nominal size stone aggregate

1

409

409.25

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete. 40 mm thick with 20 mm nominal size stone aggregate

1

510

510.25

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete. 50 mm thick with 20 mm nominal size stone aggregate

1

562

562.15

... More
CEMENT PLASTER; (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)

1

283

283.8

... More
CEMENT PLASTER; (IN FINE SAND) 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)

1

266

266.2

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:4:8 leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

2516

2516.85

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1458

1458.45

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

398

398.35

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25

... More
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal

1

535

535.55

... More
Dry stone pitching (any thickness) excluding cost of stones. On top coping of banks

1

673

673.8

... More
Dry stone pitching (any thickness) excluding cost of stones. On top coping of banks slopes

1

693

693.95

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Dumping stone excluding cost of stones. in Horizontal on level

1

237

237.9

... More
Dumping stone excluding cost of stones. On slope (Behind pitching)

1

261

261.45

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.

1

327

327.6

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

700

700

... More
Supply of Stone boulder (quarry) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

1175

1175

... More
Supply of Stone for masonry work (quarry) incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

2400

2400

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and

1

7

7.8

... More
Unloading sand/earth filled bags from boats placing in dry

1

9

9.25

... More
Unloading sand/earth filled bags from boats placing in wet

1

18

18.5

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Dry

1

111

111

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Wet

1

184

184.95

... More
Shingle clearance from canals

1

148

148

... More
From canals (including extraction of roots)

1

13

13.45

... More
SLIP CLEARANCE In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
In soils; mixed with moorum / Kankar / shingle / boulders ; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
In soils; mixed with Decomposed Rocks; by blasting or any other means

1

411

411.4

... More
Engagement of Labour / Bullock man with single bullock / Chowkidar / Belder/ Coolie/ Mali / sewer man / Helper (Technician) {unskilled labour}

1

553

553

... More
Mason (1st class), fitter (Grade-I),Carpenter(1st class), Black smith (1st class), Mistry, Technician etc.

1

806

806

... More
Supply of earth for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job, (earth measured in stacks will be reduced by 20% for payment)

1

700

700

... More
Supply of sand for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job

1

700

700

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth.

1

379

379.05

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth.

1

1683

1683

... More
Surface dressing of the ground including removing vegetation and in-equalities, not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

1

2412

2412

... More
Carriage of material from Source to site of work, including loading, unloading and stacking etc. complete by Mechanical Transport i) Cement & steel, G.I/C.I pipe avg. lead upto 01 Kms

1

114

114.44

... More
Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications: Painting wood work with deluxe multi surface paint of required shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.75litre/10sqm of approved brand and manufacture

1

147

147.05

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer

1

114

114.44

... More
Cement & steel, G.I/C.I pipe avg. lead upto 02 Kms

1

131

131.06

... More
Cement & steel, G.I/C.I pipe avg. lead upto 03 Kms

1

147

147.41

... More
Cement & steel, G.I/C.I pipe avg. lead upto 04 Kms

1

163

163.19

... More
Cement & steel, G.I/C.I pipe avg. lead upto 05 Kms

1

178

178.43

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

178

178.43

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.92

... More
Cement & steel, G.I/C.I pipe avg. lead beyond 20 Kms per additional Km

1

11

11.63

... More
Sand & Agg. 20 mm avg. lead of upto 01 Kms

1

128

128.75

... More
Sand & Agg. 20 mm avg. lead upto 02 Kms

1

147

147.44

... More
Sand & Agg. 20 mm avg. lead upto 03 Kms

1

165

165.84

... More
Sand & Agg. 20 mm avg. lead upto 04 Kms

1

183

183.58

... More
Sand & Agg. 20 mm avg. lead upto 05 Kms

1

200

200.74

... More
Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

15

15.66

... More
Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

11

11.04

... More
40 mm Agg. avg. lead of upto 01 Km

1

139

139.94

... More
40 mm Agg. avg. lead upto 2 Kms

1

160

160.26

... More
40 mm Agg. avg. lead upto 4 Kms

1

199

199.55

... More
40 mm Agg. avg. lead upto 5 Kms

1

218

218.19

... More
40 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

17

17.03

... More
40 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

14

14.23

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

12

12

... More
Stone soling avg. lead of upto 1 Km

1

151

151.47

... More
Stone soling avg. lead upto 2 Kms

1

173

173.46

... More
Stone soling avg. lead upto 3 Kms

1

195

195.1

... More
Stone soling avg. lead upto 4 Kms

1

215

215.98

... More
Stone soling avg. lead upto 5 Kms

1

236

236.16

... More
Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

18

18.43

... More
Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.4

... More
Stone soling avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Earth avg. lead of upto 1 Km

1

160

160.93

... More
Earth avg. lead of upto 02 Km

1

184

184.3

... More
Earth avg. lead of upto 03 Km

1

207

207.3

... More
Earth avg. lead of upto 04 Km

1

229

229.48

... More
Earth avg. lead of upto 05 Km

1

250

250.92

... More
Earth avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

19

19.58

... More
Earth avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

16

16.36

... More
Earth avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
Bricks avg. lead of upto 1 Km

1

343

343.32

... More
Bricks avg. lead of upto 02 Km

1

393

393.17

... More
Bricks avg. lead of upto 03 Km

1

442

442.23

... More
Bricks avg. lead of upto 04 Km

1

489

489.56

... More
Bricks avg. lead of upto 05 Km

1

535

535.3

... More
Bricks avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Bricks avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Bricks avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Carriage of material by manual from road site to actual site of work, including loading, unloading and stacking etc. complete by manual labour Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

17

17.05

... More
Steel for an average lead upto 50 Mtr

1

249

249.61

... More
Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50 Mtrs

1

36

36.63

... More
Soling for an avg. lead upto 50 mtr.

1

236

236.08

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand & stone below 40mm Agg for an average lead upto 50Mtr

1

200

200.67

... More
Sand & stone below 40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
sand & stone agg40mm and above for an average lead upto 50Mtr

1

216

216.94

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

47

47.23

... More
Earth for an average lead upto 50Mtr

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Bricks for an average lead upto 50Mtr

1

374

374.58

... More
Bricks for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

81

81.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.